       Amendment No. 29: Provides $88,875,000 for shore facilities 
     and aids to navigation facilities instead of $82,275,000 as 
     proposed by the House and $80,200,000 as proposed by the 
     Senate. In addition, the conference agreement includes the 
     reprogramming of $24,000,000 from various shore facilities as 
     listed in the Senate report (-$22,100,000) and from the 
     overseas Loran-C closure program (-$1,900,000), to be 
     reallocated to the following programs:
Air station consolidation...................................$11,000,000
Public family quarters.......................................11,100,000
Station Portage, MI...........................................1,900,000
       Amendment No. 30: Provides $44,700,000 for acquisition-
     related personnel compensation, benefits and related costs 
     instead of $43,000,000 as proposed by the House and 
     $46,500,000 as proposed by the Senate.
       Amendment No. 31: Deletes House language that would have 
     allowed the Secretary to transfer up to $50,000,000 within 
     the AC&I appropriation for implementation costs associated 
     with Coast Guard streamlining plans. The Senate bill provided 
     funding for specific streamlining projects rather than 
     transfer authority for unspecified projects. The conference 
     agreement adopts the Senate approach, providing $42,750,000 
     for ten streamlining projects. This compares to $31,050,000 
     in the Senate bill. The budget request included $5,000,000 
     for unspecified projects. The conferees are very supportive 
     of the Coast Guard's streamlining efforts and look forward to 
     reviewing specific proposals next year in detail.
       Amendment No. 32: Provides that the Commandant may dispose 
     of surplus real property by sale or lease and the proceeds 
     shall be credited to this appropriation. The Senate bill 
     required disposal by sale or lease. The House bill contained 
     no similar provision.
                        port safety development
       Amendment No. 33: Appropriates $15,000,000 for debt 
     retirement of the Port of Portland, Oregon, to remain 
     available until expended, as proposed by the Senate. The 
     House bill contained no similar appropriation.
                         alteration of bridges
       Amendment No. 34: Appropriates $16,000,000 for the 
     alteration or removal of obstructive bridges as proposed by 
     the House instead of $2,000,000 as proposed by the Senate.
       A table comparing the fiscal year 1996 estimate, House 
     bill, Senate bill, and conference agreement by bridge and 
     location follows:
----------------------------------------------------------------------------------------------------------------
                                                    Fiscal year                                     Conference  
                                                   1996 estimate    House bill      Senate bill      agreement  
----------------------------------------------------------------------------------------------------------------
Bridge and location:                                                                                            
    Burlington, IA, Burlington Northern RR                                                                      
     Bridge.....................................      $2,000,000      $2,000,000      $2,000,000      $2,000,000
    New Orleans, LA, Florida Avenue RR/HW Bridge  ..............       2,000,000  ..............       2,000,000
    Brunswick, GA, Sidney Lanier HW Bridge......  ..............       8,000,000  ..............       8,000,000
    Chelsea St. Bridge, Boston, MA..............  ..............       2,000,000  ..............       2,000,000
    Limehouse HW Bridge, St. John's Island, SC..  ..............       2,000,000  ..............       2,000,000
                                                 ---------------------------------------------------------------
        Total...................................       2,000,000      16,000,000       2,000,000      16,000,000
----------------------------------------------------------------------------------------------------------------
[[Page H 10496]]
                            reserve training
       Amendment No. 35: Appropriates $62,000,000 for reserve 
     training as proposed by the Senate instead of $61,859,000 as 
     proposed by the House.
              Research, development, test, and evaluation
       Amendment No. 36: Appropriates $18,000,000 for research, 
     development, test, and evaluation instead of $18,500,000 as 
     proposed by the House and $20,000,000 as proposed by the 
     Senate.
       The following table summarizes the fiscal year 1996 budget 
     estimate, House and Senate recommendations, and the 
     conference agreement by program, project and activity:
----------------------------------------------------------------------------------------------------------------
                                       Fiscal year 1996                                            Conference   
            Program area                   estimate          House bill        Senate bill         agreement    
----------------------------------------------------------------------------------------------------------------
Improve search and rescue                                                                                       
 capability:                                                                                                    
    Search planning.................           $100,000           $100,000  .................            100,000
    Search process, platforms and                                                                               
     sensors........................            400,000            400,000  .................            400,000
    Personnel.......................            432,000            432,000  .................            432,000
                                     ---------------------------------------------------------------------------
      Total.........................            932,000            932,000            500,000            932,000
                                     ===========================================================================
Waterways safety and management:                                                                                
    Waterways management............            500,000            500,000  .................            400,000
    Advanced vessel traffic systems/                                                                            
     services.......................            600,000            100,000  .................            275,000
    Integrated navigation systems...            450,000            450,000  .................            450,000
    Short range aids to navigation..            400,000            200,000  .................            200,000
    Advanced GPS development........                  0                  0  .................                  0
    Personnel.......................            864,000            864,000  .................            864,000
                                     ---------------------------------------------------------------------------
      Total.........................          2,814,000          2,114,000          1,325,000          2,189,000
                                     ===========================================================================
Marine safety:                                                                                                  
    Marine safety research..........            530,000            200,000  .................            200,000
    Human factors analysis..........          1,685,000            700,000  .................          1,050,000
    Fire safety for commercial                                                                                  
     vessels........................            960,000            750,000  .................            750,000
    Personnel.......................            972,000            700,000  .................            700,000
                                     ---------------------------------------------------------------------------
      Total.........................          4,147,000          2,350,000          2,000,000          2,700,000
                                     ===========================================================================
Ship structure committee:                                                                                       
    Support for Committee...........            250,000                  0                  0                  0
    Personnel.......................             36,000                  0                  0                  0
                                     ===========================================================================
      Total.........................            286,000                  0                  0                  0
                                     ===========================================================================
Marine environmental protection:                                                                                
    Planning, management and                                                                                    
     training.......................            150,000            150,000  .................            150,000
    Detection/surveillance systems..                  0                  0  .................                  0
    Oil pollution response..........            850,000            500,000  .................            625,000
    Personnel health and safety.....             75,000             75,000  .................             75,000
    Port demonstration project......                  0                  0  .................                  0
      OPA90 regional grant program..                  0                  0  .................                  0
    HazChem countermeasures and                                                                                 
     safety.........................                  0                  0  .................                  0
    Personnel.......................            504,000            504,000  .................            504,000
                                     ---------------------------------------------------------------------------
      Total.........................          1,579,000          1,229,000           1,075,00          1,354,000
                                     ===========================================================================
Maritime law enforcement:                                                                                       
    Surveillance....................            725,000            725,000  .................            725,000
    Vessel search...................                  0                  0  .................                  0
    Sensor integration information..                  0                  0  .................                  0
    Personnel.......................            504,000            504,000  .................            504,000
                                     ---------------------------------------------------------------------------
      Total.........................          1,229,000          1,229,000            725,000          1,229,000
                                     ===========================================================================
Safety and environmental compliance:                                                                            
    Cutter fire safety technology...            600,000            586,000                  0            586,000
    Pollution prevention............            500,000            500,000                  0            500,000
    Aviation engineering support....             75,000                  0                  0                  0
    Vessel loss exposure and risk                                                                               
     analysis methology.............            620,000            620,000                  0            620,000
    Personnel.......................            612,000            612,000  .................            612,000
                                     ---------------------------------------------------------------------------
      Total.........................          2,407,000          2,318,000                  0          2,318,000
                                     ===========================================================================
Human resource management                                                                                       
 effectiveness:                                                                                                 
    Training techniques and                                                                                     
     technologies...................            300,000                  0                  0            100,000
    Staffing standards development..                  0                  0                  0                  0
    Personnel.......................            144,000                  0                  0                  0
                                     ---------------------------------------------------------------------------
      Total.........................            444,000                  0                  0            100,000
                                     ===========================================================================
Command, control, computers and                                                                                 
 intelligence:                                                                                                  
    Information systems.............            280,000          1,780,000                  0            280,000
    Advanced communications systems.                  0                  0                  0                  0
    Personnel.......................            648,000            648,000                  0            648,000
                                     ---------------------------------------------------------------------------
      Total.........................            928,000          2,428,000                  0            928,000
                                     ===========================================================================
Technology base:                                                                                                
    Future technology assessment....            300,000                  0                  0                  0
    Modeling........................            150,000                  0                  0                  0
    Select projects.................            450,000            300,000                  0            300,000
    Personnel.......................            684,000            200,000                  0            200,000
                                     ---------------------------------------------------------------------------
      Total.........................          1,584,000            500,000                  0            500,000
                                     ===========================================================================
R&D personnel, program support and                                                                              
 operations                                                                                                     
    Admin/support personnel and                                                                                 
     related costs..................          3,100,000          2,600,000                  0          2,850,000
    Support and operations..........          1,700,000          1,500,000                  0          1,600,000
    R&D management info system                                                                                  
     development....................            500,000            450,000                  0            450,000
    Modernization of F&STD test                                                                                 
     facilities.....................            850,000            850,000                  0            850,000
                                     ---------------------------------------------------------------------------
      Total.........................          6,150,000          5,400,000                  0          5,750,000
                                     ===========================================================================
Mission capabilities assessment.....                  0                  0          1,780,000                  0
    Multimission/administrative                                                                                 
     support........................                  0                  0         12,595,000                  0
Other projects:                                                                                                 
    South Florida oil spill research                                                                            
     center.........................                  0                  0                  0                  0
    Maritime Fire and Research                                                                                  
     Assoc..........................                  0                  0                  0                  0
                                     ---------------------------------------------------------------------------
      Total.........................                  0                  0                  0                  0
                                     ===========================================================================
      Total appropriations..........         22,500,000         18,500,000         20,000,000         18,000,000
----------------------------------------------------------------------------------------------------------------
[[Page H 10497]]
                              boat safety
                     (aquatic resources trust fund)
       Amendment No. 37: Appropriations $20,000,000 for boat 
     safety grants as proposed by the House instead of no funding 
     as proposed by the Senate. The budget proposal and the Senate 
     recommendation assumed this program would be fully funded as 
     a mandatory appropriation beginning in fiscal year 1996. When 
     combined with an estimated $10,000,000 in mandatory spending 
     authorized by the Clean Vessel Act of 1992, total program 
     resources are $30,000,000 for fiscal year 1996, which 
     compares to $32,500,000 for fiscal year 1995.
       Notwithstanding the difficult budget constraints faced by 
     the Congress, the conferees believe that to convert 
     discretionary grant programs such as this one to mandatory 
     funding--avoiding annual budget review and competition with 
     other programs in the appropriations process--would undermine 
     fiscal constraint and lessen Congressional oversight in an 
     area which has the country's second highest number of 
     transportation-related fatalities and is currently on the 
     National Transportation Safety Board's list of ``most 
     wanted'' safety improvements. Rather than put this program on 
     an automatic spending status and lessen oversight, the 
     conferees believe the Coast Guard and the department could 
     more effectively use these grant funds to target states with 
     poor boat safety records, and provide leveraged funding for 
     safety improvements.
       The conferees also note the Coast Guard is in error when it 
     assumes that funding for this and other maritime programs 
     comes at the expense of its operating budget. The conferees 
     wish to make clear to the Coast Guard and the department 
     that, while funding for boating safety grants is clearly a 
     portion of the overall allocation of budgetary resources in 
     this bill, it should not be assumed that reductions have been 
     made in Coast Guard operating expenses to accommodate this or 
     any other important maritime programs in the bill.
                             emergency fund
                (limitation on permanent appropriations)
                    (oil spill liability trust fund)
       Amendment No. 38: Deletes limitation of $3,000,000 on the 
     permanent appropriation authorized in section 1012(a)(4) of 
     the Oil Pollution Act of 1990 proposed by the House. The 
     Senate bill contained no similar limitation.
                    Federal Aviation Administration
                               operations
                     (including transfer of funds)
       Amendment No. 39: Inserts heading ``including transfer of 
     funds'' as proposed by the Senate. This is necessary due to 
     the disposition of amendment numbered 46.
       Amendment No. 40: Appropriates $4,645,712,000 for FAA 
     operations instead of $4,600,000,000 as proposed by the House 
     and $4,550,000,000 as proposed by the Senate.
       The following table summarizes adjustments to the budget 
     estimate in the House and Senate bills and the conference 
     agreement, by budget activity:
                                                 FAA OPERATIONS                                                 
----------------------------------------------------------------------------------------------------------------
                                                                                                   Conference   
                                                             House bill        Senate bill         agreement    
----------------------------------------------------------------------------------------------------------------
Operation of the ATC system:                                                                                    
    Budget estimate....................................      2,228,634,000      2,228,634,000      2,228,634,000
    Adjustments to budget estimate:                                                                             
        Contract tower streamlining....................         -6,520,000                  0                  0
        ``Quality through partnership''................         -1,790,000                  0         -1,790,000
        General reduction..............................                  0        -28,310,000                  0
        Acclerated promotion...........................                  0                  0         -4,300,000
                                                        --------------------------------------------------------
          Amount recommended...........................      2,220,324,000      2,200,324,000      2,222,544,000
                                                        ========================================================
NAS logistics support:                                                                                          
    Budget estimate....................................        185,158,000        185,158,000        185,158,000
    Adjustments to budget estimate:                                                                             
        Motor fleet, FAALC.............................         -3,100,000                  0                  0
        Depot spares...................................         +4,000,000                  0                  0
        General reduction..............................                  0         +4,493,000                  0
                                                        --------------------------------------------------------
          Amount recommended...........................        186,058,000        180,665,000        185,158,000
                                                        ========================================================
Maintenance of ATC system:                                                                                      
    Budget estimate....................................        868,297,000        868,297,000        868,297,000
    Adjustments to budget estimate:                                                                             
        AMASS maintenance..............................         -2,000,000                  0         -2,000,000
        OASIS maintenance..............................           -100,000                  0           -100,000
        Undefined inflation............................                  0         -3,602,000         -3,602,000
                                                        --------------------------------------------------------
          Amount recommended...........................        866,197,000        864,695,000        862,595,000
                                                        ========================================================
Leased telecommunications:                                                                                      
    Budget estimate....................................        328,423,000        328,423,000        328,423,000
    Adjustments to budget estimate:                                                                             
        Administrative communications..................         -4,680,000                  0         -1,500,000
        WECO switch offset.............................         -2,000,000                  0         -2,000,000
        General reduction..............................                  0         -2,078,000                  0
                                                        --------------------------------------------------------
          Amount recommended...........................        321,743,000        326,345,000        324,923,000
                                                        ========================================================
Aviation regulation/certification:                                                                              
    Budget estimate....................................        399,711,000        399,711,000        399,711,000
    Adjustments to budget estimate:                                                                             
        Flight standards staff increase................         -4,954,000         -4,954,000                  0
        New data systems...............................         -1,634,000         -1,634,000         -1,634,000
        PCS moves......................................           -617,000           -617,000           -617,000
        OMEGA navigation system........................         -8,556,000         -2,056,000         -1,840,000
                                                        --------------------------------------------------------
          Amount recommended...........................        383,950,000        390,450,000        395,620,000
                                                        ========================================================
Aviation standards:                                                                                             
    Budget estimate....................................        111,395,000        111,395,000        111,395,000
    Adjustments to budget estimate:                                                                             
        Hold costs to fiscal year 1995 level...........         -2,644,000         -2,644,000         -2,644,000
                                                        --------------------------------------------------------
          Amount recommended...........................        108,751,000        108,751,000        108,751,000
                                                        ========================================================
Aviation security:                                                                                              
    Budget estimate....................................         65,769,000         65,769,000         65,769,000
    Adjustments to budget estimate:                                                                             
        Hold costs to fiscal year 1995 level...........           -920,000                  0                  0
        General reduction..............................                  0           -769,000                  0
                                                        --------------------------------------------------------
          Amount recommended...........................         64,849,000         65,000,000         65,769,000
                                                        ========================================================
NAS Design and management                                                                                       
    Budget estimate....................................         53,277,000         53,277,000         53,277,000
    Adjustments to budget estimate:                                                                             
        General reduction..............................         -8,277,000           -277,000         -3,000,000
                                                        --------------------------------------------------------
          Amount recommended...........................         45,000,000         53,000,000         50,277,000
                                                        ========================================================
Administration of airports:                                                                                     
    Budget estimate....................................         42,173,000         42,173,000         42,173,000
    Adjustments to budget estimate:                                                                             
        Staffing increase..............................           -643,000           -673,000           -650,000
                                                        --------------------------------------------------------
          Amount recommended...........................         41,530,000         41,500,000         41,523,000
                                                        ========================================================
[[Page H 10498]]
                                            FAA OPERATIONS--Continued                                           
----------------------------------------------------------------------------------------------------------------
                                                                                                   Conference   
                                                             House bill        Senate bill         agreement    
----------------------------------------------------------------------------------------------------------------
Commercial space transportation:                                                                                
    Budget estimate....................................          6,541,000          6,541,000          6,541,000
    Adjustments to budget estimate:                                                                             
        Hold travel to fiscal year 1995 level..........            -45,000            -45,000            -45,000
        Contract programs..............................           -666,000           -666,000           -666,000
        Delete industry support........................            -60,000            -60,000            -60,000
                                                        --------------------------------------------------------
          Amount recommended...........................          5,770,000          5,770,000          5,770,000
                                                        ========================================================
Human resource management:                                                                                      
    Budget estimate....................................        231,947,000        231,947,000        231,947,000
    Adjustments to budget estimate:                                                                             
        Labor, personnel and human relations...........        -22,142,000                  0        -17,197,000
        Centralized training...........................        -10,050,000                  0         -8,000,000
        MARC...........................................           +250,000                  0           +250,000
        General reduction..............................                  0        -23,447,000                  0
                                                        --------------------------------------------------------
          Amount recommended...........................        200,005,000        208,500,000        207,000,000
                                                        ========================================================
Executive direction and management:                                                                             
    Budget estimate....................................        189,216,000        189,216,000        189,216,000
    Adjustments to budget estimate:                                                                             
        Staffing reductions............................         -5,390,000                  0         -3,169,000
        Regional public affairs staffing...............         -2,047,000                  0         -2,047,000
        General reduction..............................         -6,779,000         -9,216,000                  0
                                                        --------------------------------------------------------
          Amount recommended...........................        175,000,000        180,000,000        184,000,000
                                                        ========================================================
Account-wide adjustments:                                                                                       
    Administration aircraft............................         -3,600,000                  0         -1,500,000
    Adjustments to budget estimate:                                                                             
    SAE grant..........................................           -105,000                  0                  0
    Overseas personnel assignments.....................           -500,000                  0           -500,000
    Non-pay inflation..................................         -4,824,000                  0         -4,824,000
    Workers' compensation..............................         -1,394,000                  0         -1,394,000
    Undistributed......................................         -8,754,000        -15,000,000                  0
    Operational pay differential.......................                  0        -45,000,000                  0
    Non-pay inflation, administrative aircraft, and GSA                                                         
     vehicles..........................................                  0         -5,000,000                  0
                                                        --------------------------------------------------------
          Amount recommended...........................        -19,177,000        -65,000,000         -8,218,000
                                                        ========================================================
Offsetting receipts: Amount recommended                                  0        -10,000,000                  0
                                                        --------------------------------------------------------
      Total appropriation..............................      4,600,000,000      4,550,000,000      4,645,712,000
      Transfer from Coast Guard........................  .................  .................         60,000,000
      Total funding....................................      4,600,000,000      4,550,000,000      4,705,712,000
----------------------------------------------------------------------------------------------------------------
       Contract tower streamlining program.--The conferees agree 
     to restore the reduction of $6,520,000 proposed by the House 
     for this program, but agree with the House's observation that 
     in past years, funds for this important program have not been 
     spent as intended, but reprogrammed to other activities. The 
     conferees believe these delays have been at least partly due 
     to wage determinations required administratively by the 
     Department of Labor. Since the conferees agree with the 
     Senate language amending and streamlining the wage 
     determination process, it is hoped the contract tower program 
     will move forward without further delay and achieve the 
     promised budgetary savings. The FAA is directed not to 
     reprogram any of the $6,520,000 appropriated for this 
     program.
       ``Quality through partnership'' program.--The conference 
     agreement deletes the $1,790,000 budgeted for this program, 
     as proposed by the House. The conferees direct that no funds 
     be reprogrammed for this activity during fiscal year 1996.
       Accelerated promotion.--Since completion of House and 
     Senate action on this bill, program savings of $4,300,000 
     have been found resulting from discontinuation of the 
     accelerated promotion program for air traffic controllers. 
     When the Training Agreement for Accelerated Promotions 
     expired on July 15, 1995 and the administration made a 
     decision not to renew the program, these funds became excess 
     to budgetary requirements. This program allowed controllers 
     to receive grade-to-grade promotions without fulfilling the 
     time-in-grade requirements applicable to other federal 
     employees. The conferees have used these savings to restore 
     funding for additional FAA safety and certification 
     inspectors, in order to provide the highest level of aviation 
     safety possible.
       Aviation safety inspectors.--The conference agreement fully 
     funds the administration's request for 233 additional 
     aviation safety inspectors, including an additional 117 
     general aviation inspectors. This is in addition to the 
     increase in staffing provided for fiscal year 1995. Between 
     fiscal year 1994 and 1996, end-of-year staffing in this area 
     has risen from 4,051 to a funded level of 4,606, a two-year 
     increase of almost 14 percent. Despite difficult budget 
     constraints, the conferees believe this is a high priority 
     safety area worthy of additional funding.
       Flight service stations.--The conferees do not intend for 
     FAA to close flight service stations not in the currently-
     approved plan, and believe funding in the conference 
     agreement is sufficient for the FAA to continue to operate 
     and maintain its existing network of flight service stations 
     around the country.
       Allocation of budget reductions.--The conferees reiterate 
     to FAA and departmental officials that the funding 
     allocations and reductions specified in the bill, as detailed 
     and explained in this joint explanatory statement of the 
     committee of conference, are the best expressions of 
     Congressional intentions regarding the proper uses of 
     appropriated funds. Should the department decide to reduce 
     activities below the levels specified or implied herein, and 
     in particular if activities are to be substantially reduced 
     or terminated by agency action which is not specifically 
     addressed in this statement, the department shall receive 
     prior Congressional approval through the reprogramming 
     process.
       Mid America Aviation Resource Consortium.--The conferees 
     agree to provide $250,000 for continued support of the Mid-
     America Aviation Resource Consortium, as proposed by the 
     House, but intend that this be the final year of federal 
     support for this facility unless requested in the President's 
     budget.
       Loran-C automatic blink system.--The conferees agree with 
     the House's direction to expedite implementation of the 
     automatic blink system for the Loran-C navigation system.
       Aurora, IL en route center.--The conferees recognize the 
     urgency of solving the problems causing computer outages at 
     the FAA's air traffic control center in Aurora, Illinois. The 
     Aurora center is one of the busiest in the world and a 
     critical link in our nation's air traffic control system. 
     Years of delay in updating the present equipment have 
     resulted in an obsolete, aged, and failure-prone system in 
     the Aurora center. FAA has worked diligently to develop an 
     interim solution to this problem as quickly as is 
     technologically feasible, pending installation of a new air 
     traffic control system for the nation. The conferees deem 
     maintenance of reliable operational capability at the Aurora 
     center to be in the national interest of maintaining an 
     efficient and viable national air transportation system, and 
     deem the implementation of interim solutions to the problems 
     causing computer outages to be an urgent national priority. 
     FAA should simplify and expedite its procurement process to 
     the maximum extent feasible, and should allocate all 
     necessary personnel resources to assure that the existing 
     system remains in reliable working order. If FAA determines 
     that additional technological or personnel resources are 
     necessary to develop and implement interim solutions to these 
     problems, then the Congress would give serious consideration 
     to providing such additional resources. The conference 
     agreement includes $20,000,000, as proposed by the Senate, 
     for the display channel complex rehost program, which will 
     upgrade the computers at Aurora and similar centers.
       Amendment No. 41: Provides that $2,222,859,100 shall be 
     derived from the airport and airway trust fund instead of 
     $1,871,500,000 as proposed by the House and $1,865,000,000 as 
     proposed by the Senate.
       Amendment No. 42: Allows funds for any ``agency'' services 
     to be credited to this appropriation, as proposed by the 
     Senate. The House bill specified that only receipts for 
     ``aviation'' services be credited to the appropriation.
       Amendment No. 43: Requires that funds credited to the 
     appropriation be ``receipts 
[[Page H 10499]]
     for'' certain services, as proposed by the Senate. The House 
     bill contained no similar language.
       Amendment No. 44: Deletes Senate language allowing 
     $10,000,000 in additional safety and security fees to be 
     credited to this appropriation. The conferees have not yet 
     seen adequate details from the administration demonstrating 
     the unequivocal need for new fees, and explanation and 
     justification of the specific fees to be imposed, or a 
     convincing argument that the FAA's cost structure is of such 
     efficiency that new fees or taxes are necessary. In addition, 
     the conferees believe there will be substantial savings 
     achieved through the FAA reform provisions enacted in this 
     bill and the broader revisions currently under consideration 
     in the authorization process. Such cost savings, combined 
     with further review of the agency's cost structure, could 
     obviate or minimize the need for additional fees.
       Amendment No. 45: The conference agreement deletes language 
     proposed by the Senate which would have begun a three year 
     phaseout of the ``five percent bonus pay'' for air traffic 
     controllers and technicians, and inserts new language 
     allowing the Secretary of Transportation permissive transfer 
     authority of up to $60,000,000 from Coast Guard ``Operating 
     expenses'' to augment funding for air traffic control 
     operations and maintenance to enhance safety and security.
       FAA operations funding and transfer flexibility.--Since 
     consideration of the fiscal year 1996 transportation 
     appropriations bill by the House and Senate, the 
     administration has raised the priority of funding for FAA 
     operations and maintenance. For example, in a September 13, 
     1995 letter to the House and Senate Appropriations 
     Committees, the director of the Office of Management and 
     Budget advised ``the administration has serious concerns that 
     the funding level for Federal Aviation Administration (FAA) 
     Operations would make it difficult to continue today's high 
     levels of aviation safety. The administration's highest 
     priority is that FAA operations be funded at the requested 
     level.''
       The conferees have given the utmost consideration to the 
     administration's priorities. The conference agreement 
     includes an appropriation for FAA operations above the levels 
     proposed in either the House or Senate bill. In addition, the 
     agreement includes the authority for the Secretary of 
     Transportation to transfer up to $60,000,000 from Coast Guard 
     ``Operating expenses'' to augment the FAA's operating budget 
     for air traffic control operations and maintenance activities 
     which enhance aviation safety and security. It is not clear 
     at this time how much of this authority might be required, 
     but the conferees wish to provide maximum flexibility in the 
     event of a critical shortfall. With the transfer, total 
     funding for FAA operations in this bill is $4,705,712,000, 
     slightly above the administration's request.
       In addition, the conference agreement fully restores the 
     requested increase for aviation safety inspectors and 
     implements significant FAA personnel and procurement reforms. 
     The first action addresses a high administration priority and 
     provides the maximum resources possible for an important 
     safety initiative. Personnel and procurement reforms are 
     expected to free up significant operating funds or air 
     traffic control and safety-related activities. Overall, the 
     conferees are confident that the increased funding level, 
     combined with transfer flexibility and these additional 
     actions, will be sufficient to maintain aviation safety over 
     the coming year despite the difficult budget environment and 
     the necessity for government-wide downsizing.
       Five percent bonus pay.--The conference agreement restores 
     the reduction of $45,000,000 to begin a three year phaseout 
     of this pay proposed by the Senate. However, in order to 
     accommodate the $88,600,000 estimated for this program, the 
     conferees were required to hold funding for the airport 
     improvement program to the fiscal year 1995 level of 
     $1,450,000,000. Given the high priority placed on the five 
     percent bonus by the administration and the desire to 
     maintain morale in the air traffic controller workforce, the 
     conferees believe it prudent and necessary to delay some 
     airport construction projects to finance continuation of this 
     important activity.
       Aviation security.--The conference agreement fully funds 
     the administration's request of $65,769,000 for aviation 
     security activities due to the high priority of this activity 
     given recent threat assessments.
       Amendment No. 46: Provides for the transfer of unexpended 
     balances from prior appropriations for the office of 
     commercial space transportation to this appropriation, and 
     prohibits airport and airway trust fund resources from being 
     used to support the office of commercial space 
     transportation, as proposed by the Senate. The House bill 
     contained no similar provisions. The conference agreement 
     transfers this office from the office of the secretary of 
     transportation to the FAA.
                        facilities and equipment
                    (airport and airway trust fund)
       Amendment No. 47: Appropriates $1,934,883,000 for 
     facilities and equipment instead of $2,000,000,000 as 
     proposed by the House and $1,890,377,000 as proposed by the 
     Senate.
       The following table summarizes the fiscal year 1996 budget 
     estimate, House and Senate recommended levels, and the 
     conference agreement by program, project, and activity:
[[Page H 10500]]
     
[[Page H 10503]]
       Automated surface observing system.--In its July 30, 1992 
     report on the fiscal year 1993 DOT Appropriations Bill, the 
     Senate Appropriations Committee noted that certain critical 
     requirements for the automated surface observing system 
     (ASOS) appeared to be unfunded and not included in the 
     original ASOS contract. In a report to Congress dated July 
     26, 1993, the Acting Administrator of the FAA noted that 
     ground-to-air radios, freezing rain sensors, and improved 
     tower displays were ``considered urgent to achieve successful 
     completion of the ASOS program''. According to the FAA, 
     additional funding was not required for the radios, the rain 
     sensors would be funded over fiscal years 1994 and 1995, and 
     the display upgrade only awaited a cost estimate from the 
     National Oceanic and Atmospheric Administration. Given these 
     statements, the conferees were surprised to learn that a 
     recent ASOS program review revealed unfunded costs of 
     approximately $25,000,000 for these items, as well as 
     unfunded maintenance costs. The FAA is now developing a plan 
     to use a large portion of the fiscal year 1996 funds--
     appropriated to procure 106 additional systems--to address 
     this shortfall instead. The conferees emphatically direct the 
     FAA to use the fiscal year 1996 funding to procure the 
     additional ASOS systems, as was justified to the Congress in 
     the President's budget request.
       The conferees are disappointed to learn that the FAA did 
     not resolve these problems in 1993, as it led Congress to 
     believe, and are concerned that this is one more example of 
     an FAA acquisition culture in great need of the reforms 
     contained in this bill. If the FAA's estimates of a shortfall 
     are correct, then a reprogramming of non-ASOS funds should be 
     submitted for consideration through the normal process, in an 
     expedited manner as would be suggested by the agency's past 
     statements regarding the urgency of these improvements. In 
     addition, the conferees direct the FAA to report to the House 
     and Senate Committees on Appropriations by December 1, 1995 
     on the agency's plans to close the gap of installed versus 
     commissioned sites, without interrupting the scheduled 
     procurement of ASOS units.
       The conferees direct the FAA to expedite installation of 
     the long line connection providing ASOS data between the Ames 
     Airport, Iowa and the national weather net.
       Terminal area surveillance system.--The conference 
     agreement provides $5,000,000 for the terminal area 
     surveillance system (TASS) as proposed by the Senate instead 
     of $5,800,000 as proposed by the House. In its appeal to the 
     conferees, the FAA stated ``the TASS program has been 
     restructured from a single, multi-function system acquisition 
     program to a program focused on research into subsystem 
     performance enhancements.'' The conferees have no information 
     on this restructured program, and believe the TASS 
     development and acquisition program should proceed as 
     scheduled and planned prior to any restructuring. Fiscal year 
     1996 funding is provided specifically for the TASS system 
     acquisition program and not for any subsystem enhancements.
       Low-cost ASDE and non-radar runway incursion 
     technologies.--The conferees agree that the FAA should 
     explore lower cost surface detection technology solutions for 
     airports not scheduled to receive ASDE-3 equipment. The 
     conferees agree to provide $5,000,000 for the development and 
     demonstration of lower cost phased array surface detection 
     technology, instead of $8,000,000 as proposed by the House. 
     Funds should be used for purchase and installation of one 
     such system and for administrative costs related to 
     demonstration and evaluation of the system.
       Terminal doppler weather radar.--The conference agreement 
     does not include additional funding for the acquisition of 
     five new terminal doppler weather radars proposed by the 
     House. The conferees, however, are not convinced that the 
     ASR/windshear alert program, now in the research phase, will 
     be a cost-effective alternative to terminal doppler weather 
     radar in meeting future windshear requirements. The FAA has 
     not provided sufficient data regarding the performance of the 
     ASR/windshear alert program in dry regions of the country. 
     Moreover, under current projects, the ASR/windshear alert 
     program will not be commissioned until the year 2002. During 
     the fiscal year 1997 hearing cycle, the conferees expect to 
     further explore the efficacy of the ASR/windshear alert 
     program. In the interim, the conferees expect the FAA to move 
     forward with site surveys for the next five sites for which 
     TDWR systems are indicated, and to report on its progress no 
     later than sixty days following enactment of this Act. In 
     addition, the conferees direct the FAA to update the needs 
     requirement analysis for the terminal doppler weather program 
     that was first done in 1986 no later than sixty days 
     following enactment of this Act. The update should include a 
     review of the 47 sites included in the existing contract and 
     the 53 sites not scheduled under the current contract. The 
     conferees direct the FAA to review those sites experiencing 
     significant delays in the installation of TDWRs in the 
     existing contract and certify that each is likely to be 
     commissioned. With that review, and based upon the site 
     selection review for the next five sites, the FAA is urged to 
     request reprogramming permission, if necessary to continue 
     the TDWR program in fiscal year 1996.
       The conferees want to reiterate that funding for any TDWR 
     environmental impact statement (EIS) shall not prejudge the 
     outcome of the EIS for any particular site in New York except 
     as previously cited (North Belmore and Roslyn, New York).
       Instrument landing systems-establishment.--The conference 
     agreement provides $35,000,000 as proposed by the Senate 
     instead of $33,500,000 as proposed by the House. Of the 
     amount provided, $3,500,000 is for a category II ILS on 
     runway 7/25 in Rockford, Illinois, and $1,500,000 is for 
     benefit-cost analysis, environmental assessment, site survey, 
     and other activities necessary to determine the requirements 
     for an ILS (category I, II, or III) at Lanai Airport, Hawaii. 
     The conference agreement includes funding for a category III 
     ILS on runway 12L/30R at Lambert-St. Louis International 
     Airport, not runway 14R as specified in the House report.
       St. Paul, MN downtown airport tower.--In fiscal year 1995, 
     Congress provided $3,476,000 for the St. Paul, Minnesota 
     Downtown Airport to build a replacement air traffic control 
     tower. The FAA, however, used the airport's money to finance 
     cost overruns on another project. Given that the FAA 
     requested and Congress provided funds for the St. Paul tower 
     in fiscal year 1995, the conferees urge the FAA to honor 
     their prior agreement and make available the funds necessary 
     to build the replacement tower at the St. Paul Downtown 
     Airport.
       Financial baseline control notices.--The conferees 
     reiterate the House's direction that all financial baseline 
     control notices are to be submitted to the Congress at the 
     time they are approved by the agency. The documents 
     themselves should be submitted. The Appropriations Committees 
     will review this practice at the end of the fiscal year to 
     determine whether it should be continued.
       Support contracts.--A recent FAA study concluded that the 
     agency uses far too many support contractors, that agency 
     personnel could be much more cost conscious in their 
     contracting and oversight methods, and that in many cases, 
     contract employees are collated with FAA staff and virtually 
     indistinguishable from government employees. While the 
     conferees have high regard for the work of FAA's support 
     contractors, the study nevertheless raises questions about 
     the extensive nature of such contracts within the FAA. 
     Therefore, the conferees direct the FAA to report to the 
     House and Senate Committees on Appropriations by March 30, 
     1996 on its plan for resolving the findings and implementing 
     the recommendations of this study. This report should include 
     a discussion of the extent to which the procurement reforms 
     in this bill lessen the need for support contracts to meet 
     the current requirements of the procurement process.
       Amendment No. 48: Provides that, of the total amount 
     appropriated, $1,718,883,000 is available for three years, 
     instead of $1,784,000,000 in the House bill and 
     $1,674,377,000 in the Senate bill. This is the amount 
     provided for budget activities one through four.
       Amendment No. 49: Includes technical change proposed by the 
     Senate, deleting the word ``and'' to allow inclusion of 
     language contained in amendment numbered 50.
       Amendment No. 50: Provides that, of the total amount 
     appropriated, $10,000,000 is for noncompetitive cooperative 
     agreements with air carriers for acquisition, installation, 
     and evaluation of certain specified airport security 
     equipment, as proposed by the Senate. The House bill 
     contained no similar provision, although $10,000,000 was 
     provided for such equipment in the overall appropriation.
                        facilities and equipment
                    (airport and airway trust fund)
                              (rescission)
       Amendment No. 51: Rescinds $60,000,000 as proposed by the 
     House instead of $70,000,000 as proposed by the Senate.
                 research, engineering, and development
                    (airport and airway trust fund)
       Amendment No. 52: Appropriates $185,698,000 for research, 
     engineering, and development instead of $143,000,000 as 
     proposed by the House and $215,886,000 as proposed by the 
     Senate.
       The following table summarizes the fiscal year 1996 
     estimate, House and Senate recommendations, and the 
     conference agreement, by program, project, and activity:
----------------------------------------------------------------------------------------------------------------
                                       Fiscal year 1996                                            Conference   
            Program name                   estimate          House bill        Senate bill         agreement    
----------------------------------------------------------------------------------------------------------------
System development and                                                                                          
 infrastructure.....................        $13,551,000         $8,800,000        $12,500,000        $10,000,000
    System planning and resource                                                                                
     management.....................          3,953,000          3,000,000          3,700,000          2,000,000
    Technical laboratory facility...          9,598,000          5,800,000          8,800,000          8,000,000
Capacity and air traffic management                                                                             
 technology.........................         79,205,000         25,129,000         50,800,000         37,200,000
    Air traffic management                                                                                      
     technology.....................          9,875,000                  0          8,000,000          3,500,000
    Oceanic automation program......         10,470,000          8,000,000          8,000,000          8,000,000
    Terminal air traffic control                                                                                
     automation (TATCA).............         15,624,000                  0                  0                  0
    Runway incursion reduction......          8,177,000                  0          8,000,000          4,000,000
    System capacity, planning and                                                                               
     improvements...................         12,256,000          6,000,000         12,000,000          9,000,000
[[Page H 10504]]
----------------------------------------------------------------------------------------------------------------
                                       Fiscal year 1996                                            Conference   
            Program name                   estimate          House bill        Senate bill         agreement    
----------------------------------------------------------------------------------------------------------------
    Cockpit technology..............          8,266,000          6,500,000          8,200,000          6,700,000
    General aviation/vertical flight                                                                            
     technology.....................          3,327,000          2,629,000          2,600,000          2,600,000
    Modeling, analysis, and                                                                                     
     simulation.....................          7,807,000          2,000,000          4,000,000          3,400,000
    Future airway facilities                                                                                    
     technology.....................          3,403,000                  0                  0                  0
Communications, navigation and                                                                                  
 surveillance.......................         31,330,000         20,000,000         25,963,000         23,000,000
    Communications..................         15,367,000         10,000,000         10,000,000         10,000,000
    Navigation......................         15,963,000         10,000,000         15,963,000         13,000,000
    Surveillance....................                  0                  0                  0                  0
Weather.............................          6,493,000          6,493,000          6,493,000          6,493,000
Airport technology..................          9,278,000          1,000,000          8,000,000          6,000,000
Aircraft safety technology..........         47,547,000         29,578,000         40,548,000         37,978,000
    Aircraft systems fire safety....          3,906,000                  0                  0                  0
    Advanced materials/structural                                                                               
     safety.........................          2,973,000          2,000,000          2,500,000          2,000,000
    Propulsion and fuel systems.....          4,059,000                  0          4,055,000          3,400,000
    Flight safety/atmospheric                                                                                   
     hazards research...............          4,173,000          4,173,000          4,173,000          4,173,000
    Aging aircraft..................         21,415,000         15,000,000         21,415,000         20,000,000
    Aircraft catastrophic failure                                                                               
     prevention research............          4,357,000          2,705,000          2,705,000          2,705,000
    Fire research...................          4,604,000                  0                  0                  0
    Fire research and safety........                  0          5,700,000          5,700,000          5,700,000
    General aviation renaissance....          1,005,000                  0                  0                  0
    Cabin safety....................          1,055,000                  0                  0                  0
System security technology..........         43,808,000         23,000,000         37,900,000         36,045,000
    Explosives and weapons detection         33,179,000         23,000,000         30,000,000         29,000,000
    Airport security technology                                                                                 
     integration....................          2,530,000                  0          1,500,000          1,000,000
    Aviation security human factors.          4,603,000                  0          3,000,000          2,549,000
    Aircraft hardening..............          3,496,000                  0          3,400,000          3,496,000
Human factors and aviation medicine.         25,860,000         28,000,000         25,182,000         23,682,000
    Flight deck/maintenance/system                                                                              
     integration human factors......         11,182,000         15,500,000         11,182,000         11,182,000
    Air traffic control/airway                                                                                  
     facilities human factors.......         10,193,000         10,000,000         10,000,000         10,000,000
    Aeromedical research............          4,485,000          2,500,000          4,000,000          2,500,000
Environment and energy..............          5,429,000          1,000,000          4,500,000          3,800,000
Innovative/cooperative research.....          5,160,000                  0          4,000,000          1,500,000
                                     ---------------------------------------------------------------------------
      Total appropriation...........        267,661,000        143,000,000        215,886,000        185,698,000
----------------------------------------------------------------------------------------------------------------
       Innovative deicing technology.--In order to evaluate the 
     effectiveness of enclosed deicing techniques at smaller 
     regional airports, the conferees urge the FAA to consider the 
     application of Rhinelander-Oneida County Airport to develop a 
     test site for the evaluation of innovative deicing 
     technology. The conferees believe that this technology 
     warrants further exploration, and direct the FAA to provide a 
     full report to the House and Senate Committees on 
     Appropriations by March 15, 1996 on the results of testing 
     and the agency's plans to authorize airport grant funding or 
     passenger facility charges to enable airports to procure such 
     a system.
       Runway incursion reduction.--The conference agreement 
     includes $4,000,000 instead of no funds as proposed by the 
     House and $8,000,000 as proposed by the Senate. With the 
     funds provided, the conferees direct FAA to give immediate 
     priority and attention to the surface movement advisor 
     project. The conferees believe that reducing runway 
     incursions is a high priority for further research and rapid 
     prototyping. While funds in this long-term research activity 
     are being reduced below the administration's request, the 
     conference agreement includes an additional $7,000,000 in the 
     ``facilities and equipment'' account for non-radar 
     technologies and development of low-cost ASDE radar systems. 
     Total funding, over all accounts, for addressing this safety 
     problem in the conference agreement is approximately 
     $3,000,000 above the administration's request.
                       grants-in-aid for airports
                (liquidation of contract authorization)
                    (airport and airway trust fund)
       Amendment No. 53: Deletes heading ``including rescission of 
     contract authorization'' proposed by the Senate. This is a 
     technical amendment referring to a proposed rescission of 
     contract authority discussed under amendment numbered 56.
       Amendment No. 54: Limits obligations for the grants-in-aid 
     for airports program to $1,450,000,000 instead of 
     $1,600,000,000 as proposed by the House and $1,250,000,000 as 
     proposed by the Senate.
       Letters of intent.--The conferees agree with the Senate 
     direction that new letters of intent (LOIs) be awarded only 
     after (1) scheduled LOI payments fall to less than fifty 
     percent of AIP discretionary funds, and (2) FAA has improved 
     its ability to estimate airport development projects' impact 
     on systemwide capacity. Regarding the Senate's language on 
     possible letters of intent for the Northwest Arkansas 
     Regional Airport and the Philadelphia International Airport, 
     the conferees agree that the FAA should fairly consider LOI 
     applications from these airports, and base a final decision 
     on technical requirements at these sites and projections of 
     long term AIP funding, consistent with other directions in 
     this report.
       Regarding the Senate's language on a possible letter of 
     intent for the Seattle-Tacoma International Airport, the 
     conferees agree that the FAA should also fairly consider an 
     LOI application from this airport subject to: (1) completion 
     of the required FAA/federal environmental review process; (2) 
     resolution of the concerns brought forward in the report RO-
     FA-5-015 by the Office of Inspector General; and (3) approval 
     of the runway project from the Regional Transportation 
     Planning Organization for the central Puget Sound region by 
     amending the Regional Air System Plan. Finally, the FAA shall 
     fairly consider any information brought out at Congressional 
     field hearings on this matter, but not sign an LOI prior to 
     March 31, 1996.
       Amendment No. 55: Limits obligations for the military 
     airports program to $26,000,000 and the reliever airports 
     program to $48,000,000. The Senate bill proposed obligation 
     limitations of $20,000,000 and $50,000,000, respectively. The 
     House bill contained no similar limitations. The conference 
     agreement reflects the Senate's concerns over the 
     effectiveness of these programs, and frees up financial 
     resources for discretionary grants in other parts of the 
     overall AIP program.
       Huntsville, AL runway/taxiway rehabilitation project.--The 
     conferees understand that a specific allocation of fiscal 
     year 1996 funds for this project is not necessary, and that 
     sufficient fiscal year 1995 funding has been provided for 
     this project.
       State of Missouri flood-damaged airports.--The conferees 
     understand that a specific allocation of fiscal year 1996 
     funds for this project is not necessary, and that sufficient 
     fiscal year 1995 funding has been provided for this project.
       Amendment No. 56: Deletes rescission of contract authority 
     of $5,000,000 proposed by the Senate. The House bill 
     contained no similar rescission.
                     Federal Highway Administration
                limitation on general operating expenses
       Amendment No. 57: Limits general operating expenses of the 
     Federal Highway Administration to $509,660,000, instead of 
     $495,381,000 as proposed by the House and $548,434,000 as 
     proposed by the Senate.
       Amendment No. 58: Provides $208,946,000 for contract 
     programs of the Federal Highway Administration, instead of 
     $190,667,000 as proposed by the House and $248,909,000 as 
     proposed by the Senate.
       Recommended funding distribution by program and activity of 
     the administrative expenses and the research and development 
     programs of the Federal Highway Administration is as follows:
        Program/Activity                                     Conference
Administrative expenses....................................$254,714,000
Motor carrier safety administrative expenses.................46,000,000
                                                     Contract programs:
    Research and technology:
      Highway R&D............................................56,772,000
      Intelligent transportation systems....................109,779,000
      Technology deployment..................................12,622,000
      Long term pavement performance..........................8,739,000
      Local technical assistance..............................3,015,000
      National Highway Institute..............................4,369,000
      Disadvantaged business enterprises.....................10,000,000
      International transportation..............................500,000
      OJT/supportive services......................................
      Technical assistance to Russia............................400,000
      Truck dynamic test facility...............................750,000
      Transportation investment analysis...........................
      Cost allocation study...................................2,000,000
                                                       ________________
        Total...............................................509,660,000
       The highway research and development and intelligent 
     transportation systems programs by activity are as follows:
Highway research and development:
    Safety....................................................8,768,000
    Pavements.................................................9,247,000
    Structures...............................................13,211,000
    Environment...............................................5,593,000
    Right-of-way................................................429,000
[[Page H 10505]]
    Policy....................................................5,681,000
    Planning..................................................6,069,000
    Motor carrier.............................................7,774,000
                                                       ________________
      Total..................................................56,772,000
                                                       ================
Intelligent transportation systems:
    Research and development.................................24,479,000
    Operational tests........................................32,500,000
    Commercial vehicle operations............................14,500,000
    Automated highway system.................................14,000,000
    Advanced technology applications...................................
    Program and systems support..............................11,300,000
    Priority corridors.................................................
    Crash avoidance research.................................13,000,000
                                                       ________________
      Total.................................................109,779,000
       Office of motor carriers.--The conference agreement 
     provides a specific designation of funds for the Office of 
     motor carriers' administrative expenses within the Federal 
     Highway Administration's limitation on general operating 
     expenses. The House had included funding for the Office of 
     motor carrier's administrative expenses within the limitation 
     on general operating expenses.
       Fatigue-related issues.--The conferees direct the Federal 
     Highway Administration to issue an advanced notice of 
     proposed rulemaking (ANPRM) dealing with a variety of 
     fatigue-related issues no later than March 1, 1996. This 
     ANPRM is to be followed by a notice of proposed rulemaking 
     within one year, and a final rule or decision thereafter.
       Highway safety research.--Congress has long been active in 
     the advancement of highway safety and has recognized the 
     invaluable contributions which short-term, applied research 
     can make to improve safety. Given its concern for safety, the 
     Congress has, since the early 1990s, vigorously supported 
     this research by encouraging the Federal Highway 
     Administration to work closely with the Trucking Research 
     Institute (TRI) in the study of such issues as fatigue, sleep 
     disorders, brake maintenance, and rest stop access--all 
     investigations which may directly affect safety.
       In fiscal year 1994, the Congress continued its 
     participation in the development of an aggressive research 
     agenda by directing the FHWA to undertake three projects 
     totaling $1,750,000: Truck loading and unloading as a 
     possible contributor to driver fatigue; technology to 
     automate commercial vehicle roadside inspections; and 
     guidelines for the inspection and maintenance of wheels and 
     bearings. In fiscal year 1995, the Congress identified three 
     additional studies, totaling $2,500,000, for the 
     implementation in the same fashion with TRI: The use of 
     ``smart cards'' to facilitate compliance with motor carrier 
     safety rules; medical requirements associated with commercial 
     vehicle operation; and electronic truck and intermodel 
     information systems.
       Highway safety research and related activities continue to 
     be a priority of the Congress and the conferees. In fact, a 
     recent National Transportation Safety Board study on driver 
     fatigue and fatal truck accidents further highlights their 
     importance and currency. However, despite directions to the 
     contrary, the FHWA has been negligent in its efforts to 
     undertake any of the aforementioned research projects 
     designated by the Congress in either fiscal years 1994 to 
     1995.
       The conferees therefore reiterate the direction to FHWA to 
     use unobligated balances to make grants to, enter into 
     cooperative agreements or contracts with, or use any existing 
     technical support services agreements with TRI, in amounts 
     totaling not less than $4,000,000 to conduct the six studies 
     referenced above. The conferees further direct FHWA to 
     complete this process within 90 days from the date of 
     enactment of this Act and to advise the House and Senate 
     Committees on Appropriations when such actions have been 
     completed.
       Highway research and development.--The conference agreement 
     provides $8,768,000 for safety-related research and 
     development. The conferees direct that safety be funded at a 
     level of at least $12,768,000, including both ISTEA and 
     appropriations authority.
       Pavement research and development.--The conference 
     agreement provides $9,247,000 for pavement research and 
     development but does not include $1,000,000 as proposed by 
     the Senate for a joint university/industry grant.
       The conferees agree that expanded cost-effective use of 
     benign waste materials in infrastructure construction, based 
     on appropriate tests and standards to ensure long-term 
     environmental and physical performance, represents a priority 
     technology that is intended to be funded within the funds 
     available for Section 6005.
       National Center for Physical Acoustics.--The conferees urge 
     the Federal Highway Administration to work with the National 
     Center for Physical Acoustics in its effort to apply 
     acoustics to monitor traffic and/or pipeline maintenance.
       Motor carrier research.--The conference agreement provides 
     $7,774,000 for motor carrier research and includes funds for 
     two studies to (1) identify and test technological 
     interventions to offset driver fatigue and (2) determine the 
     extent of scheduling practices and their influences on truck 
     driver fatigue. No funds are provided for outreach and 
     technical assistance to regulated entities, to help complete 
     program uniformity activities, or to eliminate barriers to 
     effective intermodal freight transportation.
       Intelligent transportation systems.--The conference 
     agreement provides a total of $109,779,000 for intelligent 
     transportation systems (ITS). Within the funds provided for 
     operational tests, $10,000,000 shall be allocated to initiate 
     at least two different operational tests that evaluate 
     various elements of the systems architecture and integrate 
     the core infrastructure features, including advance traffic 
     management systems.
       ITS/commercial vehicle operations.--The conference 
     agreement provides $14,500,000 for commercial vehicle 
     operations (CVO). Within these funds, the conferees have 
     included $6,000,000 for development and initial pilot testing 
     of the CVO communications architecture and the purchase of 
     transponders.
       ITS program and systems support.--The conferees direct that 
     no more than $2,500,000 of the $11,300,000 provided for 
     program and systems support shall be spent on institutional 
     studies.
       The conferees are concerned that the joint program office 
     and the FHWA administrator have failed to submit several 
     reports pertaining to the national ITS program. These reports 
     include: the annual report on the ITS program (due in 
     December 1994); a report on the future of the CVO components 
     of the ITS program (due in May 1995); and the interim report 
     on the automated highway system program (due in April 1995). 
     These reports were intended to provide essential information 
     useful in evaluating the department's activities and plans. 
     The conferees direct the Secretary to ensure more timely 
     delivery of all reports relevant to the ITS program, as well 
     as other reports on departmental programs and activities.
                     highway-related safety grants
                (liquidation of contract authorization)
                          (highway trust fund)
                     (including transfer of funds)
       Amendment No. 59: Appropriates $11,000,000 to liquidate 
     contract authority obligations for highway-related safety 
     grants instead of $10,000,000 as proposed by the House and 
     $13,000,000 as proposed by the Senate.
       Amendment No. 60: Limits obligations to $11,000,000 for 
     highway-related safety grants instead of $10,000,000 as 
     proposed by the House and $13,000,000 as proposed by the 
     Senate.
       The conferees agree that not less than $1,000,000 shall be 
     allocated to the Office of Highway Safety to support the red 
     light running campaign and to increase compliance with yield 
     right-of-way or grade crossing signs.
                          federal-aid highways
                      (limitation on obligations)
                          (highway trust fund)
       Amendment No. 61: Limits obligations for the Federal-aid 
     highways program to $17,550,000,000 instead of 
     $18,000,000,000 as proposed by the House and $17,000,000,000 
     as proposed by the Senate.
       The conference agreement deletes the Senate's references of 
     priority designations within the Federal Highway 
     Administration's discretionary grant programs.
       The conferees direct that within the total provided for the 
     intelligent transportation systems program, funding shall be 
     available for the following projects in the amounts specified 
     below:
        Project                                                  Amount
I-10 Mobile, Alabama.........................................$3,000,000
Hazardous materials fleet management and monitoring system (NI2,500,000
Green light CVO project, Oregon...............................7,000,000
Capital beltway...............................................4,000,000
Houston, Texas................................................2,200,000
Syracuse, New York congestion management......................1,500,000
I-95 Corridor.................................................3,500,000
Johnson City, Tennessee.......................................1,500,000
Texas Transportation Institute..................................600,000
University of North Dakota....................................1,000,000
I-675/SR 844/Col. Glenn, Fairborn, Ohio.......................1,000,000
Paralympiad...................................................1,000,000
Santa Teresa border crossing, New Mexico........................900,000
Western Transportation Institute, Montana.....................1,000,000
TRANSCOM, New York/New Jersey.................................1,500,000
New York State Thruway........................................1,500,000
National Transportation Center, Oakdale, New York.............2,000,000
Advanced railroad/highway crossings...........................1,250,000
Minnesota GuideStar...........................................2,000,000
Salt Lake City................................................2,000,000
       In fiscal year 1996, the conference agreement earmarks a 
     total of $40,950,000 for intelligent transportation systems, 
     a reduction of over $35,000,000 compared with fiscal year 
     1995 levels. The conferees will give serious consideration to 
     discontinuing the practice of earmarking the intelligent 
     transportation systems program in fiscal year 1997.
       The conferees direct that any funding provided for 
     intelligent transportation systems be used only in support 
     of, or research on, intelligent transportation systems and 
     not for construction of buildings.
       Paralympiad.--The conferees direct the Federal Highway 
     Administration to pursue 
[[Page H 10506]]
     vigorously the deployment and demonstration of an 
     individualized routing system to assist people with 
     disabilities in moving about independently during the Tenth 
     Paralympiad. The conferees expect that the funds provided 
     will be expended and that a system will be delivered and 
     fully implemented in time of the Tenth Paralympiad.
       National Transportation Center, Oakdale, New York.--The 
     conference agreement includes $2,000,000 for the National 
     Transportation Center in Oakdale, New York, of which 
     $1,000,000 shall be available only for a NAFTA intermodal 
     transportation center.
       Minnesota GuideStar.--The State of Minnesota has 
     established a major laboratory for intelligent transportation 
     system activities in the Twin Cities metropolitan area. The 
     GuideStar network emphasizes transit systems in addition to 
     highways and has been recognized by the Federal Highway 
     Administration as a leader in the development and 
     implementation of ITS technologies. The conferees have 
     included $2,000,000 for this project. Up to 25 percent of 
     this amount may be made available to the University of 
     Minnesota's Center for Transportation Studies to support 
     education, research and training aspects of the project.
       World wide web site on the Internet.--The conferees urge 
     the FHWA to establish a world wide web site to permit 
     commuters in major metropolitan areas to retrieve through the 
     Internet video feeds from traffic cameras, average speeds as 
     determined by traffic monitoring systems, and traffic 
     messages that appear on variable message signs employed in 
     the area. To the extent possible, the Department should make 
     the data available in a standard format on a dial-in network 
     server that provides text-only access, and a standard 
     protocol for a touch-tone driven phone system.
                      motor carrier safety grants
                (liquidation of contract authorization)
                          (highway trust fund)
       Amendment No. 62: Limits obligations for motor carrier 
     safety grants to $77,225,000 instead of $79,150,000 as 
     proposed by the House and $75,000,000 as proposed by the 
     Senate.
       The conferees agree to the following program allocations:
Basic grants to states......................................$58,000,000
Traffic enforcement...........................................6,900,000
Hazardous materials training..................................1,500,000
Research and development........................................500,000
Public education................................................850,000
CDL enforcement...............................................1,000,000
Truck and bus accidents.......................................1,750,000
Uniformity grants.............................................3,450,000
Uniformity working groups.......................................450,000
Commercial vehicle information system.........................1,500,000
Drug interdiction assistance program............................500,000
Administrative expenses.........................................825,000
       Covert verification activities.--The conferees agree that, 
     within the basic grant program, $1,500,000 shall be used to 
     conduct covert operations in addition to those funds 
     originally intended under each state's enforcement plan. Of 
     the $1,500,000, $400,000 shall be allocated to develop a 
     model out-of-service prototype system that states can use to 
     assure that commercial vehicle drivers comply with those 
     orders.
       In addition to covert operations, the conferees believe 
     that the office of motor carriers should develop cost 
     effective rules to improve safety, educate motor carriers so 
     that they know how to comply with these rules, and promote 
     voluntary compliance.
       Assistance to border states.--The conferees agree that, 
     within the basic grant program, $750,000 shall be provided to 
     states along the Mexican border to ensure the safety of 
     increased traffic. These states face special problems 
     associated with a projected concentration of trade-related 
     commercial vehicle traffic once restrictions along the U.S.-
     Mexican border are significantly reduced on December 17, 
     1995.
       Truck and bus accidents.--The conferees have provided 
     $200,000 to conduct a model accident investigation and 
     reconstruction program. These funds shall be available to 
     train motor carrier safety officers on investigative 
     techniques at accident sites.
                    surface transportation projects
       Amendment No. 63: Deletes appropriation of $39,500,000 for 
     surface transportation projects proposed by the Senate. The 
     House provided no similar appropriation.
             National Highway Traffic Safety Administration
                        operations and research
       Amendment No. 64: Appropriates $73,316,570 for the general 
     fund portion of the operations and research activities of the 
     National Highway Traffic Safety Administration as proposed by 
     the House instead of $71,261,000 as proposed by the Senate.
       Amendment No. 65: Provides that of the general funds made 
     available for operations and research, $37,825,850 shall 
     remain available until September 30, 1998 as proposed by the 
     House instead of $36,770,676 as proposed by the Senate.
       Amendment No. 66: Includes language proposed by the House 
     which prohibits the National Highway Traffic Safety 
     Administration from obligating or expending funds to plan, 
     finalize, or implement any rulemaking that would alter the 
     tire grading standards currently in effect. The Senate bill 
     contained no similar provision.
                        operations and research
                          (highway trust fund)
       Amendment No. 67: Appropriates $51,884,430 from the highway 
     trust fund for operations and research activities of the 
     National Highway Traffic Safety Administration instead of 
     $52,011,930 as proposed by the House and $50,344,000 as 
     proposed by the Senate.
       Amendment No. 68: Provides that of the funds made available 
     for operations and research, $32,247,000 shall remain 
     available until September 30, 1998, instead of $32,770,670 as 
     proposed by the House and $31,716,720 as proposed by the 
     Senate.
       The conference agreement for operations and research 
     (general fund and highway trust fund combined) includes the 
     following adjustments to the budget request
Rulemaking:
    Vehicle safety standards..................................-$200,000
    New car assessment program...............................-1,057,000
    Fuel economy program.....................................-2,165,000
    Theft program pilot project................................+890,000
Enforcement:
    Vehicle safety compliance..................................-500,000
    Auto safety hotline......................................-1,000,000
    Odometer fraud..............................................-40,000
Highway safety program:
    Safe communities injury control..........................-5,225,000
    Alcohol program............................................-548,000
    Pedestrian and bicycle.....................................-224,000
    National occupant protection...............................-392,000
    Child safety seat program..................................-600,000
    Police traffic system......................................-300,000
    Driver education............................................-75,000
    Older driver research......................................+100,000
    Driver fatigue...........................................+1,000,000
Research and analysis:
    Biomechanics.............................................-1,500,000
    Fatal accident reporting system............................-300,000
    National accident sampling system..........................-300,000
    Data analysis program......................................-500,000
    State data programs........................................-400,000
    Partnership for new generation vehicles..................-5,000,000
General administration:
    Strategic planning.........................................-200,000
Accountwide adjustments:
    Computer support...........................................-245,000
    Administrative.............................................-250,000
    Travel......................................................-50,000
    Overtime....................................................-60,000
                                                       ________________
        Net reduction.......................................-19,141,000
       Theft program.--The conference agreement provides $890,000 
     to establish pilot National Motor Vehicle Title Information 
     System programs. The conferees not that the Anti-Car Theft 
     Act of 1992 directed the Department of Transportation to 
     establish an information system for instant and reliable 
     access to titling information. The American Association of 
     Motor Vehicle Administrators, the Customs Service, and others 
     have stated that such a system is essential to prevent 
     thieves from obtaining legal ownership of stolen vehicles.
       Older drivers.--The conferees have provided $100,000 for 
     older driver research to improve and test referral systems 
     and develop performance assessment techniques. These 
     additional funds will advance NHTSA's goal of improving 
     driving performance and licensing of older drivers.
       Driver fatigue.--The conference agreement includes 
     $1,000,000 to analyze the role of river fatigue, sleep 
     disorders, and inattention in highway crashes and shall be 
     available to develop and test public education strategies and 
     countermeasures that make drivers aware of the dangers of 
     driving while fatigued.
       Section 403 programs.--The purposes of the section 403 
     programs is to research and test new highway safety ideas 
     that may be successfully implemented throughout the United 
     States. In recent years, some of these programs have received 
     ``seed money'' far longer than expected. The conferees agree 
     with the Senate direction that requires NHTSA to prepare a 
     report highlighting how much money section 403 programs have 
     received, what future financial support is expected for these 
     programs, and when such support can be terminated. The 
     conferees urge NHTSA to complete this report as soon as 
     possible and provide it to the House and Senate Committees on 
     appropriations by May 1, 1996.
       National advanced driving simulator.--the conferees have 
     provided $2,000,000 for the national advanced driving 
     simulator. The conferees direct the Department of 
     Transportation to allocate the costs of the simulator among 
     the participating modal administrations, including the 
     Federal Highway Administration, Federal Transit 
     Administration, Federal Railroad Administration, and the 
     Intelligent transportation systems joint program office, as 
     part of the department's 1997 budget request. Also, the 
     conferees urge the department to discuss additional cost 
     sharing commitments with the departments of Defense and 
     Health and Human Services.
                        operations and research
                             (rescissions)
       Amendment No. 69: Deletes rescissions of $4,547,185 in 
     unobligated balances previously made available for the 
     national advanced driving simulator as proposed by the 
     Senate.
[[Page H 10507]]
                     highway traffic safety grants
                (liquidation of contract authorization)
                          (highway trust fund)
       Amendment No. 70: Appropriates $155,100,000 to liquidate 
     contract authority obligations for highway traffic safety 
     grants as proposed by the Senate instead of $153,400,000 as 
     proposed by the House.
       Amendment No. 71: Limits obligations for highway traffic 
     safety grants to $155,100,000 as proposed by the Senate 
     instead of $153,400,000 as proposed by the House.
       Amendment No. 72: Provides $127,700,000 for state and 
     community highway safety grants instead of $126,000,000 as 
     proposed by the House and $128,000,000 as proposed by the 
     Senate. Of the total, the conferees agree that $4,700,000 
     shall be available to local communities to implement safe 
     communities initiatives and $9,200,000 for youth traffic 
     safety programs.
       Amendment No. 73: Provides $2,400,000 for the National 
     Driver Register as proposed by the House instead of 
     $2,100,000 as proposed by the Senate.
       Amendment No. 74: Provides that funding for the national 
     Driver Register shall be subject to authorization as proposed 
     by the Senate instead of subject to passage by the House of a 
     bill authorizing appropriations and for only the amounts 
     provided therein as proposed by the House.
       Amendment No. 75: Includes language proposed by the House 
     which prohibits any funding for highway traffic safety grants 
     to be used for construction, rehabilitation, or remodeling 
     costs, or for office furnishings and fixtures for state, 
     local, or private buildings or structures. Deletes language 
     proposed by the House which prohibits funds to be used to 
     purchase automobiles or motorcycles for state, local, or 
     private usage. The Senate bill contained no similar 
     provisions.
       Amendment No. 76: provides $5,211,000 for the 
     administration of state and community highway safety grants 
     as proposed by the Senate instead of $5,153,000 as proposed 
     by the House. The conferees agree that $300,000 of the 
     administrative takedown shall be expended to evaluate the 
     costs and benefits of the section 403 safe communities injury 
     control initiative. The evaluation shall be provided to the 
     House and Senate Committees on Appropriations by March 1, 
     1997.
       Amendment No. 77: Requires up to $500,000 shall be used for 
     technical assistance to states as proposed by the Senate 
     instead of allowing flexibility to use up to that amount, as 
     proposed by the House.
       Amendment No. 78: Provides $890,000 for administrative 
     expenses under the national Driver Register program as 
     proposed by the House instead of $777,000 as proposed by the 
     Senate.