![]() |
||
S. 2307, FY 1999 Department of Transporation Appropriations Act (Report)
(continued)
Rotorcraft procedures .--The Committee anticipates that air traffic
control [ATC] systems will, in the near future, be able to provide dispatch reliability, or instrument flight rules [IFR] capability for both helicopters and the newest rotocraft technology--tiltroter aircraft. Under the present ATC system, the only current IFR, or all-weather-capable, airspace control service is designed for runway approaches and departures. Rotorcraft operating from off-airport sites lack efficient and consistent all-weather dispatch availability and reliability. The Committee encourages the FAA to review its existing terminal instrument procedures [TERPS] and IFR regulations/procedures and determine if changes are needed to facilitate the takeoff, flight and landing of helicopters, and tiltrotor aircraft. Special attention should be given to the feasibility of TERPS revisions which include procedures to provide noninterfering simultaneous operations and tiltrotor conversion/transition zones or procedures. The National Airspace System [NAS] would be improved by separating vertical flight aircraft from congested fixed-wing flight paths, and the Committee encourages the FAA to review the current procedures in this area. National airspace redesign. --The Committee has included $11,000,000 to support the administration's initiative to comprehensively review and design the domestic and oceanic airspace within the United States. Of this amount, $3,000,000 is provided to concentrate the administration's initial efforts on the eastern region, particularly on the redesign of the New York/New Jersey metropolitan airspace, consistent with the administration's plans. These initial efforts will support the planning and design challenges in the New York/New Jersey region's airspace, the most complex and densely traveled airspace in the world. The national and regional redesign will take advantage of new technologies, such as satellite navigation and aircraft capabilities, and new flight paths. The Committee encourages the administration to ensure that the final result of the redesign will deliver the greatest safety, efficiency and environmental benefits to system operators, users and citizens near airports, particularly those who are affected by air noise. Leased telecommunication services/RCL. --In the report accompanying last year's appropriation bill as well as in this report, the Committee has expressed concern about underutilization of the radio communications link [RCL], which is owned by FAA and is one of the largest microwave networks in the country. The alternative to increased use of the RCL is increased reliance on leased telecommunications. The Committee directed FAA to transfer to the radio communications link as much of the existing workload as possible to better utilize that resource. The Committee understands that FAA plans to use an additional 2,300 to 2,900 RCL circuits rather than leasing circuits from a private vendor. Even if FAA adopts this plan, it would still only be utilizing 56 to 61 percent of its analog circuits and still have a significant amount of digital capacity sitting idle. The Committee has concluded that FAA is likely to continue to underutilize its radio communications link [RCL] network in favor of leased telecommunications. The Committee suggests that FAA accommodate constrained air traffic services appropriations by disposing of a part of its underutilized RCL network and taking staffing savings. The Committee requests a report by March 1, 1999, from the FAA outlining a plan to more fully utilize RCL or a plan to decommission it. Given that FAA will apparently continue to underutilize the RCL and prefers leased telecommunications links, the Committee is recommending a reduction of $10,000,000 from the request for the systems maintenance subactivity. Digital mapping .--The Committee is aware that at St. Louis-Lambert international air traffic control tower the video mapper used for the final approach course was considered unusable by FAA standards thus cutting capacity during certain weather conditions. It was replaced with a digital mapper in order to keep capacity up and to meet standards to run simultaneous approaches. Controllers at the facility seek expanded use of the digital mapper. The Committee directs the FAA to work with the controllers at the St. Louis tower to expand the use of the digital mapping equipment consistent with all applicable safety standards. FAA data bases .--Over time, FAA has invested substantial resources in the development and maintenance of a large number of data bases. The growth and proliferation of data bases is a consequence of a number of factors including the wide scope of FAA's responsibilities, its organizational structure, and the widely differing dynamics of various components of the aviation industry. However, responsibility and/or control over the data bases is not centralized; instead it is spread among the various lines of business and other organizational elements who are the prime users of the data collected. There is little agencywide data integration. As such, FAA is becoming increasingly data rich and information poor. Accordingly, the Committee believes that the FAA should develop a data management plan that leads to optimized data sharing among FAA organizational elements; better control over the costs of data base management; the capability to review and analyze data on a subject as well as a functional basis; and enhanced capability of senior management to resolve time critical questions and issues that may cut across agency organizational elements. A report on the progress toward development of the plan should be made to the Senate Appropriations Committee and the House Appropriations Committee not later than 6 months from the date this legislation is enacted into law. Aviation regulation and certification The Committee recommends an appropriation of $624,879,000. Guidelines .--The Committee is concerned that FAA's proposed policy guidelines regarding the authority of law enforcement officers to carry weapons aboard aircraft may not adequately reflect the requirement that U.S. Secret Service personnel be able to carry firearms aboard aircraft in the most expeditious manner in the execution of their official duties. The protective mission of the Secret Service is unique, time sensitive, and critical to national security. The Committee believes it is imperative that special agents and officers of the Secret Service be included within any guidelines which provide the highest and most efficient level of access afforded to armed law enforcement officers on board aircraft. The FAA is directed to provide the Secret Service with the most unrestricted access provided to any law enforcement personnel in any issued regulations. The FAA shall keep this Committee informed as language is being formulated in regard to this issue. Aviation Security The Committee recommends $111,429,000, an increase of $13,950,000 over fiscal year 1998. Research and Acquisition The Committee recommends $92,340,000, the same level appropriated in fiscal year 1998. Administration of Airports The Committee recommends $47,891,000, the same level appropriated in fiscal year 1998. Commercial Space Transportation The Committee recommends $6,168,000, the same level appropriated in fiscal year 1998. Administration The Committee recommends $256,493,000, the same level appropriated in fiscal year 1998. Mentor-Protege Program. --The Committee supports the goals and objectives of the mentor-protege program, which was established by the FAA in 1997 in order to enhance the capabilities of socially and economically disadvantaged businesses, women-owned small businesses and other eligible entities, to compete for and successfully perform FAA contracts. The Committee encourages FAA procurement officials to use the program as a means of broadening the base of contractors who ultimately could compete for FAA contracts. The Committee is concerned, however, that despite the fact that three large companies have been approved to serve as mentors, no subcontracts have been awarded, to date, to protege firms because FAA procurement officials have opted not to use the program. In that regard, the Committee directs FAA to provide a report to the Senate and House Appropriations Committees within 6 months from the date of passage of this legislation on the progress of the Mentor-Protege Program and the impediments to its successful implementation. Reprogrammings .--The Committee is extremely concerned with the inspector general's recent findings of major variances in amounts proposed for reduction by budget line item to actual amounts reprogrammed. The FAA should not make changes to congressionally approved reprogramming notices, without congressional concurrence. To increase oversight in this area, the Administrator is directed to provide the House and Senate Committees on Appropriations, with line by line accounts of all future reprogramming actions taken subsequent to approval by Congress. Staff Offices The Committee recommends $73,193,000, the same level appropriated in fiscal year 1998. BILL LANGUAGE Second career training program .--The Committee has included bill language which was included in the President's budget request which prohibits the use of appropriated funds for the second career training program. This prohibition has been carried in annual appropriations acts for many years. Sunday premium pay .--The bill retains a provision, first included in the fiscal year 1995 appropriations bill, which prohibits FAA from paying Sunday premium pay, except in those cases where the individual actually worked on a Sunday. This provision is identical to that which was in effect for fiscal years 1995 98. It was requested by the administration for fiscal year 1999. Manned auxiliary flight service stations .--The Committee has retained bill language which was requested by the administration to prohibit the use of funds for operating a manned auxiliary flight service station in the contiguous United States. There is no funding provided in the ``Operations'' account for such stations in fiscal year 1999. Contract tower program .--The Committee has included language for a contract tower cost-sharing program. Secretary's discretionary transfer funds .--The Committee has included language that provides authority for the Secretary to transfer up to $60,000,000 from Coast Guard operating expenses, for the purpose of air traffic control operations and maintenance to enhance aviation safety and security. FACILITIES AND EQUIPMENT (Airport and Airway Trust Fund) Appropriations, 1998\1\ $1,900,477,000 Budget estimate, 1999 2,130,000,000 Committee recommendation 2,044,683,269 \1\Includes funds provided in the Fiscal Year 1998 Supplemental Appropriations Act. Under the ``Facilities and equipment'' appropriation, safety, capacity and efficiency of the Federal airway system are improved by the procurement and installation of new equipment and the construction and modernization of facilities to keep pace with aeronautical activity and in accordance with the Federal Aviation Administration's comprehensive capital investment plan [CIP], formerly called the national airspace system [NAS] plan. CIP MILESTONES FOR MAJOR SYSTEM ACQUISITIONS System name Year of first-site implementation Year of last-site implementation 1983 NAS plan 1991 CIP 1993 CIP 1997 CIP 1998 CIP 1983 NAS plan 1991 CIP 1993 CIP 1997 CIP 1998 CIP Advanced automation system [AAS] 1990 1991 1991 (\1\) (\1\) 1994 2001 2004 (\1\) (\1\) Air route surveillance radar [ARSR 4] 1998 1993 1994 1996 1996 1991 1996 1996 (\7\) 1999 Airport surface detection equipment [ASDE 3] 1987 1992 1993 1993 1993 1990 1994 1996 1999 1999 Automated weather observing system [AWOS] 1986 1989 1989 1989 1989 1990 1997 1997 2001 2002 Central weather processor [CWP] 1990 1991 1991 1991 1991 1991 1998 \8\1992 \8\1993 \8\1993 Flight service automation system [FSAS] 1984 1991 1991 1991 1991 1989 1995 1994 1995 1995 Mode S 1988 1993 1994 1994 1994 1993 1996 1996 1999 1999 Radio microwave link [RML] replacement and expansion 1985 1986 1986 1986 1986 1989 1994 1993 1993 1993 Terminal doppler weather radar [TDWR] (\9\) 1994 1994 1994 1994 (\9\) 1996 1996 (\10\) 2001 Voice switching and control system [VSCS] 1989 1995 1995 1995 1995 1992 1997 1997 1997 1997 \1\The AAS Program has been restructured into three areas: En route [DSR], terminal [STARS], and tower [TAP]. \2\STARS schedule was being rebaselined in keeping with new acquisition strategy. \3\TCCC schedule was being rebaselined to reflect the incorporation of surface management advisor [SMA]. \4\TCCC has been replaced by the Tower Automation Program [TAP]. \5\The Tower Automation Program [TAP] schedule is currently under review. \6\The Tower Automation Program [TAP] has been terminated. \7\ARSR 4 last-site implementation date had not been determined due to environmental issues at Ajo, AZ. \8\Dates denoted are for MWP I only. The CWP RWP segment has been eliminated as a continuation of the CWP Program, and has been merged with MWP II into the Weather and Radar Processor [WARP] Program. \9\The TDWR was not included in the 1983 NAS plan. \10\TDWR last-site implementation indefinite due to site availability and land acquisition problems. Source: FAA 1983 NAS plan; 1991 and 1993, 1995 CIP; 1997 and 1998 GAO ``Status of the FAA's Modernization Program.'' REASONS FOR DELAY AND COST INCREASES IN CIP PROJECTS System name Reasons for delay Advanced automation system [AAS] In general, AAS delays were due to an overly ambitious plan, inadequate FAA oversight of the contractor, and ineffective resolution of requirements issues. The AAS Program has been restructured into three areas: En route, terminal, and tower. Air route surveillance radar [ARSR 4] Problems with the radar's development and site preparation delayed first-site implementation. Testing took longer than originally expected. Delays have also occurred due to changes in system design, interface problems with other ATC systems, and slips in site construction. Recent delays are due to environmental issues at Ajo, AZ, which is the last site. Airport surface detection equipment [ASDE 3] Original delays occurred because FAA and the contractor underestimated software complexity. FAA changed some requirements, and testing uncovered some performance problems. Software development, establishing remote towers, site selection/preparation, and the addition of seven systems have delayed the program. Automated weather observing system [AWOS] Site prep, installation, and maintenance problems, as well as delays in receiving Government-furnished equipment contributed to original delays. Last-site implementation delay occurred because of communications funding shortfalls and installation delays of the communications infrastructure to deliver weather information. Recent delays are associated with the addition of ASOS systems per fiscal years 1997 98 congressional direction. Central weather processor [CWP] Early software development problems and software discrepancies during testing delayed the system in early stages. The program was descoped to just the CWP-MWP I segment, which is now fully implemented. Flight service automation system [FSAS] Original delays occurred because of software development and testing problems with the Model I system. Program implementation is complete. Mode S Problems in developing hardware and software during initial phases delayed the system, and software problems caused a delay in first-site implementation. Implementation of the last site has been moved due to en route interface requirements and site preparation delays. Radar microwave link [RML] replacement and expansion In the early stages, site acquisition and prep problems delayed the system. Other delays occurred because of a change in the prime contractor and due to problems encountered during operational test and evaluation. Program implementation is complete. Terminal doppler weather radar [TDWR] Site availability and land acquisition problems have delayed last-site implementation. Recent delays are associated with land procurement and environmental issues at the last five sites (Fort Lauderdale, San Juan, Las Vegas, Midway, and New York). Voice switching and control system [VSCS] Early delays were due to the two prototype contractors having technical difficulties in meeting FAA's requirements for system reliability. Additional delays occurred because of software development and integration problems during the upgrade of the prototype to a production model. The implementation schedule has not changed since the 1991 CIP. The last-site implementation was achieved on schedule in February 1997. The bill includes an appropriation of $2,044,683,269 for the facilities and equipment of the Federal Aviation Administration. The Committee's recommended distributions of the funds for each of the major accounts are as follows: FACILITIES AND EQUIPMENT Projects Fiscal year 1999 budget estimate Committee recommendation Engineering, development, test, and evaluation: En route programs: Aviation weather services improvements $26,300,000 $26,300,000 Oceanic automation system 16,937,000 3,237,000 Next generation VHF air/ground communications system 500,000 4,706,000 Air traffic management [ATM] 47,800,000 64,300,000 Traffic flow management 3,287,000 3,287,000 En route automation program 118,000,000 113,000,000 Aeronautical data link [ADL] 16,500,000 23,000,000 ---------------------------------- -------------------------- Subtotal, en route programs 229,324,000 237,830,000 ================================== ========================== Terminal programs: Terminal Automation Program 74,700,000 74,700,000 Runway incursion reduction 3,168,000 9,168,000 Airport technology 7,383,000 5,000,000 ---------------------------------- -------------------------- Subtotal, terminal programs 85,251,000 88,868,000 ================================== ========================== Landing and navigational aids programs: Local area augmentation system [LAAS] 6,500,000 6,500,000 Wide area augmentation system [WAAS] for GPS 101,500,000 117,500,000 Navigation and surveillance 13,285,000 13,285,000 Loran-C upgrades 10,000,000 ---------------------------------- -------------------------- Subtotal, landing and navigational aids programs 121,285,000 147,285,000 ================================== ========================== Research, test, and evaluation equipment and facilities: Independent operational test and evaluation [IOT&E] sup 3,500,000 3,500,000 FAA Technical Center facility--technical building lease 5,290,000 5,290,000 NAS improvement of system support laboratory 2,000,000 2,000,000 Technical Center facilities 7,000,000 7,000,000 ---------------------------------- -------------------------- Subtotal, research, test, and evaluation equipment and facilities 17,790,000 17,790,000 ---------------------------------- -------------------------- Total, engineering, development, test, and evaluation 453,650,000 491,773,000 ================================== ========================== Air traffic control facilities and equipment: En route programs: Long Range Radar [LRR] Program--replace/establish 5,700,000 5,700,000 En Route Automation Program 196,400,000 196,400,000 Next generation weather radar [Nexrad]--provide 4,900,000 4,900,000 Air traffic operations management system [ATOMS] 1,000,000 1,000,000 Weather and radar processor [WARP] 20,000,000 22,200,000 Aeronautical data link [ADL] applications 600,000 600,000 ARTCC building improvements/plant improvements 63,931,563 63,931,563 Voice switching and control system [VSCS] 14,500,000 12,500,000 Air traffic management 47,600,000 47,600,000 Critical communications support 2,400,000 1,850,000 DOD base closure--facility transfer 1,000,000 1,000,000 Backup emergency communications [BUEC]--interim 8,500,000 8,500,000 Air/ground communication radio frequency interference [RFI] 1,600,000 1,600,000 ATC beacon interrogator [ATCBI] replace 14,800,000 14,800,000 Air traffic control en route radar facilities 5,300,000 5,300,000 En route communications and control facilities improvement 3,126,731 2,000,000 Volcano monitor 2,000,000 ---------------------------------- -------------------------- Subtotal, en route programs 391,358,294 391,881,563 ================================== ========================== Terminal programs: Terminal doppler weather radar [TDWR]--provide 4,300,000 1,800,000 Terminal Automation Program 135,300,000 135,300,000 Airport surface detection equipment [ASDE] 5,600,000 5,600,000 Airport movement area safety system [AMASS] 7,000,000 9,800,000 Terminal air traffic control facilities--replace 82,300,000 82,300,000 Air traffic control tower [ATCT]/TRACON facilites--improve 22,722,280 22,722,280 Terminal voice switch replacement [TVSR] 11,500,000 10,300,000 Employee safety/OSHA and environmental compliance standards 22,000,000 22,000,000 Chicago TRACON 500,000 500,000 New Austin Airport at Bergstrom 2,500,000 2,500,000 Potomac TRACON 11,900,000 Northern California TRACON 27,600,000 17,900,000 Atlanta TRACON 18,200,000 12,200,000 Emergency transceivers--replacement 1,000,000 Airport surveillance radar [ASR 9] 6,300,000 6,300,000 Voice Recorder Replacement Program [VRRP] 3,000,000 3,000,000 NAS infrastructure management systems [NIMS] 22,000,000 22,000,000 Terminal facilities integration 5,600,000 Terminal digital radar [ASR 11] 76,100,000 76,100,000 ASR--weather system processor [WSP] 16,100,000 11,900,000 DOD/FAA facilities transfer 3,600,000 1,000,000 Precision runway monitors 3,300,000 3,300,000 Terminal radar [ASR]--improve 2,773,431 2,773,431 Terminal communications improvements 1,119,807 1,119,807 ---------------------------------- -------------------------- Subtotal, terminal programs 492,315,518 450,415,518 ================================== ========================== Flight service programs: Flight service station [FSS] automation 2,000,000 1,000,000 Automated surface observing system [ASOS] 9,900,000 20,977,000 FSAS operational and supportability implementation system [OASIS] 25,500,000 16,000,000 Flight service facilities improvement 1,364,400 1,364,400 ---------------------------------- -------------------------- Subtotal, flight services 38,764,400 39,341,400 ================================== ========================== Landing and Navigational Aids Program: VOR/DME/TACAN network plan 1,000,000 1,000,000 Instrument landing system [ILS]--establish/upgrade 8,000,000 18,000,000 ILS replace Mark 1A, 1B, and 1C 2,100,000 2,100,000 Tactical landing system 3,000,000 Low level windshear alert system [LLWAS]--upgrade to phase I 3,000,000 3,000,000 Approach Lighting System Improvement Program [ALSIP] 1,000,000 2,500,000 Runway visual range [RVR] 2,000,000 2,000,000 Gulf of Mexico Offshore Program 2,400,000 2,400,000 Distance measuring equipment [DME]--sustain 1,200,000 1,200,000 Wide area augmentation system for GPS 16,000,000 Nondirectional beacon [NDB]--sustain 1,000,000 1,000,000 Visual NAVAIDS--establish/expand 400,000 400,000 Navigational and landing aids--improve 2,761,788 8,761,788 ---------------------------------- -------------------------- Subtotal, landing and navigational aids 40,861,788 45,361,788 ================================== ========================== Other ATC facilities programs: Alaskan NAS interfacility communications system [ANICS] 3,500,000 6,000,000 Fuel storage tank replacement and monitoring 10,600,000 10,600,000 FAA buildings and equipment--improve/modernize 8,000,000 4,000,000 Electrical power systems--sustain/support 20,400,000 15,000,000 Air navigational aids and air traffic control facilities (local projects) 2,000,000 2,000,000 Computer-aided engineering graphics [CAEG] replacement 1,000,000 1,000,000 Aircraft and Related Equipment Program 5,000,000 2,000,000 ---------------------------------- -------------------------- Subtotal, other ATC facility programs 50,500,000 40,600,000 ---------------------------------- -------------------------- Total, air traffic control facilities and equipment 1,013,800,000 967,600,269 ================================== ========================== Nonair traffic control facilities and equipment: Support equipment: NAS Management Automation Program [NASMAP] 800,000 800,000 Hazardous materials management 17,000,000 17,000,000 Aviation safety analysis system [ASAS] 11,600,000 11,600,000 Operational data management system [ODMS] 1,200,000 1,000,000 Logistics support systems and facilities 2,300,000 2,300,000 Test equipment--maintenance support for replacement 500,000 500,000 Integrated flight quality assurance 3,000,000 3,000,000 Safety performance analysis system [SPAS] 3,500,000 3,500,000 Performance enhancement system [PENS] 9,700,000 9,700,000 National Aviation Safety Data Analysis Center [NASDAC] 1,800,000 1,800,000 FAA employee housing--provide 8,000,000 8,000,000 Facility security risk management 1,000,000 1,000,000 Information security--NAS information coordination 2,000,000 2,000,000 Explosive detection systems 100,000,000 ---------------------------------- -------------------------- Subtotal, support equipment 162,400,000 62,200,000 ================================== ========================== Training, equipment, and facilities: Distance learning 2,100,000 National airspace system [NAS] training facilities 400,000 400,000 Aeronautical Center training and support facilities 12,000,000 12,000,000 ---------------------------------- -------------------------- Subtotal, training, equipment, and facilities 14,500,000 12,400,000 ---------------------------------- -------------------------- Total, nonair traffic control facilities and equipment 176,900,000 74,600,000 ================================== ========================== Mission support: System support and services: System engineering and development support 29,800,000 28,960,000 Program support leases 31,100,000 27,500,000 NAS modernization integration 8,000,000 8,000,000 Logistics support services 5,600,000 5,600,000 Mike Monroney Aeronautical Center--lease 14,800,000 14,800,000 In-plant national airspace system [NAS] contract support services 2,000,000 2,000,000 Transition engineering support 41,800,000 41,800,000 Frequency and spectrum engineering--provide 2,700,000 1,500,000 Permanent change of station [PCS] 3,500,000 2,500,000 FAA system architecture 4,500,000 2,000,000 Technical services support contract [TSSC] 51,000,000 47,550,000 Resource Tracking Program [RTP] 1,000,000 500,000 Center for Advanced Aviation System Development 57,000,000 57,000,000 Year 2000 date change program 36,000,000 36,000,000 ---------------------------------- -------------------------- Total, mission support 280,800,000 275,710,000 ================================== ========================== Personnel and related expenses 235,210,000 235,000,000 ---------------------------------- -------------------------- Total, all activities 2,130,000,000 2,044,683,269 engineering, development, test, and evaluation The Committee recommends $369,973,000 for various engineering, development, test, and evaluation activities. En route programs En route automation includes the display system replacement [DSR] as a cost-effective modification to the initial sector suite system [ISSS]; display channel complex rehost [DCCR], a low-risk contingency system; advanced en route automation [AERA], enhancements providing direct benefits to airway users; en route software development support [ERSDS], maintains software in existing system; en route automation equipment, maintains existing hardware; flight data input/output [FDIO]; and en route stand alone radar training system [ESARTS]. Aviation weather service improvements .--The Committee has included $26,300,000 as requested by the administration. Oceanic automation system .--The FAA has already canceled phase two of the project and FAA actions to reprogram fiscal year 1998 funds and to reduce the fiscal year 1999 budget raise questions as to the priority of this initiative. Moreover, many FAA officials involved with this project have argued for a revision of the project's scope. The Committee recommends a reduction for this project and notes that project officials report that fiscal year 1998 funds remain to complete the data link segment of phase one and to fund initial system maintenance. Air traffic management [ATM] .--The Committee recommends an increase in this activity in order to support higher priority items in ATM activities identified by the administration. The Committee recommendation includes funding to support the revised approach to accelerate the testing and deployment of the traffic management advisor single center and the passive final approach spacing tool. These tools will provide controllers with increased capability to make efficient decisions regarding the sequencing and runway assignments of terminal arrival aircraft and en route arrival aircraft. The Committee is aware of the administration's plan to expedite early deployment of free flight phase I technologies by December 2002 at the sites identified by the Free Flight Select Committee. The Committee believes that one of the most important free flight phase I core capability programs is the center/TRACON automation system, which consists of traffic management advisor single center and passive final approach spacing tool [passive FAST]. The Committee supports the completion of the FAA's existing feasibility study that will determine if passive FAST can be implemented at the New York TRACON without multicenter TMA. The Committee directs that if the feasibility study shows that passive FAST can be implemented in the New York TRACON, the FAA should do so as soon as possible. If the FAA implements passive FAST at the New York TRACON, the Committee believes that the FAA should focus its priority for site adaptation of passive FAST on the airport with the highest levels of congestion as measured by air traffic control delays per 1,000 operations. The Committee directs the Administrator to provide, within 60 days, a report detailing the timeline and funding profile for implementation of passive FAST, if feasible, at the major commercial airports served by the New York TRACON. En route automation program .--In addition to the recommended funding level, the Committee provided reprogramming approval for the host hardware and software suite replacement and the FAA has scaled back the conflict probe effort from implementation at 20 centers to 5 centers. In addition, the conflict probe has unobligated balances in excess of $5,000,000 in this account. The Committee has reduced the requested levels accordingly. Aeronautical data link [ADL] .--The Committee recommendation has been increased by $6,500,000 in this activity to support higher items identified by the FAA. Terminal programs Terminal automation program. --The Committee has provided the requested $74,700,000 for the terminal automation program, also known as standard terminal automation replacement system [STARS]. The contract was awarded in September 1996. Fiscal year 1999 funds will be used to continue to test and enhance commercial-off-the-shelf/nondevelopmental item [COTS/NDI]-based automated radar terminal systems for initial use in terminal radar approach control facilities and to develop the final system capability. The STARS contract is an exceptionally aggressive contract. For a variety of reasons, the FAA is behind schedule in developing the full service software for the initial STARS configuration and the development of STARS software entails several risks that are likely to cause further delays. In addition, the computer-human interface issues that have emerged in the last 9 months are likely to necessitate further software requirements growth. Current estimates anticipate a 6- to 9-month delay in the program and cost growth in excess of $200,000,000. The FAA and the contractor have acknowledged the risk that the software development schedule may slip by several months and they currently have risk mitigation efforts underway. The Committee recommendation includes the entire request for the STARS Program, but the Committee is increasingly concerned about program slippages, cost growth, and the severity of the computer-human interface problems. The Committee is increasingly concerned that procurements like STARS, WAAS, and the deepwater capability replacement program are beyond the capability of the Department to manage given the complexity of the systems and the critical nature of the external factors that influence program development. The Committee would urge the Department to approach modernization efforts in a more incremental manner, rather than attempting--with an exceptionally high probability of failure--to revolutionize entire functions or capabilities with a single procurement. Runway incursion reduction .--The Committee recommends an increase of $6,000,000 in this program for the inclusion of a surface movement adviser demonstration initiative. The demonstration would test a collection of tools that provide terminal data to participating airlines and permit the exchange of data that support the efficient movement of aircraft on the airport surface. Airport technology .--The Committee recommends $5,000,000 for this account, the same amount as appropriated in fiscal year 1998. Landing and navigational aids programs Local area augmentation system [LAAS] for GPS .--The Committee has included $6,500,000 as requested by the administration. Wide area augmentation system [WAAS] .--The Committee reiterates the concern expressed in the fiscal year 1998 appropriations legislation concerning the wide area augmentation system. Accuracy, integrity, availability, continuity, and service volume are the major performance goals for the system. Accuracy is defined as the degree to which an aircraft's position as calculated using the system conforms to its true position. Integrity is the system's ability to provide timely warnings when its signals are providing erroneous information and, accordingly, should not be relied upon for navigation. Availability is the probability that, at any given time, the system will meet FAA's accuracy and integrity requirements for a specified phase of flight. Continuity is the probability that the system's signal will meet accuracy and integrity requirements continuously for a specified period. Service volume is the area of coverage for which the system's signal will meet availability requirements. On May 13, 1998, the Department of Transportation Inspector General reported: ``* * * The WAAS program has technical and program uncertainties. Uncertainties relating to interference of the WAAS signal from unintentional and intentional jamming, communications satellites, and ionospheric variations must be resolved. Because of these uncertainties, FAA is now reconsidering the need for a backup system to WAAS. In our opinion, some type of backup system for WAAS will be needed for the foreseeable future. In addition, the national airspace system modernization task force is discussing alternatives regarding the future phases of WAAS. In our opinion, determination of the intended ultimate use of WAAS (whether it will be a primary or a sole means of navigation) is the most critical issue impacting the WAAS program. ``The ultimate decision on whether WAAS will be used as a sole or primary means of navigation will impact FAA and the aviation industry. For example, FAA currently plans to begin decommissioning its existing navigation aids in 2005 and transition to WAAS as a sole means of navigation. If WAAS is not a sole means of navigation, FAA will incur additional expenditures, not currently planned, to acquire, upgrade, modernize, and maintain existing navigation aids. FAA's decision will also impact the aviation industry plans regarding avionics equipage. Furthermore, in our opinion, this schedule is very optimistic given all the uncertainties in the WAAS Program.'' Because of the uncertainties of the WAAS Program, the rethinking on the need for a backup system, the escalating cost estimates of the program, the number (and difficulty) of critical unresolved issues and lack of clarity in program scope and definition, the seemingly questionable and uncoordinated exercise of contract line items earlier this year for phases 2 and 3 software development and systems engineering tasks, and a range of other issues that of and by themselves would cause the Committee serious concern, combined with the FAA's prior and current history of difficulty in managing large, complex procurements, the Committee has conditioned the release of all WAAS funding. The entire WAAS facilities and equipment request has been provided for WAAS for engineering, development, test, and evaluation, and the Secretary is directed, with the Administrator of the FAA, not to commit any funding to this program until certifying to the House and Senate Committees on Appropriations that the following issues have been addressed in the affirmative: --(1) WAAS is a sole means of navigation; --(2) The signal continuity issues have been solved without additional facilities or funding; and --(3) The cost benefit ratio of this program exceeds that of other landing and navigational aids programs utilizing the current $3,049,000,000 January 9, 1998, FAA estimate or any other FAA estimate in excess of that amount for the WAAS program. Loran-C .--The Committee continues to support steps to ensure that loran will be available to meet ongoing user navigation safety and efficiency requirements. Loran provides important multimodal navigation capabilities, well-proved, cost-effective, and significant safety and efficiency benefits. The Committee continues to be convinced that support of the loran infrastructure is prudent to meet continuing requirements for the technology, particularly in light of the difficultly the FAA is experiencing with WAAS. Clearly, a GPS/loran alternative to WAAS may have significant cost and operational advantages in both the short and longer term and failure to maintain the investment in loran infrastructure at this time would be irresponsible. Research, test, and evaluation equipment and facilities Research, test, and evaluation equipment and facilities .--The Committee recommends $17,790,000, the same amount requested by the administration. AIR TRAFFIC CONTROL FACILITIES AND EQUIPMENT En route programs Weather and radar processor [WARP] .--The Committee recommendation includes $2,200,000 for the program to support URET CCLD. The increase will allow the establishment of the connection between the National Weather Service rapid weather update cycles and the WARP system, providing critical winds aloft information for URET CCLD. Air route traffic control center [ARTCC] building improvement/plant improvements .--FAA is requesting $63,931,563 to perform needed modernization and expansion at its ARTCC's to accommodate new equipment that will modernize controller displays and communications systems. The Committee has provided the full request. Critical communications support .--The Committee recommends a reduction of $550,000 to fund higher priority items in the air traffic management activity. Backup emergency communications [BUEC]. --The Committee recommends $8,500,000 for this activity. The Committee notes that large unobligated balances have tended to grow in this program and the recommended level is sufficient to maintain the current pace of backup emergency communications equipment replacement. En route communications and control facilities improvement. --The Committee recommends $2,000,000 for this activity, an increase of $1,081,700 over fiscal year 1998 appropriated levels. Volcano monitor .--The Committee has included an additional $2,000,000 for the Alaska Volcano Observatory for equipment and data transmission facilities to monitor suspect volcanoes across the Alaska peninsula and the Aleutian Islands. The Committee urges the FAA to incorporate this item in its future budget requests. Terminal programs Terminal doppler weather radar [TDWR] .--Due to uncertainty over the plans for TDWR systems at two locations due to land acquisition problems, $2,500,000 of the request is unnecessary at the current time. Terminal automation program .--The administration is requesting $135,300,000 to procure 25 STARS systems and 12 support systems and necessary actions to allow STARS installation at the TRACON's. The Committee has provided the full requested amounts. Airport movement area safety system [AMASS] .--The Committee recommends an increase in this activity of $2,800,000. Terminal air traffic control facilities .--The Committee has provided $82,300,000 of new appropriated funds for this activity and notes that $7,800,000 of fiscal year 1998 appropriated funds have been proposed for reprogramming by the Federal Aviation Administration. The recommended level includes funding to keep the construction of the new tower at Seattle-Tacoma International Airport on schedule. Further, of the funds available for this activity, the Committee directs $1,900,000 for the completion of the Lambert-St. Louis air traffic control tower; $1,000,000 for the Pangborn Memorial Airport air traffic control tower; $2,000,000 for the construction of an air traffic control tower at Paine Field; $1,000,000 for a replacement tower at Logan International Airport; $100,000 to complete the engineering work for the new air traffic control tower at Port Columbus International Airport; $1,300,000 for the Lawton air traffic control tower; and $2,000,000 for the North Las Vegas air traffic control tower. Martin State Airport .--The Committee is concerned that, despite the clear direction contained in the Senate report that accompanied the fiscal year 1998 Transportation appropriations bill, the FAA has failed to program funding to replace the air traffic control tower at Martin State Airport in Maryland. The Committee expects the FAA to initiate replacement of the tower immediately and to report back by February 1, 1999, on the status and construction schedule for the project. Airport traffic control tower [ATCT]/TRACON facilities .--The administration is requesting $22,722,280 to upgrade and improve various terminal facilities and equipment on a continuing basis to provide an acceptable level of safe service and to meet current and future operational requirements. The Committee recommends the requested level for fiscal year 1999. Terminal voice switch replacement [TVSR] .--The Committee recommends a reduction of $1,200,000 in the request due to the delay in completion of the acceptance testing of the redesigned switch. Accordingly, FAA is requesting funds for more switches that it can field during the fiscal year. Potomac TRACON .--The administration is requesting $11,900,000 for the Potomac TRACON. The Committee appropriation for fiscal year 1998 is sufficient for proposed program initiatives for the Potomac TRACON. Northern California TRACON/Atlanta TRACON .--The Committee recommends a reduction in these two projects consistent with funding the completion of both projects over 2 fiscal years. Accordingly, the fiscal year 1999 fiscal year funding requirement is reduced and the resulting fiscal year 2000 funding requirement will be increased to the fiscal year 1999 appropriated levels. Emergency transceivers--replacement .--The Committee recommends no funding for this activity for fiscal year 1999. Airport surveillance radar [ASR 9] .--The Committee is concerned about reports that the FAA did not include Washington County Regional Airport in Hagerstown, MD, among airports to initially receive service from the ASR 9 system currently being installed near Martinsburg, WV. The Committee directs the FAA to ensure that the system has the capacity and/or interface abilities to provide expanded radar coverage for aircraft operations to and from the Washington County Regional Airport. Terminal facilities integration .--The Committee recommends this activity be funded out of the terminal facilities modernization program or the specific major system acquisition program. Terminal digital radar (ASR 11) .--The Committee is aware that the slippage in the STARS Program schedule has a waterfall effect on several other major system acquisition programs. Accordingly, the resulting 6-month delay in the ASR 11 survey and design schedule at 16 sites provides a funding cushion in the fiscal year 1999 request. The Committee directs the FAA to use the additional funding flexibility in this program to initiate survey and design work for new radars to serve Anchorage International Airport in Anchorage, AK; central Oregon (Deschutes and Jefferson Counties); the mountainous region between Butte, Helena, and Bozeman, MT; and Provo and Salt Lake City International Airport in Salt Lake City, UT. ASR weather system processor [WSP] .--The Committee has reduced the request by $4,200,000 because the FAA will not be able to deploy the fifth limited production system prior to December 2000. DOD/FAA facilities transfer .--The Committee recommends a reduction in the funding for this activity. The functions of the DOD facilities will not necessarily transfer within fiscal year 1999. Currently, the transition of the functions is anticipated within 18 months of the April 1, 1999, scheduled date. FAA anticipates assuming the functions at an existing FAA facility. The funds provided are sufficient for the transfer. Flight service programs Flight service station [FSS] automation .--The Committee recommends a reduction in this activity of $1,000,000. The reduced level is sufficient to remedy the power fluctuation problems contained in the request. Automated surface observing system [ASOS] .--The administration requested $9,900,000 for ASOS. The Committee has provided $20,977,000. The Committee intends that the requested $9,900,000 will be used to continue commissioning systems procured through fiscal year 1998 and for related program management costs. The Committee continues to be concerned that the FAA has not adequately funded the program for several years. Adequate funding was not provided for connectivity lines, controller equipment, or operation and maintenance funds. That oversight has left the FAA short of assets to fund ASOS systems for nontowered airports. The FAA, the National Transportation Safety Board [NTSB], and user aviation associations have identified over 200 sites which should be equipped with ASOS; $9,577,000 of the additional funding shall be used to procure additional ASOS systems toward the identified requirement. The Committee is aware of an advanced technology program, the precision airport location system [PALS], that promises to provide accurate, timely, and representative automated airport surface weather observations of visibility and sky condition to pilots, air traffic control, and other aviation weather users. The Committee recommendation includes $1,500,000 for the acceleration of the independent operational test and evaluation and first article testing of this technology and urges the FAA to evaluate this technology as a complement to the ASOS infrastructure. FSAS operational and supportability implementation system [OASIS] .--The Committee has reduced the request by $9,500,000 because system deployment will fall 18 systems less than planned in fiscal year 1999. This program should be reviewed and the FAA should address the human factor concerns raised by the air traffic controllers prior to deployment. Landing and navigational aids programs Atlanta Hartsfield International Airport .--The Committee urges the FAA to proceed quickly to provide and install the necessary equipment to upgrade and equip the new commuter runway and the new airport air traffic control tower. The appropriated levels in this account provide sufficient resources for necessary equipment and installation at Atlanta Hartsfield International Airport. Wide area augmentation system [WAAS] .--The Committee recommends a reduction in this account consistent with the treatment of this program elsewhere in this account. Instrument landing system [ILS] .--The Committee, consistent with the continued concern about the viability and cost effectiveness of the WAAS system, recommends an increase in the ILS procurement and installation program of $10,000,000. Priority consideration should be given to Burlington-Alamance Regional Airport and Stanly County Airport in North Carolina, North Las Vegas Airport and McCarran Airport in Nevada, Fresno Yosemite International Airport in California, Stennis International Airport in Mississippi, complete the installation of an ILS at Bessemer Airport in Alabama, install a glideslope indicator at Clovis Airport in New Mexico, Olive Branch Airport in Mississippi, and Hays Municipal Airport in Kansas. Tactical landing system .--The Committee recommended $3,000,000 for the establishment of tactical landing system test programs at Boeing Field in Seattle, WA, Pullman/Moscow, ID, Friedman Memorial Airport, ID, and at Logan/Cache County and Heber Airports in Utah. Approach Lighting System Improvement Program [ALSIP] .--The Committee recommends an increase of $1,500,000 for the initiation of a MALSR system at Juneau International Airport. This project will complement the substantial strides and efforts that have been made to reduce the flight restrictions due to weather and visibility at this airport. Visual navigation aids. --The Committee is aware of a plan to install two localizer directional aids and a precision runway monitor for Newark International Airport that will enable the FAA to conduct simultaneous parallel approaches in visual meteoric conditions and marginal visual meteoric conditions. This equipment will help to reduce the numerous severe delays and enhance safety at the airport. The Committee directs the Administrator to begin preliminary work for the installation of this equipment. To this end, the Committee has provided $2,000,000 for modeling simulation, risk assessment, site survey and other environmental work associated with this installation. Navigational and landing aids .--The recommended level has been increased by $2,000,000 to reflect changing programmatic priorities of the Federal Aviation Administration. The additional increase in the funding level over the request is for development work on a low cost next generation precision gyroscope utilizing silicon manufacturing technologies. In this development effort, the Committee directs the FAA to work with the University of Alabama to build on the substantial work that has already been done in this area to facilitate the expedited development of a lower cost gyroscope for application in navigation systems. Other ATC facilities programs Alaskan NAS interfacility communications system [ANICS] .--The Committee recommendation is sufficient to substantially complete this activity. FAA buildings and equipment--improve/modernize .--The Committee recommends a reduction in this activity to increase the appropriation for higher-priority activities. Electrical power systems--sustain/support .--The Committee recommends $15,000,000 for this activity, and the Committee notes that there is currently unobligated balances for this activity of which a portion was proposed for reprogramming in fiscal year 1998. Aircraft and related equipment program .--The Committee recommends $2,000,000 for this activity, the same level appropriated in fiscal year 1998. Nonair traffic control facilities and equipment Operational data management system [ODMS] .--The Committee recommends $1,000,000 for this activity, the same level appropriated in fiscal year 1998. Explosive detection system .--The Committee recommends no funding for this activity in the ``Facilities and equipment'' account. Sufficient levels have been provided in the ``Airport Improvement Program'' account to accommodate the airports' demand for explosive detection equipment. The Committee continues to be concerned by the slow pace of installation of the equipment that has already been procured and the low utilization rates of the equipment that has been installed. The Committee encourages the FAA to work with interested airports to promote the integration of equipment provided by prior appropriations for explosive detection equipment into current airport and carrier operations and to facilitate airports' use of Airport Improvement Program funding for acquisition of explosive detection systems. Training, equipment, and facilities Distance learning .--The Committee recommends no appropriation for this activity. Mission support System engineering and development support .--The Committee recommends $28,960,000 for this activity, the level appropriated in fiscal year 1998. Program support leases .--The Committee recommends $27,500,000 for this activity, the level appropriated in fiscal year 1998. NAS modernization integration .--The Committee includes $8,000,000 for training, procedures, testing, airspace analysis, and other activities to facilitate the modernization of the NAS consistent with the recommendations of the NAS modernization task force recommendations. Frequency and spectrum engineering--provide .--The Committee recommends $1,500,000 for this activity, the level appropriated in fiscal year 1998. Permanent change of station [PCS] .--The Committee recommends $2,500,000 for this activity. The Committee is confident that the agency can manage the demands of this activity within that appropriation. FAA system architecture .--The Committee recommends $2,000,000 for this activity. There are unobligated balances that the agency can draw upon for this activity, and the Committee notes that this activity has been offered as a source for reprogramming activities. Technical services support contract .--The Committee recommends $47,550,000 for this activity consistent with the agency's desire to support higher priority activities. Year 2000 date change program .--The Committee recommends no appropriation for this activity pursuant to previous reprogramming action and supplemental action to accelerate the agency's activities to correct year 2000 deficiencies. The Committee expects that the FAA Administrator will promptly notify the Committee of additional identified requirements to resolve the year 2000 problems. MAJOR EQUIPMENT ACTIVITY TERMINAL DOPPLER WEATHER RADAR City Acceptance Commissioning dates Memphis July 1993 December 1994. Houston Intercontinental March 1993 July 1994. Atlanta April 1993 December 1995. Washington National February 1994 January 1996. Denver December 1993 August 1995. Chicago O'Hare March 1994 July 1996. St. Louis May 1994 February 1995. Orlando June 1994 April 1996. New Orleans July 1994 March 1996. Tampa December 1994 April 1996. Miami November 1995 June 1996. Pittsburgh December 1994 July 1997. Andrews AFB December 1994 August 1996 Newark December 1994 October 1997. Boston April 1995 January 1996. Kansas City December 1994 July 1995. Detroit March 1996 September 1996. Houston Hobby August 1995 July 1996. Dallas/Love May 1995 January 1996. Dallas/Fort Worth June 1995 June 1996. Dayton May 1995 April 1998. Wichita June 1995 September 1995. Indianapolis July 1995 October 1996. Cincinnati July 1996 June 1997. Philadelphia July 1996 October 1997. Phoenix March 1997 March 1997. Milwaukee March 1997 November 1997. Chicago Midway To be determined To be determined. Cleveland July 1996 October 1996. Columbus December 1996 May 1997. San Juan To be determined To be determined. West Palm Beach February 1996 May 1997. Nashville April 1997 February 1998. Louisville June 1997 April 1998. Washington Dulles November 1996 March 1998. Charlotte September 1995 December 1995. Salt Lake City March 1997 April 1998. Fort Lauderdale To be determined To be determined. Baltimore November 1996 May 1997. Raleigh/Durham April 1997 January 1998. Minneapolis March 1997 May 1997. Oklahoma City March 1997 April 1997. Tulsa May 1997 April 1998. New York City (JFK and LGA) To be determined To be determined. Las Vegas To be determined To be determined. AIRPORT SURFACE DETECTION EQUIPMENT [ASDE 3] Site location Delivery date Commissioning date FAA Academy\1\ FAA Technical Center\2\ Pittsburgh, PA December 1989 June 1996. San Francisco November 1991 October 1995. Dallas/Fort Worth\3\ February 1992 March 1995. Philadelphia February 1992 March 1996. Los Angeles\3\ August 1992 April 1995. Detroit August 1992 December 1994. Cleveland August 1992 December 1994. Boston August 1992 March 1995. Portland August 1992 December 1994. Atlanta September 1992 January 1995. Seattle September 1992 December 1993. Los Angeles\3\ February 1993 February 1995. Denver (DIA)\3\ March 1993 May 1995. St. Louis December 1993 February 1995. Denver (DIA)\3\ December 1993 October 1995. New York-Kennedy January 1994 February 1995. Minneapolis July 1994 March 1995. Anchorage August 1994 October 1995. New Orleans October 1994 September 1995. Baltimore November 1994 June 1995. Kansas City December 1994 May 1995. Miami February 1995 November 1996. Houston\3\ February 1995 August 1995. Memphis June 1995 December 1997. Chicago June 1995 April 1996. Houston\3\ August 1996 July 1997. Charlotte June 1999 November 1999. Louisville\4\ March 1999 November 1999. Reagan Washington National February 1996 April 1997. Cincinnati October 1995 September 1996. Dulles May 1997 February 1998. San Diego November 1995 November 1996. Dallas-Fort Worth\3\\4\ November 1996 November 1997. Andrews AFB January 1999 November 1999. Salt Lake City\4\ February 1998 February 1999. Las Vegas\4\ June 1998 June 1999. New York-LaGuardia October 1998 October 1999. Newark April 1997 April 1998. \1\FAA training/field support/depot support facility. \2\To be relocated to Aeronautical Center, Oklahoma City. \3\Dual sensor facilities. \4\Assets redirected from Tampa, Raleigh-Durham, Orlando, Orange County. TERMINAL AIR TRAFFIC CONTROL FACILITIES Funding for terminal air traffic control facilities started in previous years: Merrill, AK Fort Smith, AR St. Louis (TRACON), MO St. Paul, MN Syracuse, NY Portland, OR Houston (HOU), TX Salt Lake City (ATCT), UT Salt Lake City (TRACON), UT Chicago (O'Hare), IL Chicago (Midway), IL Palwaukee, IL Pontiac, MI Albany, NY Windsor Locks, CT Klamath Falls, OR Birmingham, AL Little Rock, AR North Las Vegas, NV Topeka, KS Dallas (Addison), TX Bedford, MA Phase III for terminal air traffic control facilities started in fiscal year 1997 and before: Newark, NJ Seattle, WA LaGuardia, NY Grand Canyon, AZ Phase II funding for terminal air traffic control facilities started in fiscal year 1998 and before: Boston, MA Oakland, CA Roanoke, VA Newport News, VA Port Columbus, OH Islip, NY Seattle, WA Everett, WA Fort Lauderdale, FL Manchester, NH Phase I funding for terminal air traffic control facilities to be started in fiscal year 1999: Reno, NV Asheville, NC Tulsa (Riverside), OK Personnel and related expenses Personnel and related expenses .--The Committee recommends $220,000,000 for this expense, the same level appropriated in fiscal year 1998. The reduction from the request can be accommodated by reduction in travel expenses. ADVANCE APPROPRIATIONS The Committee has not included the advance appropriations for fiscal years 2000 through 2006 requested by the administration. There has been substantial uncertainty and change with respect to projects financed through the ``Facilities and equipment'' account, and the Committee believes that continuing, annual congressional review of the status and funding needs of these projects is critical. RESEARCH, ENGINEERING, AND DEVELOPMENT (Airport and Airway Trust Fund) Appropriations, 1998 $199,183,000 Budget estimate, 1999 290,000,000 Committee recommendation 173,627,000 This appropriation finances research, engineering, and development programs to improve the national air traffic control system by increasing its safety, security, productivity, and capacity. The programs are designed to meet the expected air traffic demands of the future and to promote flight safety. The major objectives are to keep the current system operating safely and efficiently; to protect the environment; and to modernize the system through improvements in facilities, equipment, techniques, and procedures in order to insure that the system will safely and efficiently handle the volume of aircraft traffic expected to materialize in the future. The bill includes $173,627,000 for research, engineering, and development. The Committee suggests the following allocation: Fiscal year 1999 budget estimate Committee recommendation System development and infrastructure: $2,148,000 $1,164,000 ---------------------------------- -------------------------- Subtotal 16,768,000 15,784,000 ================================== ========================== Capacity and air traffic management technology: 4,044,000 7,000,000 ---------------------------------- -------------------------- Subtotal 107,011,000 11,902,000 ================================== ========================== Weather 12,284,000 19,284,000 Aircraft safety technology: 4,750,000 4,750,000 ---------------------------------- -------------------------- Subtotal 34,886,000 46,114,000 ================================== ========================== System security technology: 39,545,000 42,200,000 ---------------------------------- -------------------------- Subtotal 54,872,000 53,423,000 ================================== ========================== Human factors and aviation medicine: 9,903,000 9,903,000 ---------------------------------- -------------------------- Subtotal 22,229,000 22,229,000 ================================== ========================== Environment and energy 3,391,000 2,891,000 Innovative/cooperative research 2,330,000 2,000,000 ================================== ========================== Total 290,000,000 173,627,000 The objectives of and Committee recommendations for the 10 major activities in FAA's Research, Engineering, and Development Program are discussed below. SYSTEM DEVELOPMENT AND INFRASTRUCTURE Objectives: To provide (1) a systems engineering approach and benefit/cost analyses to the development of a comprehensive research, engineering, and development program and (2) visibility, accountability, coordination, and control of the research, engineering, and development activities. System planning and resource management .--The Committee recommends $1,164,000, the same level appropriated in fiscal year 1998. FAA technical laboratory facility .--The administration's request was $9,730,000 for work at the FAA Technical Center. The Committee fully funds the administration's request. Center for Advanced Aviation Systems Development [CAASD] .--The Committee fully funds CAASD, which is for the Mitre support contract. CAPACITY AND AIR TRAFFIC MANAGEMENT TECHNOLOGY Objectives: To ensure that air traffic management operations safety is maintained and then improved, to increase system capacity and utilization of existing airspace and airport resources, and to accommodate greater user flexibility and efficiency. System capacity, planning, and improvement .--The Committee recommends a reduction from the original request to $3,000,000 and includes an additional $4,000,000 for flight 2000 planning and scoping activities. A primary stated goal of the research is to develop an overall strategy to enhance capacity. The Committee encourages the FAA to focus on that goal and to narrow the budget justification's scope of initiatives advertised under this activity. The recommended funding is adequate for these tasks. Cockpit technology .--The Committee recommends $1,000,000 for this initiative. This funding is adequate for the principal focus to design and implement change 7 to TCAS II. Flight 2000 .--The Committee has included $4,000,000 in system capacity, planning, and improvement, to allow the FAA to complete the initial program planning activities into flight 2000 concepts. The Committee notes that the request for fiscal year 1999 differs from the fiscal year 1998 request primarily in the ambitiousness of the program and in the discussion of WAAS. While the Committee continues to believe that GPS based navigational and landing systems have substantial promise for the aviation community, the Committee is concerned about the FAA's desire to initiate research into this area with a request that would increase the RE&D program by 45 percent. Given the budgetary constraints faced by the Committee, the uncertainties of whether WAAS can ever be cost effective, the prior difficulty that FAA has had with overly ambitious initiatives into modernization or new technologies (MLS, AAS, and WAAS), the Committee directs the FAA to focus on accomplishing the tasks that must be completed prior to the start of a more robust flight 2000 effort--namely, definition and validation of a flight 2000 operational concept and evaluation, development of a flight 2000 integrated program plan, and further development of a plan to implement flight 2000 capabilities in Alaska, Hawaii, and Oakland Air Route Traffic Control Center [ARTCC] oceanic and domestic airspace. The recommended level in system capacity, planning, and improvement is sufficient for those initiatives. Operations concept validation .--The Committee does not recommend any funding for this effort at this time. The operations concept validation is contingent upon the transition to a free flight environment. Although the Committee endorsed, in concept, such a transition, it is premature to establish a transition plan to an environment that has yet to be adequately defined by the FAA or endorsed by the Congress. The Committee would welcome the reconsideration of this initiative once greater clarity and definition is available on the free flight concept. Software engineering R&D .--The Committee recommends $1,000,000 for this initiative to assess the prior work of the Office of Information Technology and to identify processes and guidelines to help the FAA address the shortcomings noted in software dependent procurements. The Committee encourages the FAA to conduct an indepth analysis of the processes within the FAA which are affected by COTS/NDI technologies, identify new methods to test and validate safety-critical systems that are not dependent on source code analysis, investigate ways to reduce cost and time to establish high confidence in a system. Establishment of a center is an activity better considered in the context of the fiscal year 2000 appropriations bill. WEATHER Objectives: To improve the timeliness and accuracy of weather forecasting in order to enhance flight safety, increase system capacity, improve flight efficiency, reduce air traffic control [ATC] and pilot workload, improve flight planning, and increase productivity. The Committee recommends $19,284,000 for the weather program, a $7,000,000 increase over the administration's request. This increase reflects the Committee's concern about the impact of weather on aviation safety and the need to continue an aggressive program of research and development. Project Socrates. --The Committee has added $3,000,000 to this program to continue FAA's sensor for optically characterized ring-eddy atmospheric turbulence emanating sound (Project SOCRATES). Project SOCRATES is the only ongoing project in the FAA to develop a new sensor technology aimed at improving air passenger safety by early detection of atmospheric hazards, including wind shear, wake vortex, and clear air turbulence. Juneau, AK .--The Committee has included $4,000,000 for the Juneau turbulence and windshear project. The funding is sufficient to continue the research and to permit the FAA to purchase the wind profilers and anemometers at the airport. The preliminary results of the research indicate that this may be a technology and approach that is transferable to other similarly situated airports with critical approach patterns and severe wind conditions. The Committee urges the FAA to integrate this project into current operational procedures as soon as the research data warrants and the operational benefits can be realized. AIRCRAFT SAFETY TECHNOLOGY Objectives: To develop technologies, standards, and maintenance regulations that maintain or improve aircraft safety in an evolving, changing, and demanding aviation environment. Aging aircraft .--The Committee has provided $21,540,000 for FAA's research in the aging aircraft area, $6,846,000 more than the administration's request. This research supports airborne data monitoring systems, corrosion fatigue research, the Center for Aviation Systems Reliability [CASR], and the Aging Aircraft Nondestructive Inspection Validation Center [AANC], which conducts research in these areas. The Committee is concerned that the administration's request for this line item would hold aging aircraft research at a no-growth posture, which would severely strain the aging aircraft program. The administration request does not follow through on the recent Gore Commission report recommending that the aging aircraft program be increased to cover nonstructural systems. The Committee recommendation includes $3,000,000 for direct support of the AANC's work. Further, the Committee directs the FAA to explore the options of building a new hanger for AANC or modifying the existing hanger at Albuquerque airport. The FAA should report back to the Committee on the results of this exploration by January 15, 1999. Of the request level, the Committee expects $1,000,000 to be available for aging aircraft-related activities at CASR. The additional funding above the request includes $6,000,000 to support the Airworthiness Assurance Center of Excellence, which the FAA is forming to integrate inspection, crashworthiness, and advanced materials research efforts of university programs with the validation efforts of the AANC. This center will work with industry in a comprehensive effort to improve the safety of aging aircraft. Of the total funds provided, the Committee directs that $4,440,000 be used to further the engine titanium inspection component of this line item. SYSTEM SECURITY TECHNOLOGY Objectives: To enhance the security of passengers and crews in all aspects of aircraft, airports, and related ATC facilities by developing systems that prevent or deter terrorist activities. Explosives and weapons detection .--The Committee has provided $42,200,000 for the explosives and weapons detection line item. This activity is used to conduct research in trace and bulk detection of explosives and cargo screening. This is consistent with the administration's request adjusted for the resources reprogrammed prior to the beginning of this fiscal year. Of the funds provided, the Committee directs $4,000,000 to the pulsed fast neutron analysis cargo inspection system [CIS] for an operational field demonstration by the Federal Aviation Administration at an airport; $6,000,000 for the continuation of the research into the pulsed fast neutron transmission spectroscopy [PFNTS]; $1,000,000 to accelerate research and development of explosives and chemical or biological agents currently being conducted by the Insititute of Biological Detection Systems; and $1,000,000 for exploration of x-ray scanning technology which incorporates combined automatic organic detection and software based threat image projection testing capabilities. The Committee believes that FAA's R,E&D efforts to identify and develop alternative technologies continue to be very important. The funds provided are sufficient to continue research and development efforts in this area and to explore the most promising new technologies. Airport security technology integration .--The Committee recommends $3,941,000 for this activity, an increase of $1,456,000 over the fiscal year 1998 appropriation. Aircraft hardening .--The Committee recommends $2,000,000 for this activity, the level appropriated in fiscal year 1998. HUMAN FACTORS AND AVIATION MEDICINE Objectives: To establish ways to improve the effectiveness of human performance in the operation of the aviation system and to seek better methods for preventing human error, accidents, and incidents. The Committee recommends full funding of the request. Aeromedical research. --The Committee directs the FAA to report on the utility of a multiperson hyperbaric chamber and attendant supporting research and evaluation equipment to the goals of the aeromedical research program. ENVIRONMENT AND ENERGY Objectives: To protect the environment, conserve energy, and keep the U.S. air transportation industry strong and competitive. The Committee recommends $2,891,000, the level appropriated in fiscal year 1998. INNOVATIVE/COOPERATIVE RESEARCH Objectives: To maximize the total effectiveness of research, engineering, and development by incorporating the efforts of other Government agencies, the industry, and universities. The Committee recommends $2,000,000, the level appropriated in fiscal year 1998. GRANTS-IN-AID FOR AIRPORTS (Liquidation of Contract Authorization) (Airport and Airway Trust Fund) Appropriations, 1998 $1,600,000,000 Budget estimate, 1999 1,600,000,000 Committee recommendation 1,600,000,000 The Airport and Airway Improvement Act of 1982, as amended, authorizes a program of grants to fund airport planning and development and noise compatibility planning and projects for public use airports in all States and territories. The Committee recommends $1,600,000,000 in liquidating cash for grants-in-aid for airports. This is consistent with the Committee's obligation limitation on airport grants for fiscal year 1999 and for the payment of previous years' obligations. (Limitation on Obligations) Limitation, 1998 $1,700,000,000 Budget estimate, 1999 1,700,000,000 Committee recommendation 2,100,000,000 The bill also includes a limitation on obligations for airport development and planning grants which are financed under contract authority. The limitation recommended for fiscal year 1999 is $2,100,000,000 and is intended to be sufficient to continue the important tasks of enhancing airport safety, ensuring that airport standards can be met, maintaining existing airport capacity, and developing additional capacity. The level that the Committee has proposed will mean more money for airports in all the States as compared to the administration's budget request. The table below shows estimates of the entitlement and State allocation grant funds that each State would receive under the Committee recommendation. This does not include discretionary funds, which would also be greater under the Committee recommendation. Airport Improvement Program formula distributions [Estimated fiscal year 1998 entitlement and State allocations] Total formula funds State at $2,100,000,000 Alabama $5,823,950 Alaska 31,277,460 Arizona 8,759,576 Arkansas 4,577,601 California 31,086,667 Colorado 7,958,160 Connecticut 2,809,935 Delaware 635,295 District of Columbia 468,506 Florida 13,064,255 Georgia 8,040,687 Hawaii 1,186,786 Idaho 5,134,047 Illinois 11,777,613 Indiana 6,148,104 Iowa 5,065,177 Kansas 6,193,550 Kentucky 4,932,788 Louisiana 5,778,788 Maine 2,734,919 Maryland 4,298,977 Massachusetts 5,091,338 Michigan 12,190,141 Minnesota 7,873,545 Mississippi 4,490,016 Missouri 7,558,689 Montana 8,289,328 Nebraska 5,247,768 Nevada 6,692,991 New Hampshire 1,334,174 New Jersey 6,348,164 New Mexico 7,508,916 New York 16,573,616 North Carolina 7,827,567 North Dakota 4,180,667 Ohio 10,647,533 Oklahoma 6,061,992 Oregon 7,247,957 Pennsylvania 11,505,588 Puerto Rico 2,632,148 Rhode Island 832,693 South Carolina 4,302,524 South Dakota 4,559,359 Tennessee 5,936,395 Texas 26,942,447 Utah 5,752,302 Vermont 933,033 Virginia 6,947,024 Washington 7,410,694 West Virginia 2,638,950 Wisconsin 7,204,305 Wyoming 5,421,196 Insular areas 2,564,100 388,500,000 Note .--States allocation includes: General aviation, reliever, and nonprimary commercial service airports and is based on 1997 distribution. Entitlement funds are those distributed to commercial service airports based on enplanements. Estimates are based on 1996 enplanements. The Committee notes that a sizable alternative source of funding is now available to airports in the form of passenger facility charges [PFC's]. The first PFC charge began for airlines tickets issued on June 1, 1992. DOT data shows that as of March 1, 1998, 289 airports have been approved for collection of PFC's in the amount of $18,100,000,000. During calendar year 1997 it is estimated that airports collected $1,222,745,000 in PFC charges and $1,258,000,000 is estimated to be collected in calendar year 1998. Of the airports collecting PFC's, approximately one-fifth collected about 85 percent of the total, and all of these are either large or medium hub airports. DOT estimates that these airports will collect more than $1,157,000,000 in calendar year 1999, depending on the number of applications received and approved. While large hubs collected most of the PFC funds during the last 2 years, small airports also partially benefited from these collections because of the redistribution mechanism in the PFC legislation. According to the provision, an airport collecting PFC's must have its apportionment under the AIP grant program reduced by 50 percent of the forecast PFC revenue, but the reduction cannot be more than one-half of the airport's earned apportionment for that fiscal year. FAA then redistributes these returned trust funds primarily to small airports. For example, in fiscal 1998 $111,300,000 that would have been distributed as grants based on passenger enplanements to PFC-charging airports is being redistributed to small airports. In redistributing these funds, FAA provides three-quarters of the total to the small airport fund, another 12.5 percent is available to small hubs, and the remaining 12.5 percent goes to FAA's discretionary account that can be provided to small, medium, or large airports. AIP FUNDING FOR FISCAL YEAR 1999 Budget estimate\1\ Committee recommendation\1\ Appropriation limitation $1,700,000,000 $2,100,000,000 Entitlements: 527,949,003 527,949,003 -------------------- ----------------------------- Subtotal entitlements 995,621,560 1,079,621,560 ==================== ============================= Returned entitlements: Small airport fund 113,767,800 113,767,800 Discretionary set-asides: 211,054,936 225,000,000 Other discretionary: 210,779,025 405,162,776 -------------------- ----------------------------- Subtotal other discretionary 300,000,000 559,178,335 ==================== ============================= Total entitlement 1,109,389,360 1,193,389,360 Total discretionary 590,610,640 906,610,640 -------------------- ----------------------------- Grand total 1,700,000,000 2,100,000,000 \1\Assumes current law pending AIP program reauthorization with continuation of MAP and noise levels at fiscal year 1998 levels. DISCRETIONARY GRANTS As the table above illustrates, at a level of $2,100,000,000 for the total AIP program, as recommended by the Committee, there are $906,610,000 in discretionary funds. At this level, the authorization legislation causes a transfer from the other discretionary programs--specifically, the discretionary account for capacity, safety, security, and noise and the remaining discretionary funds, which are critical in meeting commitments under letters of intent and advancing projects that have systemwide benefits--to the set-asides for noise, the military airport program, and a set-aside for general aviation, reliever, and nonprimary commercial airports. The latter category provides additional funds for airports that are most dependent on Federal assistance to make safety and capacity improvements. At the recommended levels for the total AIP program under the prior AIP authorization, a transfer normally would have occurred from the other discretionary programs--specifically, the discretionary account for capacity, safety, security, and noise and the remaining discretionary funds, which are critical in meeting commitments under letters of intent and advancing projects that have systemwide benefits--to the set-asides for noise, the military airport program, and a set-aside for general aviation, reliever, and nonprimary commercial airports. The latter category provides additional funds for airports that are most dependent on Federal assistance to make safety and capacity improvements. But, without caps, the set-asides for noise and the military airport program would increase to more than $377,000,000 and $132,000,000, respectively. In the Committee's judgment, a cap on the transfer to these two set-asides would result in a better allocation of resources to meet the airport capital investment needs that most impact air travelers today. Therefore, the Committee has recommended bill language that caps the noise set-aside at $225,000,000, and the military airport set-aside at $26,000,000. The Committee has carefully considered a broad array of discretionary grant requests that can be expected in fiscal year 1999. The Committee expects the Administrator to give great deference to the Committee's recommendations for discretionary grants in fiscal year 1999. Specifically, the Committee expects the FAA to give priority consideration to grant applications for the projects listed below in the categories of discretionary grants for which they are eligible. If funds in the remaining discretionary category are used for any projects in fiscal year 1999 that are not listed below, the Committee expects that they will be for projects for which FAA has issued letters of intent (including letters of intent the Committee recommends below that the FAA subsequently issues), or for projects that will produce significant aviation safety improvements or significant improvements in systemwide capacity or otherwise have a very high benefit/cost ratio. Within the obligation level recommended, the Committee directs that priority be given to grant applications involving the further development of the following airports: |
||