Senate Report 105-55

(continued)

        
                          SHORE FACILITIES AND AIDS TO NAVIGATION                 

   The program level recommended is $73,000,000.                           


                                           SHORE FACILITIES AND AIDS TO NAVIGATION                                          
                                                  [In thousands of dollars]                                                 

                                                                        Fiscal year 1998 estimate    Committee recommendation    

Shore--General:                                                         6,000                        6,000                       
Groups/bases/stations/MSO's:                                            4,000                        4,000                       
Aids to navigation facilities: Waterways aids-to-navigation projects    5,000                        5,000                       
OMEGA termination cost                                                  6,700                        6,700                       
Coast Guard District 1--construct Bayonne pier                          4,100                        4,100                       
Integrated support command--Portsmount, VA:                             4,700                        4,700                       
Asset sales                                                             (9,000)                      (9,000)                     
                                                                        ---------------------------  --------------------------  
        Total                                                                69,000                       73,000                      


       Air Stations Brooklyn and Cape May. --The Committee understands that
   the Coast Guard has proposed to consolidate Air Station Brooklyn and Air
   Station Cape May due to improved operational capabilities of its assets 
   which result in budgetary savings. However, the Committee remains       
   concerned about maintaining critically important Coast Guard air rescue 
   response time in the New York City areas at the level currently provided
   by Air Station Brooklyn during the peak boating season. Therefore, the  
   Committee encourages the Coast Guard to establish and operate a seasonal
   air facility in the New York City area to provide helicopter rescue     
   capability during the period April 15 through October 15.               
       Kodiak electricity cogeneration .--The Committee encourages the     
   Coast Guard to explore innovative means of assisting the local          
   electrical cooperative from which it purchases power in upgrading its   
   power production capability.                                            
                      PERSONNEL AND RELATED SUPPORT                      

      The program level recommended is $47,000,000. Within the amount      
   provided, $500,000 shall be for core acquisition costs.                 
      The Committee has provided the full amount requested for AC&I        
   personnel and related support.                                          

                                                                                     
                              [In thousands of dollars]                              

Personnel and related support      Fiscal year 1998 estimate    Committee recommendation  

    Direct personnel costs                                46,500                      46,500  
    Core acquisition costs                                   500                         500  
                                 ---------------------------  --------------------------  
       Total                                              47,000                      47,000  

                              BILL LANGUAGE                              

       Asset sales .--The bill includes a provision which would credit the 
   proceeds from the sale or lease of surplus Coast Guard real property to 
   this appropriation. The administration requested this authority which   
   allows asset sale revenues to be credited to this appropriation as      
   offsetting collections, but limits the amount of offsetting collections 
   in fiscal year 1998 to $9,000,000. Any excess proceeds from asset sales 
   would accrue to the following fiscal year. Accordingly, the Committee   
   encourages the Coast Guard to explore the auction or sale of the        
   Governor's Island facility during fiscal year 1998 with an eye toward   
   supplmenting fiscal year 1999 appropriations. In addition, the bill     
   includes language that protects the Coast Guard from liability for the  
   cost of maintaining Governor's Island.                                  
      The Coast Guard's closure of Governors Island provides and example of
   the cost savings attainable by streamlining the agency's infrastructure 
   and the potential significant revenue available to the Coast Guard and  
   the rest of the Federal Government by selling nonessential or           
   noncritical, high-value assets. The Committee would also like to know   
   about additional properties of high value in the Coast Guard's real     
   property portfolio; therefore, the Coast Guard is directed to submit to 
   the Committee by April 2, 1998, a list of its 25 most valuable          
   properties. This list should include information on the fair market     
   value of each property (or an estimate thereof), the amount of land and 
   the number of buildings, the current use being made of the property, and
   the annual operating costs for the activities housed on each property.  
      The Coast Guard needs funding it can depend upon to carry out        
   necessary projects. The Senate supports the authority vested in the     
   Commandant which allows the sale of real property and specified         
   operational assets, with proceeds to be credited to the ``Acquisition,  
   construction, and improvements'' appropriation.                         
       Pier space use agreement .--The bill includes language that allows  
   the Secretary of Transportation, acting through the Commandant of the   
   Coast Guard, to enter into a long-term use agreement with the city of   
   Unalaska for dedicated pier space on the municipal dock. This authority 
   is necessary to support Coast Guard vessels when such vessels call on   
   the Port of Dutch Harbor, AK. The terms and conditions of the use       
   agreement shall be develop by the Secretary and the city of Unalaska.   
       New York search and rescue capability .--The Committee directs the  
   Department of Defense to provide facilities including runway; hangar;   
   fire crash and rescue; and support spaces at the Air National Guard site
   at the Francis S. Gabreski Airport, Hampton, Long Island, NY, to the    
   Coast Guard. This facility will provide seasonal search and rescue      
   capability during the period April 15 through October 15. Support spaces
   will consist of suitable operations, berthing, and maintenance spaces.  
       General provisions .--The Committee has included a general provision
   directing the transfer of the U.S.N.S. Edenton to the Coast Guard.      

                          ENVIRONMENTAL COMPLIANCE AND RESTORATION                




          Appropriations, 1997           $22,000,000



          Budget estimate, 1998                21,000,000



          Committee recommendation                21,000,000



      The Committee recommends funding of $21,000,000 to continue the      
   environmental restoration and compliance-related actions throughout the 
   Coast Guard.                                                            
      These fiscal year 1998 funds will be used to address environmental   
   problems at former and current Coast Guard units as required by         
   applicable Federal, State, and local environmental laws and regulations.
   Planned expenditures for these funds include major upgrades to petroleum
   and regulated-substance storage tanks, restoration of contaminated      
   ground water and soils, remediation efforts at hazardous substance      
   disposal sites, and initial site surveys and actions necessary to bring 
   Coast Guard shore facilities and vessels into compliance with           
   environmental laws and regulations.                                     
       ISC Kodiak remediation funding .--The investigation and potential   
   cleanup of 34 sites on ISC Kodiak, as per the 1990 Resources            
   Conservation Recovery Act consent order, goes well. Eight of these sites
   have been closed and eight other sites have been approved for no further
   action status. Due to reduced levels of contamination anticipated, lower
   than expected costs to meet consent order milestones, and successful    
   ongoing milestone negotiations with the regulatory bodies, annual       
   requirements for this project have been reduced from past levels of     
   $4,400,000 to $5,400,000 to about $3,000,000 to $3,500,000. Given       
   overall budget constraints and other demands placed on the              
   ``Environmental compliance and restoration'' appropriation, these levels
   will be adequate to continue this remediation effort in fiscal year     
   1998.                                                                   
                                  PORT SAFETY DEVELOPMENT                         




          Appropriations, 1997           $5,000,000



          Budget estimate, 1998                ...........................



          Committee recommendation                ...........................



      This appropriation provided funds in 1996 and 1997 for the reduction 
   of debt incurred by the Port of Portland, OR, from prior infrastructure 
   development. No funds are requested for 1998.                           
                                   ALTERATION OF BRIDGES                          




          Appropriations, 1997           $16,000,000



          Budget estimate, 1998                ...........................



          Committee recommendation                26,000,000



      The ``Alteration of bridges'' appropriation provides funds for the   
   Coast Guard's share of the cost of altering or removing bridges         
   obstructive to navigation. Under the provisions of the Truman-Hobbs Act 
   of June 21, 1940, as amended (33 U.S.C. 511 et seq.), the Coast Guard,  
   as the Federal Government's agent, is required to share with owners the 
   cost of altering railroad and publicly owned highway bridges which      
   obstruct the free movement of navigation on navigable waters of the     
   United States in accordance with the formula established in 33 U.S.C.   
   516.                                                                    
      The Committee directs that, of the funds provided, $5,000,000 shall  
   be allocated to the Sand Island Road Tunnel in Honolulu, HI, $3,000,000 
   shall be allocated to the Florida Avenue railroad/highway combination   
   bridge in New Orleans, LA, and $18,000,000 shall be allocated to the    
   Sidney Lanier highway bridge in Brunswick, GA.                          
                                        RETIRED PAY                               




          Appropriations, 1997           $617,284,000



          Budget estimate, 1998                645,696,000



          Committee recommendation                653,196,000



      The ``Retired pay'' appropriation provides for retired pay of        
   military personnel of the Coast Guard and Coast Guard Reserve, members  
   of the former Lighthouse Service, and for annuities payable to          
   beneficiaries of retired military personnel under the retired           
   serviceman's family protection plan (10 U.S.C. 1431 1446) and survivor  
   benefit plan (10 U.S.C. 1447 1455), and for medical care of retired     
   personnel and their dependents under the Dependents Medical Care Act.   
   The average number of personnel on the retired rolls is estimated to be 
   31,279 in fiscal year 1998, as compared with an estimated 30,433 in     
   fiscal year 1997 and 29,650 in fiscal year 1996.                        
      The bill includes $653,196,000 for retired pay, consistent with the  
   budget request, adjusted by $6,100,000 to annualize fiscal year 1997    
   supplemental funding. This is scored as a mandatory appropriation in the
   congressional budget process.                                           
      In addition, this funding level includes $1,400,000 in anticipation  
   of congressional action to extend partial veteran benefits to Merchant  
   Mariners who served between August 16, 1945, and December 31, 1946. The 
   Committee recommends the additional funds for the Coast Guard to process
   up to 50,000 applications in fiscal year 1998.                          
                                      RESERVE TRAINING                            




          Appropriations, 1997           $65,890,000



          Budget estimate, 1998                65,000,000



          Committee recommendation                65,535,000



      Under the provisions of 14 U.S.C. 145, the Secretary of              
   Transportation is required to adequately support the development and    
   training of a Reserve force to ensure that the Coast Guard will be      
   sufficiently organized, manned, and equipped to fully perform its       
   wartime missions. The purpose of the Reserve training program is to     
   provide trained units and qualified persons for active duty in the Coast
   Guard in time of war or national emergency, or at such other times as   
   the national security requires. Coast Guard reservists must also train  
   for mobilization assignments that are unique to the Coast Guard in times
   of war, such as port security operations associated with the Coast      
   Guard's Maritime Defense Zone [MDZ] mission and include deployable port 
   security units.                                                         
      The Committee has provided $65,535,000 for Reserve training. The     
   amount provided is $535,000 above the President's request.              
   The Coast Guard is provided Reserve training funding as follows:        


                                                                                                                                           
                                                         [In thousands of dollars]                                                         

Functional program element              Fiscal year 1997 levels    President's request (7,600 SELRES)    Committee recommendation (8,000 SELRES)  

Drill pay and benefits                                   26,763                                26,203                                     26,763  
Full-time support personnel                              20,904                                21,013                                     21,013  
Annual training program                                  11,665                                11,467                                     11,467  
District administration/training                          2,315                                 2,250                                      2,250  
Recruiting                                                2,051                                 2,066                                      2,066  
O/M support to training facilities                        1,532                                 1,316                                      1,316  
Headquarters administration                                 660                                   685                                        660  
                                      -------------------------  ------------------------------------  -----------------------------------------  
Total                                                    65,890                                65,000                                     65,535  

                        RESEARCH, DEVELOPMENT, TEST, AND EVALUATION               


                                                                               

                                  General         Trust          Total  

    Appropriations, 1997          $14,180,000    $5,020,000    $19,200,000  
    Budget estimate, 1998          15,500,000     3,500,000     19,000,000  
    Committee recommendation       16,500,000     3,500,000     20,000,000  

      The Coast Guard's Research and Development Program seeks to improve  
   the tools and techniques with which Coast Guard carries out its varied  
   operational missions and to increase the knowledge base upon which it   
   depends to fulfill its regulatory responsibilities.                     
      The bill includes $20,000,000 for research, development, test, and   
   evaluation, which is $1,000,000 above the budget request.               
   The Committee recommendation for funding distribution is as follows:    


                                                                                        
                                [In thousands of dollars]                               

                    Fiscal year 1997    Fiscal year 1998 estimate    Committee recommendation  

Program areas:                 1,872                        1,875                       1,875  
                  ------------------  ---------------------------  --------------------------  
Total                         19,200                       19,000                      20,000  


      The Committee has made a slight adjustment to the fiscal year 1998   
   request for research and development. In the marine environmental       
   protection area, the Committee has provided the amount requested for the
   aquatic nuisance species program, which is $1,529,000 and increased the 
   funding for this activity by $1,000,000 to further research effects into
   a nonchemical interim ballast management practice for fully loaded      
   vessels to prevent the ballast-mediated transfer of species. This       
   research should focus in particular on vessels reporting no ballast on  
   board [NOBOB]. In addition, this funding is also intended to assist the 
   Coast Guard's other efforts consistent with the National Invasive       
   Species Act.                                                            
                                        BOAT SAFETY                               

                      (aquatic resources trust fund)                     




          Appropriations, 1997           $35,000,00006



          Budget estimate, 1998\1\                (55,000,000)



          Committee recommendation                35,000,00006


                  \1\The President's budget proposed, contingent on enactment of 
         legislation, that $55,000,000 be available as a direct (mandatory)      
         program and no discretionary funds.                                     


      This account provides financial assistance for a coordinated National
   Recreational Boating Safety Program for the several States. Title 46,   
   United States Code, section 13106, establishes a ``Boat safety'' account
   from which the Secretary may allocate and distribute matching funds to  
   assist in the development, administration, and financing of qualifying  
   State programs. The ``Boat safety'' account consists of amounts         
   transferred from the highway trust fund which are derived from the      
   motorboat fuel tax (18.4 cents per gallon).                             
      The President's budget requests no discretionary funding in 1998.    
   Instead, the President's budget proposes to provide all funding for the 
   State boating safety grant program by providing $35,000,000 from the    
   aquatic resources trust fund, together with $20,000,000 from the        
   7E``Sport fish restoration'' account as authorized under the Clean      
   Vessel Act of 1992 (title V of the Oceans Act of 1992).                 
      The Committee cannot support the administration's proposal to convert
   this program to mandatory spending. After highway fatalities,           
   recreational boating accidents result in the highest number of          
   transportation fatalities annually. The number of boats is increasing   
   each year and the National Transportation Safety Board continues to list
   boating safety as one of the areas most in need of safety improvement.  
   Annual congressional review and guidance is necessary for timely        
   implementation of boating safety initiatives.                           

                              FEDERAL AVIATION ADMINISTRATION                     

                           SUMMARY OF FISCAL YEAR  1998  PROGRAM                  

      The Federal Aviation Administration traces its origins to the Air    
   Commerce Act of 1926, but more recently to the Federal Aviation Act of  
   1958 which established the independent Federal Aviation Agency from     
   functions which had resided in the Airways Modernization Board, the     
   Civil Aeronautics Administration, and parts of the Civil Aeronautics    
   Board. FAA became an administration of the Department of Transportation 
   on April 1, 1967, pursuant to the Department of Transportation Act      
   (October 15, 1966).                                                     
      The total recommended program level for the FAA for fiscal year 1998 
   amounts to $9,179,154,883 including $50,000,000 in user fees credited to
   the ``Operations'' appropriation and a $1,700,000,000 obligation        
   limitation on the use of contract authority for the Airport Grants      
   Program. The following table summarizes the Committee's recommendations:

                                                     [In thousands of dollars]                                                    

Program                                      Fiscal year 1997 enacted      Fiscal year 1998 budget estimate    Committee recommendation  

Operations                                   \1\4,957,900                                         5,086,100                   5,375,900  
User fees:                                   \2\(75,000)                                            -50,000                     -50,000  
Facilities and equipment                     1,937,700                                            1,875,000                   1,889,005  
Research, engineering, and development       208,412                                                200,000                     214,250  
Grants-in-aid for airports\4\                1,460,000                                            1,000,000                   1,700,000  
National Civil Aviation Review Commission    2,400                                                                                       
                                             --------------------------  ----------------------------------  --------------------------  
Total                                        8,491,412                                            8,411,100                   9,129,155  

\1\Excludes reductions for TASC and awards pursuant to sections 321 and 346 of Public Law 104 205.                               
\2\Reflects maximum amount provided in Public Law 104 205. FAA estimates collections of only $20,000,000 in fiscal year 1997.    
\3\Proposed user fees.                                                                                                           
\4\Limitation on obligations.                                                                                                    

                                         OPERATIONS                               


                                                                                        

                                     General             Trust      User fees             Total  

    Appropriations, 1997          $3,182,500,000    $1,700,400,000    $75,000,000    $4,957,900,000  
    Budget estimate, 1998          1,611,100,000     3,425,000,000    350,000,000     5,386,100,000  
    Committee recommendation       3,424,272,000     1,901,628,000     50,000,000     5,375,900,000  

      FAA's ``Operations'' appropriation provides funds for the operation, 
   maintenance, communications, and logistic support of the air traffic    
   control and navigation systems and activities. It also covers the       
   administration and management of the regulatory, airports, commercial   
   space, medical and engineering, and development programs.               
       User fees. --The administration proposed collecting $400,000,000 in 
   user fees in fiscal year 1998. Of these fees, $100,000,000 is available 
   without Appropriations Committee action, including $50,000,000 for the  
   essential air service program and rural airport safety and $50,000,000  
   for FAA expenses.                                                       
      The bill includes a total of $5,325,900,000 for the operations       
   activities of the Federal Aviation Administration, of which             
   $1,901,628,000 shall be derived from the airport and airway trust fund. 
   An additional $50,000,000 for FAA operations will be derived from user  
   fees.                                                                   
      As in past years, FAA is directed to report immediately to the       
   Committees on Appropriations in the event resources are insufficient to 
   operate a safe and effective air traffic control system.                
      The activities of the operations accounts comprise eight main areas  
   consistent with FAA's reorganization to bring together functions and    
   activities that support the provision of a single, major service and to 
   establish a single executive responsible for that service.              
       Air traffic services. --The operations and maintenance of the       
   national air traffic control and navigation system and the installation 
   of air traffic and navigation equipment. Air traffic services consists  
   of five subactivities: air traffic, NAS logistics, systems maintenance, 
   leased telecommunications, and flight inspections.                      
       Aviation regulation and certifications.-- Promotes aviation safety  
   and ensures compliance with safety and certification standards for air  
   carriers, commercial operators, air agencies, airmen, and civil         
   aircraft, including aircraft registration; develops and administers     
   safety standards for airworthiness of aircraft and components. Includes 
   accident investigation, aviation medicine, aviation rulemaking, and the 
   suspected unapproved parts office.                                      
       Civil aviation security .--Provides for the overall planning,       
   direction, management, evaluation, and enforcement of civil aviation    
   security; supports efforts covering the investigation and interdiction  
   of illegal drugs and the assessment of foreign airports.                
       Research and acquisition.-- Responsible for all research,           
   prototyping, system development, and acquisition activities. Includes   
   the William J. Hughes Technical Center.                                 
       Administration of airports. --Provides for the administration of    
   airport grants and the safety inspection and certification of the       
   Nation's airports.                                                      
       Commercial space transportation. --Facilitates and promotes         
   commercial space launches by the U.S. private sector and licenses and   
   regulates commercial launches, launch site operations, and certain      
   payloads.                                                               
       Administration. --Funds the administrative functions that establish 
   policy and direct and develop programs in the areas of FAA aircraft use 
   and management, building space management, budget and accounting,       
   business information and consultation, human resource management, and   
   technical and management training; includes the regional administrators 
   and the Aeronautical Center Director.                                   
       Staff offices. --Funds the Office of the Administrator and the      
   Deputy Administrator, and offices that report directly to the           
   Administrator and provide executive direction; operations and           
   communications control; civil rights; government and industry affairs;  
   policy, planning, and international aviation; legal counsel; and public 
   affairs.                                                                
      The following table summarizes the Committee's recommendation in     
   comparison to the budget estimate:                                      

                                                        [In thousands of dollars]                                                       

                                           Fiscal year 1997 program level\1\    Fiscal year 1998 budget estimate    Committee recommendations  

Air traffic services                                               3,801,353                           4,192,516                    4,181,916  
Aviation regulation and certification                                501,921                             613,768                      614,168  
Aviation security                                                    114,360                              98,651                       98,651  
Research and acquisition                                              85,767                              92,858                       92,858  
Administration of airports                                            45,051                              48,052                       48,052  
Commercial space transportation                                        6,040                               6,182                        6,182  
Administration                                                       330,044                             262,143                      262,143  
Staff offices                                                         70,376                              71,930                       71,930  
Accountwide adjustments                                                       ----------------------------------  ---------------------------  
                                         -----------------------------------                                                                   
        Total                                                           4,954,912                           5,386,100                    5,375,900  
                                         ===================================  ==================================  ===========================  
User fees                                                                                                350,000                       50,000  
Appropriated funds                                                                                     5,036,100                    5,325,900  
                                         -----------------------------------  ----------------------------------  ---------------------------  
        Total available funds                                                                               5,386,100                    5,375,900  

\1\Includes reduction for TASC and awards pursuant to sections 321 and 346 of Public Law 104 205.                                      

                                    AIR TRAFFIC SERVICES                          

      The Committee recommends a total of $4,181,916,000 for the operation 
   and maintenance of the national air traffic control and flight service  
   system. This is $10,600,000 less than the budget estimate, but          
   $380,563,000 above the fiscal year 1997 level.                          
      Over the next decade, the Committee expects to see the billions of   
   dollars of new technology being developed, procured, and implemented    
   under the ``Facilities and equipment'' account--computers,              
   communications equipment, and information analysis capability--reflected
   in a projected trend toward more productive work forces and, therefore, 
   lower operations budget estimates.                                      
   The major activities include:                                           

       Air traffic. --The Committee recommends $2,536,258,000 and 24,581   
   FTE's. The Committee's recommendation provides a net increase of 500    
   additional air traffic controllers as request by the administration.    
     -- Equipment and staffing deficiencies in the New York/New Jersey    
  region .--The Committee continues to be concerned with the shortage of  
  adequately trained air traffic controllers as well as persistent        
  problems with air traffic control equipment at the FAA's air traffic    
  facilities in the New York/New Jersey metropolitan area. These staffing 
  shortages and equipment outages have resulted in increased delays and   
  inefficiencies that have placed an inordinate amount of pressure on the 
  overtaxed FAA work force, the air carriers serving the region, as well  
  as the flying public.                                                   
     The Subcommittee on Transportation held a special hearing on this    
  topic on June 12, 1997, during which testimony was received from Members
  of Congress as well as representatives of the FAA, air carriers, the air
  traffic controllers, and technicians unions. The hearing served to      
  highlight the urgent need for the FAA to expedite staffing of its       
  facilities in the New York/New Jersey area so that they meet or exceed  
  authorized staffing levels. It also highlighted the failure of the FAA  
  to fully utilize all the tools at its disposal, including the tools     
  granted under its personnel reform authorities, to alleviate critical   
  staffing shortages at these facilities as expeditiously as possible.    
  Finally, the hearing highlighted the need for the FAA to expedite the   
  installation of upgraded and new air traffic control equipment in order 
  to expedite the replacement of outdated equipment and assist the air    
  traffic controllers and air carriers serving the region in handling     
  growing volumes of air traffic, especially during inclement weather.    
     The Committee is pleased with the FAA's progress over the past year  
  in increasing the staffing levels at area towers, the New York TRACON   
  and the New York center. However, the Committee directs the             
  Administrator to meet the authorized staffing levels for all facilities 
  in the New York/New Jersey region by the dates identified in the pending
  agreements with the pertinent employee organizations. The Administrator 
  is further directed to inform the Committee immediately if it appears   
  that those deadlines will not be met. The Committee further requests the
  Administrator to use all tools at his or her disposal to rectify the    
  ongoing problems highlighted during the special hearing held by the     
  Transportation Subcommittee.                                            
     -- Contract tower program .--The Committee recommends $43,700,000 for
  the contract tower program, as requested by the administration, and     
  directs FAA to study traffic at the airports in New Bern and Hickory,   
  NC, and at the Salisbury/Wicomico County Regional Airport in Maryland,  
  and, if those airports meet or are projected to meet FAA's benefit/cost 
  criteria for tower operations within the next 2 years or if tower       
  operation could be justified under a cost-sharing arrangement, directs  
  FAA to open contract towers at those airports for service during fiscal 
  year 1998.                                                              
     The Committee is aware that FAA has notified 22 airports around the  
  Nation that the FAA will withdraw funding for towers at those airports  
  in 2 years unless the benefit/cost ratio at those airports exceeds 1.0  
  by the end of 1998. The Committee is concerned about the impacts loss of
  tower service would have at these 22 airports and will monitor          
  developments with respect to these airports. The Committee urges FAA to 
  work with the communities to explore alternatives, such as sharing of   
  the tower operating costs, to maintain tower operations if the benefit/ 
  cost criteria are unlikely to be satisfied at any of these airports by  
  the end of 1998.                                                        
       National airspace system logistics support. --The Committee         
   recommends $180,833,000 for this subactivity including 1,188 FTE's.     
      The funding provided for the national airspace system logistics      
   support activity is the full amount requested by the administration for 
   fiscal year 1998.                                                       
       Maintenance of air traffic control system. --The Committee          
   recommends $1,064,545 and 9,505 FTE's for this budget subactivity, as   
   requested by the administration. For the reasons discussed below, the   
   Committee has concluded that FAA is likely to continue to underutilize  
   its radio communications link [RCL] network in favor of leased          
   telecommunications. The Committee suggests that FAA accommodate the     
   $4,000,000 reduction by disposing of a part of its underutilized RCL    
   network and taking staffing savings.                                    
       Leased telecommunication services. --The Committee recommends       
   $343,339,000 for this budget subactivity. This is a reduction of        
   $4,000,000 from the request level.                                      
      FAA's leased telecommunications request for fiscal year 1998         
   ($347,339,000) represents a $17,077,000 increase over the fiscal year   
   1997 level. In the report accompanying last year's appropriation bill,  
   the Committee expressed concern about underutilization of the radio     
   communications link [RCL], which is owned by FAA and is one of the      
   largest microwave networks in the country. The alternative to increased 
   use of the RCL is increased reliance on leased telecommunications costs 
   for the use of private networks. The Committee directed FAA to transfer 
   to the radio communications link as much of the existing workload as    
   possible to better utilize that resource. The Committee understands that
   FAA plans to use an additional 2,300 to 2,900 RCL circuits rather than  
   leasing circuits from a private vendor. Even if FAA adopts this plan, it
   would still only be utilizing 56 to 61 percent of its analog circuits   
   and still have a significant amount of digital capacity sitting idle.   
      Given that FAA will apparently continue to underutilize the RCL and  
   prefers leased telecommunications links, the Committee is recommending a
   reduction of $4,000,000 from the request for the systems maintenance    
   subactivity.                                                            
       Satellite communications technology .--The Committee has added      
   $400,000 to the air traffic activity to provide a low-earth orbit [LEO] 
   satellite communication system at Anchorage, AK, to augment present     
   communications systems. Extensive areas of Alaska are not within present
   radio coverage. The LEO system will be available for widespread use in  
   Alaska within 2 years, and the Committee anticipates that pilots with   
   the appropriate onboard equipment will be able to use this new          
   capability to call FAA's flight service stations from such locations    
   within the State.                                                       
       Flight inspection. --The Committee recommends $63,942,000 and 579   
   FTE's for this activity which is the full amount requested.             
       Accountwide adjustment .--Based upon a GAO analysis of the request  
   of $51,200,000 for 82 NAS Plan Hand-Off projects that identified 14     
   percent in excess costs (associated, for example, with project          
   requirements that had been canceled since the budget estimates were     
   developed), the Committee believes $7,000,000 can be reduced from air   
   traffic services with no impact on FAA's ability to field new equipment.

                           AVIATION REGULATION AND CERTIFICATION                  

   The Committee recommends $614,168,000 and 5,882 FTE's for this activity.

      Funding provided for aviation regulation and certification is an     
   increase of $112,247,000 over fiscal year 1997 and $400,000 over the    
   administration's request. The Committee fully funds the requested       
   employment increases for administrative support ( +68), airworthiness   
   inspectors ( +117), airline operations inspectors ( +118), certification
   engineers and pilots ( +17), and manufacturing certification inspectors 
   ( +6).                                                                  
      The Committee has included an additional $400,000 to continue the    
   human intervention and motivation study [HIMS], a comprehensive         
   education and training program for alcohol and drug abuse prevention in 
   the airline industry with emphasis on peer identification and           
   intervention. Since its inception in 1974, HIMS has been a very         
   successful program to deal with the problem of alcoholism in the air    
   transportation workplace and to enhance the safety of air travel. Lack  
   of funding now threatens to stifle the program at a time when the need  
   for it is great, especially in the regional airline industry.           
                                  CIVIL AVIATION SECURITY                         

      The Committee recommends $98,651,000 and 1,109 FTE's for this budget 
   activity. The Committee has fully funded the civil aviation security    
   program.                                                                
                                  RESEARCH AND ACQUISITION                        

      The Committee recommends $92,858,000 and 809 FTE's for this budget   
   activity as requested by the administration. This is an 8-percent       
   increase over the fiscal year 1997 enacted level.                       
                                 ADMINISTRATION OF AIRPORTS                       

      The Committee recommends $48,052,000 and 495 FTE's for this activity,
   the same as the administration's request.                               
                     COMMERCIAL SPACE TRANSPORTATION                     

   The Committee recommends $6,182,000 and 34 FTE's for this activity.     

      The Committee's recommendation for the Commercial Space              
   Transportation Office is the same as the administration's request.      
                                       ADMINISTRATION                             

      The Committee recommends $262,143,000 and 1,987 FTE's for this budget
   activity. The Committee has fully funded the administration's request   
   for fiscal year 1998 in the administration activity level.              
                                       STAFF OFFICES                              

      The Committee recommends $71,930,000 and 591 FTE's for this budget   
   activity, the same as the requested amount.                             
                              BILL LANGUAGE                              

       Second career training program .--The Committee has included bill   
   language which was included in the President's budget request which     
   prohibits the use of appropriated funds for the second career training  
   program. This prohibition has been carried in annual appropriations acts
   for many years.                                                         
       Sunday premium pay .--The bill retains a provision, first included  
   in the fiscal year 1995 appropriations bill, which prohibits FAA from   
   paying Sunday premium pay, except in those cases where the individual   
   actually worked on a Sunday. This provision is identical to that which  
   was in effect for fiscal years 1995, 1996, and 1997. It was requested by
   the administration for fiscal year 1998.                                
       Manned auxiliary flight service stations .--The Committee has       
   retained bill language which was requested by the administration to     
   prohibit the use of funds for operating a manned auxiliary flight       
   service station in the contiguous United States. There is no funding    
   provided in the ``Operations'' account for such stations in fiscal year 
   1998.                                                                   
       Commercial space transportation .--The Committee has retained       
   language which prohibits the use of any funds from the airport and      
   airway trust fund for the support of the operations and activities of   
   the Associate Administrator for Commercial Space Transportation. This   
   prohibition was requested by the administration.                        
                                           OTHER                                  

       GPS nonprecision approaches .--The Committee urges FAA to establish 
   a global positioning system [GPS] nonprecision instrument approach at   
   Atka, AK, along with appropriate weather, communications, and lighting  
   equipment.                                                              
      The Committee also urges the FAA to seriously consider developing, in
   conjunction with the Pennsylvania Department of Transportation, Bureau  
   of Aviation, 200 helicopter-only GPS approach systems to support        
   emergency air medical services in Pennsylvania.                         
       User fees .--The administration's request included $300,000,000 in  
   new aviation user fees to be appropriated for operations. The Committee 
   does not recommend such an approach. Instead, the Committee recommends  
   an appropriation of $5,325,900,000, which will be supplemented by       
   $50,000,000 in user fees that were authorized last year and should be   
   available for operations expenses in fiscal year 1998.                  
      Last year the Committee approved an administration request for       
   $75,000,000 in new user fees in order to offset a portion of FAA        
   operations costs. In approving these new user fees the Committee made   
   clear this was on a trial basis only and further noted that expansion of
   the user fee concept in future years would depend upon whether a        
   consultative process had been developed in concert with specific fee    
   schedules. At this point, that standard has not been met. Based on the  
   FAA's first attempt to craft such a rule (the foreign overflight fee),  
   which has resulted in concerns being raised in Congress, the U.S.       
   Department of State, and the U.S. Court of Appeals for the District of  
   Columbia, it is apparent to the Committee that Congress should be very  
   wary of providing the FAA with such authority in the future.            
      House and Senate committees have made clear to FAA that, for safety  
   reasons, Congress did not intend to authorize foreign overflight fees on
   general aviation when it granted FAA authority to establish overflight  
   fees. In addition, the Committee believes general aviation operations   
   should be exempted from the rule since the administrative cost of       
   including such operations likely would exceed the anticipated fees from 
   general aviation sources. To date, FAA has failed to follow the         
   direction of Congress in this matter.                                   
      The Committee also believes Canada-to-Canada and Mexico-to-Mexico    
   overflights should be exempted, provided those two countries do not     
   impose similar charges on flights operated by United States citizens.   
   The Committee is concerned that, absent such an exemption, Mexico and   
   Canada will be forced to impose similar overflight fees on United States
   airlines that presently are not charged for such services. A fee which  
   invites retaliation by a foreign government is nothing more than a      
   hidden tax on the American people. Further, such fees may have the      
   perverse effect of influencing airlines' choice of airspace or takeoff  
   and landing preferences which may have a deleterious impact on safety.  
   In addition, since there are more American domestic operations that     
   transit foreign airspace, the financial impact on United States airlines
   will be greater than that on foreign airlines, so the Committee also    
   questions the FAA's interim final rule approach from a national interest
   vantage.                                                                
      The Committee is concerned that the FAA's interim final rule fails to
   comply with international law and bilateral aviation obligations of the 
   United States. The Committee understands the U.S. Department of State   
   has received diplomatic correspondence from many countries expressing   
   concern that the FAA, inconsistent with our international commitments,  
   failed to provide meaningful advance consultation. Specifically, these  
   governments assert that the cost allocation materials made available in 
   support of the interim final rule were insufficient to permit an        
   accurate review or analysis of the reasonableness of the overflight     
   charges and that FAA failed to adequately respond to questions raised   
   about the rule. The Committee expects that the FAA will be responsive to
   U.S. Department of State's entreaties that FAA address the concerns of  
   the international community. To date the rule has been formally objected
   to by Canada, the United Kingdom, Hong Kong, and Austria. In addition, a
   combined diplomatic note was presented to the Department of State by the
   Embassies of Australia, Belgium, Canada, Denmark, Finland, France,      
   Germany, Greece, Iceland, Ireland, Italy, Japan, the Netherlands, New   
   Zealand, Norway, Portugal, Spain, Sweden, Switzerland, the United       
   Kingdom, and the Commission of the European Union. These concerns are   
   currently the subject of pending litigation in the U.S. Court of Appeals
   for the District of Columbia.                                           
      The Committee rejects the FAA's contention to the international      
   community that the United States' obligation to provide prior           
   consultations can be fully met by giving affected parties an opportunity
   to comment after a rule has gone into effect. We expect foreign         
   countries to engage in meaningful prior consultations with U.S. airlines
   before they impose any fees and, accordingly, expect nothing less from  
   the FAA with respect to affected foreign parties. The Committee does not
   share FAA's cavalier attitude about complying with the United States'   
   international law and bilateral aviation obligations. The Committee is  
   disappointed that, to this point, FAA has failed to develop an adequate 
   consultative process and, based on FAA's performance in establishing    
   foreign overflight fees, is skeptical of FAA's ability to administer a  
   more comprehensive user fee system.                                     

                                  FACILITIES AND EQUIPMENT                        

                     (Airport and Airway Trust Fund)                     




          Appropriations, 1997           $1,937,700,000



          Budget estimate, 1998                1,875,000,000



          Committee recommendation                1,889,004,883



      Under the ``Facilities and equipment'' appropriation, safety,        
   capacity and efficiency of the Federal airway system are improved by the
   procurement and installation of new equipment and the construction and  
   modernization of facilities to keep pace with aeronautical activity and 
   in accordance with the Federal Aviation Administration's comprehensive  
   capital investment plan [CIP], formerly called the national airspace    
   system [NAS] plan.                                                      

                                                             CIP MILESTONES FOR MAJOR SYSTEM ACQUISITIONS                                                            

                                           System name                Year of first-site implementation                              Year of last-site implementation                 

                                                          1983 NAS plan    1991 CIP    1993 CIP    1996 CIP    1997 CIP    1983 NAS plan    1991 CIP    1993 CIP    1996 CIP    1997 CIP  

Advanced automation system [AAS]                                   1990        1991        1991       (\1\)       (\1\)             1994        2001        2004       (\1\)       (\1\)  
Air route surveillance radar [ARSR 4]                              1988        1993        1994        1996        1996             1991        1996        1996        1997       (\6\)  
Airport surface detection equipment [ASDE 3]                       1987        1992        1993        1993        1993             1990        1994        1996        1999        1999  
Automated weather observing system [AWOS]                          1986        1989        1989        1989        1989             1990        1997        1997        2000        2001  
Central weather processor [CWP]                                    1990        1991        1991        1991        1991             1991        1998     \7\1992     \7\1993     \7\1993  
Flight service automation system [FSAS]                            1984        1991        1991        1991        1991             1989        1995        1994        1995        1995  
Mode S                                                             1988        1993        1994        1994        1994             1993        1996        1996        1998        1999  
Radio microwave link [RML] replacement and expansion               1985        1986        1986        1986        1986             1989        1994        1993        1993        1993  
Terminal doppler weather radar [TDWR]                             (\8\)        1993        1994        1994        1994            (\8\)        1996        1996       (\9\)       (\9\)  
Voice switching and control system [VSCS]                          1989        1995        1995        1995        1995             1992        1997        1997        1997        1997  

\1\The AAS Program has been restructured into three areas: En route [DSR], terminal [STARS], and tower [TAP].                                                                                            
\2\STARS schedule was being rebaselined in keeping with new acquisition strategy.                                                                                                                        
\3\TCCC schedule was being rebaselined to reflect the incorporation of surface management advisor [SMA].                                                                                                 
\4\TCCC has been replaced by the Tower Automaton Program [TAP].                                                                                                                                          
\5\The Tower Automation Program [TAP] schedule is currently under review.                                                                                                                                
\6\ARSR 4 last-site implementation date has not been determined due to environmental issues at Ajo, AZ.                                                                                                  
\7\Dates denoted are for MWP I only. The CWP RWP segment has been eliminated as a continuation of the CWP Program, and has been merged with MWP II into the Weather and Radar Processor [WARP] Program.  
\8\The TDWR was not included in the 1983 NAS plan.                                                                                                                                                       
\9\TDWR last-site implementation indefinite due to site availability and land acquisition problems.                                                                                                      
Source: FAA 1983 NAS plan, 1991, 1993, 1995 CIP, 1997 GAO ``Status of the FAA's Modernization Program.''                                                                                                 


                                                                                                                                                                                                                                        REASONS FOR DELAY AND COST INCREASES IN CIP PROJECTS                                                                                                                                                                                                                                        

System name                                             Reasons for delay                                                                                                                                                                                                                                                                                                                                                                                                                                                              

Advanced automation system [AAS]                        In general, AAS delays were due to an overly ambitious plan, inadequate FAA oversight of the contractor, and ineffective resolution of requirements issues. The AAS Program has been restructured into three areas: En route, terminal, and tower.                                                                                                                                                                                                                             
Air route surveillance radar [ARSR 4]                   Problems with the radar's development and site preparation delayed first-site implementation. Testing took longer than originally expected. Delays have also occurred due to changes in system design, interface problems with other ATC systems, and slips in site construction. The last-site implementation change in the 1997 CIP is due to the environmental assessment having to be reaccomplished at Ajo, AZ.                                                           
Airport surface detection equipment [ASDE 3]            Original delays occurred because FAA and the contractor underestimated software complexity. FAA changed some requirements, and testing uncovered some performance problems. Software development, establishing remote towers, site selection/preparation, and the addition of seven systems have delayed the program.                                                                                                                                                          
Automated weather observing system [AWOS]               Site prep, installation, and maintenance problems, as well as delays in receiving Government-furnished equipment contributed to original delays. Last-site implementation delay occurred because of communications funding shortfalls and installation delays of the communications infrastructure to deliver weather information. The last-site implementation change in the 1997 CIP is due to the addition of ASOS systems per fiscal year 1997 congressional direction.    
Central weather processor [CWP]                         Early software development problems and software discrepancies during testing delayed the system in early stages. The program was descoped to just the CWP-MWP I segment, which is now fully implemented.                                                                                                                                                                                                                                                                      
Flight service automation system [FSAS]                 Original delays occurred because of software development and testing problems with the Model I system. Program implementation is complete.                                                                                                                                                                                                                                                                                                                                     
Mode S                                                  Problems in developing hardware and software during initial phases delayed the system, and software problems caused a delay in first-site implementation. Implementation of the last site has been moved due to en route interface requirements. The last-site implementation change in the 1997 CIP is due to site preparation delays.                                                                                                                                        
Radar microwave link [RML] replacement and expansion    In the early stages, site acquisition and prep problems delayed the system. Other delays occurred because of a change in the prime contractor and due to problems encountered during operational test and evaluation. Program implementation is complete.                                                                                                                                                                                                                      
Terminal doppler weather radar [TDWR]                   Site availability and land acquisition problems have delayed last-site implementation. Last-site implementation remains indefinite. TDWR has experienced schedule delays because of site availability and land acquisition problems.                                                                                                                                                                                                                                           
Voice switching and control system [VSCS]               Early delays were due to the two prototype contractors having technical difficulties in meeting FAA's requirements for system reliability. Additional delays occurred because of software development and integration problems during the upgrade of the prototype to a production model. The implementation schedule has not changed since the 1991 CIP. The last-site implementation was achieved on schedule in February 1997.                                              



      The bill includes an appropriation of $1,889,004,883 for the         
   facilities and equipment of the Federal Aviation Administration. The    
   Committee's recommended distributions of the funds for each of the major
   accounts are as follows:                                                

                                                               FACILITIES AND EQUIPMENT                                                               

Projects                                                                                     Fiscal year 1998 budget estimate  Committee recommendation    

Engineering, development, test, and evaluation:                                                                                                            
 En route programs:                                                                                                                                         
Aviation weather services improvements                                                                            $23,000,000  $23,000,000                 
Oceanic automation system                                                                                          32,000,000  32,000,000                  
Next generation VHF air/ground communication system                                                                 7,400,000  7,400,000                   
Air traffic management                                                                                             18,240,000  18,240,000                  
                                                                                           ----------------------------------  --------------------------  
Subtotal, en route programs                                                                                        80,640,000  80,640,000                  
                                                                                           ==================================  ==========================  
 Terminal programs:                                                                                                                                         
Terminal digital radar (ASR 11)                                                                                    42,200,000  35,800,000                  
Terminal Automation Program                                                                                        68,000,000  68,000,000                  
Weather systems processor [WSP]                                                                                     6,200,000  5,200,000                   
                                                                                           ----------------------------------  --------------------------  
Subtotal, terminal programs                                                                                       116,400,000  109,000,000                 
                                                                                           ==================================  ==========================  
 Landing and navigational aids programs:                                                                                                                    
Local area augmentation system [LAAS] for GPS                                                                       6,500,000  6,500,000                   
Wide area augmentation system [WAAS]                                                                              101,530,000  101,530,000                 
                                                                                           ----------------------------------  --------------------------  
Subtotal, landing and navigational aids programs                                                                  108,030,000  108,030,000                 
                                                                                           ==================================  ==========================  
 Research, test, and evaluation equipment and facilities:                                                                                                   
Independent operational test and evaluation [IOT&E] sup                                                             3,200,000  3,200,000                   
FAA Technical Center facility--technical building lease                                                             5,290,000  5,290,000                   
NAS improvement of system support laboratory                                                                        2,000,000  2,000,000                   
Technical Center facilities                                                                                         7,000,000  7,000,000                   
Infrared heating for aircraft deicing                                                                                          970,000                     
                                                                                           ----------------------------------  --------------------------  
Subtotal, research, test, and evaluation equipment and facilities                                                  17,490,000  18,460,000                  
                                                                                           ----------------------------------  --------------------------  
Total, engineering, development, test, and evaluation                                                             322,560,000  316,130,000                 
                                                                                           ==================================  ==========================  
Air traffic control facilities and equipment:                                                                                                              
 En route programs:                                                                                                                                         
Long Range Radar [LRR] Program--replace/establish                                                                   6,600,000  6,600,000                   
En Route Automation Program                                                                                       214,240,000  214,240,000                 
Next generation weather radar [Nexrad]                                                                              3,000,000  3,000,000                   
Air traffic operations management system [ATOMS]                                                                    1,000,000  1,000,000                   
Weather and radar processor [WARP]                                                                                 24,400,000  24,400,000                  
Aeronautical data link [ADL] applications                                                                           8,000,000  4,000,000                   
ARTCC building improvements/plant improvements                                                                     98,551,700  98,551,700                  
Voice switching and control system [VSCS]                                                                          50,700,000  50,700,000                  
Remote communication facilities [RCF's]--expand/relocate                                                            1,440,000  3,140,000                   
Air traffic management [ATM]                                                                                       44,200,000  44,200,000                  
Data multiplexing network [DMN]                                                                                     3,900,000  3,900,000                   
Critical communications support                                                                                     4,300,000  4,300,000                   
DOD base closure--facility transfer                                                                                 2,200,000  2,200,000                   
Backup emergency communications [BUUEC]--interim                                                                    8,500,000  8,500,000                   
Air/ground communication radio frequency interference                                                               2,000,000  2,000,000                   
ATC beacon interrogator [ATCBI] replacement                                                                         7,400,000  7,400,000                   
Low density radio communicaters link                                                                               29,840,000  23,840,000                  
ATC en route radar facilities                                                                                       6,748,300  6,748,300                   
En route communications and control facilities                                                                        918,295  918,295                     
Volcano monitor                                                                                                                2,000,000                   
                                                                                           ----------------------------------  --------------------------  
Subtotal, en route programs                                                                                       517,938,295  511,638,295                 
                                                                                           ==================================  ==========================  
 Terminal programs:                                                                                                                                         
Terminal doppler weather radar [TDWR]--provide                                                                      4,800,000  2,300,000                   
Terminal Automation Program                                                                                        40,000,000  40,000,000                  
Terminal air traffic control facilities--replace                                                                   62,000,000  70,000,000                  
Air traffic control tower [ATCT]/TRACON facilites--improve                                                         18,631,115                              
Terminal voice switch replacement [TVSR]/enhanced terminal voice switch                                             9,940,000  1,640,000                   
Radio control equipment                                                                                             3,000,000  3,000,000                   
Employee safety/OSHA and environmental standards compliance                                                        43,700,000  43,700,000                  
Chicago TRACON                                                                                                      4,700,000  4,700,000                   
New Austin Airport at Bergstrom                                                                                     3,700,000                              
Potomac (Dulles) TRACON                                                                                             2,600,000  2,600,000                   
Denver TRACON                                                                                                       1,200,000  1,200,000                   
Northern California TRACON                                                                                         21,700,000  21,700,000                  
Atlanta TRACON                                                                                                     15,600,000  15,600,000                  
Tower Automation Program                                                                                            2,000,000                              
Voice Recorder Replacement Program [VRRP]                                                                           3,000,000  3,000,000                   
NAS infrastructure management systems [NIMS]                                                                       26,750,000  25,350,000                  
Airport surveillance radar [ASR 9]                                                                                 23,700,000  23,700,000                  
Terminal radar [ASR]--improve                                                                                       3,240,550  3,240,550                   
Terminal communications improvements                                                                                2,189,002                              
                                                                                           ----------------------------------  --------------------------  
Subtotal, terminal programs                                                                                       292,450,667  261,730,550                 
                                                                                           ==================================  ==========================  
 Flight service programs:                                                                                                                                   
Automated surface observing system [ASOS]                                                                          14,850,000  24,850,000                  
FSAS operational and supportability implementation system [OASIS]                                                   4,900,000  4,900,000                   
Digital altimeter setting indicators [DASI]                                                                         1,600,000  1,600,000                   
Flight services facilities improvement                                                                              1,418,500  1,418,500                   
                                                                                           ----------------------------------  --------------------------  
Subtotal, flight services                                                                                          22,768,500  32,768,500                  
                                                                                           ==================================  ==========================  
 Landing and Navigational Aids Program:                                                                                                                     
Very high frequency omnidirectional radio range [VOR] with distance measuring equipment                             2,445,000  2,445,000                   
Instrument landing system [ILS]--establish/upgrade                                                                  3,000,000  23,000,000                  
ILS replace                                                                                                         2,200,000  2,200,000                   
Low level windshear alert system [LLWAS]--upgrade                                                                   4,300,000  4,300,000                   
Runway visual range [RVR]--establish                                                                                3,500,000  3,500,000                   
Gulf of Mexico Offshore Program                                                                                     3,200,000  3,200,000                   
Instrument landing system [ILS]--replace Wilcox Cat II/III                                                          2,745,000  2,745,000                   
Wide area augmentation system [WAAS]                                                                               51,300,000  51,300,000                  
Nondirectional beacon [NDB]                                                                                         1,400,000  1,400,000                   
Navigational and landing aids--improve                                                                              2,402,538  3,357,538                   
Tactical landing systems                                                                                                       10,000,000                  
Precision approach path indicators [PAPI]                                                                                      5,000,000                   
Juneau, AK                                                                                                                     3,500,000                   
                                                                                           ----------------------------------  --------------------------  
Subtotal, landing and navigational aids                                                                            76,492,538  115,947,538                 
                                                                                           ==================================  ==========================  
 Other ATC facilities programs:                                                                                                                             
Alaskan NAS interfacility communications system [ANICS]                                                             8,600,000  8,600,000                   
Fuel storage tank replacement and monitoring                                                                       30,000,000  30,000,000                  
FAA buildings and equipment--improve/modernize                                                                     10,000,000  10,000,000                  
Electrical power systems--sustain/support                                                                          16,200,000  20,200,000                  
Air navigational aids and air traffic control facilities (local projects)                                           2,000,000  2,000,000                   
Airport cable loop systems                                                                                            500,000  500,000                     
Computer-aided engineering graphics [CAEG] replacement                                                              1,000,000  1,000,000                   
Aircraft and Related Equipment Program                                                                              2,000,000  2,000,000                   
Aircraft fleet modernization                                                                                        2,701,000  18,951,000                  
                                                                                           ----------------------------------  --------------------------  
Subtotal, other ATC facility programs                                                                              73,001,000  93,251,000                  
                                                                                           ----------------------------------  --------------------------  
Total, air traffic control facilities and equipment                                                               982,651,000  1,015,335,883               
                                                                                           ==================================  ==========================  
Nonair traffic control facilities and equipment:                                                                                                           
 Support equipment:                                                                                                                                         
NAS Management Automation Program [NASMAP]                                                                          1,000,000  1,000,000                   
Hazardous materials management                                                                                     20,000,000  7,000,000                   
Aviation safety analysis system [ASAS]                                                                             16,800,000  16,800,000                  
Operational data management system [ODMS]                                                                           1,600,000  1,600,000                   
Logistics support systems and facilities [LSSF]                                                                     9,749,000  9,749,000                   
Test equipment--maintenance support for replacement                                                                   500,000  500,000                     
Integrated flight quality assurance                                                                                 4,000,000  4,000,000                   
Safety performance analysis system [SPAS]                                                                           4,100,000  4,100,000                   
Performance enhancement system [PENS]                                                                              11,000,000  11,000,000                  
National Aviation Safety Data Analysis Center [NASDAC]                                                              2,000,000  2,000,000                   
                                                                                           ----------------------------------  --------------------------  
Subtotal, support equipment                                                                                        70,749,000  57,749,000                  
                                                                                           ==================================  ==========================  
 Training, equipment, and facilities:                                                                                                                       
Distance learning                                                                                                   5,500,000  5,500,000                   
National airspace system [NAS] training facilities                                                                  1,500,000  1,500,000                   
Aeronautical Center training and support facilities                                                                 6,000,000  6,000,000                   
Airport firefighting training [RMESTC]                                                                                         750,000                     
                                                                                           ----------------------------------  --------------------------  
Subtotal, training, equipment, and facilities                                                                      13,000,000  13,750,000                  
                                                                                           ----------------------------------  --------------------------  
Total, nonair traffic control facilities and equipment                                                             83,749,000  71,499,000                  
                                                                                           ==================================  ==========================  
Mission support:                                                                                                                                           
 System support and services:                                                                                                                               
System engineering and development support                                                                         31,930,000  31,930,000                  
Program support leases                                                                                             27,500,000  27,500,000                  
Logistics support services [LSS]                                                                                    6,000,000  6,000,000                   
Mike Monroney Aeronautical Center--lease                                                                           15,200,000  15,200,000                  
In-plant national airspace system [NAS] contract support services                                                   2,500,000  2,500,000                   
Transition engineering support                                                                                     44,800,000  44,800,000                  
Frequency and spectrum engineering                                                                                  1,500,000  1,500,000                   
Permanent change of station [PCS] moves                                                                             3,800,000  3,800,000                   
FAA corporate system architecture                                                                                   5,200,000  5,200,000                   
Technical services support contract [TSSC]                                                                         54,700,000  54,700,000                  
Resource Tracking Program [RTP]                                                                                       500,000  500,000                     
Center for Advanced Aviation System Development                                                                    55,300,000  55,300,000                  
Year 2000 date change program                                                                                      18,000,000  18,000,000                  
                                                                                           ----------------------------------  --------------------------  
Total, mission support                                                                                            266,930,000  266,930,000                 
                                                                                           ==================================  ==========================  
Personnel and related expenses                                                                                    219,110,000  219,110,000                 
                                                                                           ----------------------------------  --------------------------  
Total, all activities                                                                                           1,875,000,000  1,889,004,883               


              engineering, development, test, and evaluation             

      The Committee recommends $316,130,000 for various engineering,       
   development, test, and evaluation activities.                           
      En route automation includes the display system replacement [DSR] as 
   a cost-effective modification to the initial sector suite system [ISSS];
   display channel complex rehost [DCCR], a low-risk contingency system;   
   advanced en route automation [AERA], enhancements providing direct      
   benefits to airway users; en route software development support [ERSDS],
   maintains software in existing system; en route automation equipment,   
   maintains existing hardware; flight data input/output [FDIO]; and en    
   route stand alone radar training system [ESARTS].                       
           En route programs                                                       

       Aviation weather service improvements .--The Committee has included 
   $23,000,000 as requested by the administration.                         
      The Committee is aware of a plan developed by the Port Authority of  
   New York and New Jersey in concert with the airports and airlines       
   serving the New York/New Jersey region to procure with non-Federal funds
   a prototype integrated terminal weather system [ITWS] for installation  
   at the New York TRACON. This installation will act as an interim measure
   until FAA installs a production model ITWS at Federal expense at the New
   York TRACON in 2001. The Committee strongly encourages the Administrator
   to work cooperatively and expeditiously with the Port Authority of New  
   York and New Jersey and the airports and air carriers serving the New   
   York/New Jersey region to ensure that this interim equipment is         
   installed and operational as soon as possible. The Committee further    
   directs that this interim installation, in no way, cause the FAA to     
   delay the delivery of the production model ITWS to the New York TRACON. 
       Oceanic automation system .--The oceanic automation system is a     
   state-of-the-art platform that would provide improved air traffic       
   control over the oceans. Of the amount requested, $2,000,000 would be   
   used for continued development of the data link component, and project, 
   $6,000,000 for program management, and $24,000,000 for phase 2, which is
   new software development replacing flight data processing structure and 
   software.                                                               
           Terminal programs                                                       

       Terminal digital radar (ASR 11). --The Committee has provided       
   $35,800,000 for the terminal digital radar (ASR 11) program, which is a 
   joint program with the Department of Defense and the Federal Aviation   
   Administration. That is $6,400,000 less than the administration's       
   request of $42,200,000. The administration's request includes           
   $33,000,000 for procurement of ASR 11 units and associated support costs
   and $9,200,000 for digitizers for the ASR 8 systems. The Committee      
   understands that FAA plans to buy 10 digitizers under the request and   
   that the leadtime for adding digitizers to the ASR 8's is about 1 year. 
   FAA's current schedule shows that 7 of the 10 digitizers are designated 
   for STARS equipment that will not be operational before May 2001.       
   Therefore, the Committee has reduced the request by $6,400,000, an      
   amount which can be deferred until fiscal year 1999 with no adverse     
   impact on the program.                                                  
       Terminal automation program. --The Committee has provided the       
   requested $68,000,000 for the terminal automation program, also known as
   standard terminal automation replacement system [STARS]. The fiscal year
   1998 request is the second year on the STARS contract. The contract was 
   awarded in September 1996. Fiscal year 1998 funds will be used to test  
   and enhance commercial-off-the-shelf/nondevelopmental item              
   [COTS/NDI]-based automated radar terminal systems for initial use in    
   terminal radar approach control facilities and to develop the final     
   system capability. The STARS contract is an exceptionally aggressive    
   contract and one which is heavily dependent on software development     
   notwithstanding the emphasis on COTS/NDI.                               
       Weather systems processor .--The administration has requested       
   $6,200,000 for the weather systems processor program. Funds in fiscal   
   year 1998 would be used to continue limited production activities and to
   establish final production baseline. These processors will provide      
   terminal weather radar capability at those ASR equipped airports that do
   not have terminal doppler weather radars. The Committee continues to be 
   concerned that there are a number of line items in the FAA's facilities 
   and equipment and research, engineering, and development budgets which  
   basically are intended to produce the same solution.                    
      The administration's request includes $1,000,000 to develop          
   specifications and a statement of work for the final production         
   contract. The Committee understands that the FAA does not plan to award 
   the final production contract until fiscal year 2001 and so has reduced 
   $1,000,000 from the request. FAA can defer costs related to the final   
   production contract until fiscal year 1999, which will allow time to    
   identify and resolve problems that may occur with the first eight       
   systems and to decide on whether this technology or another is the best 
   way to provide a weather radar solution at existing airports.           
           Landing and navigational aids programs                                  

       Local area augmentation system [LAAS] for GPS .--The Committee has  
   included $6,500,000 as requested by the administration. These funds will
   support development of the functional specification for LAAS based on   
   the architecture to be selected in fiscal year 1997. Hardware and       
   software fabrication and demonstration will commence to evaluate and    
   validate the functional specification and minimum operational           
   performance standards. As development of this system moves forward, the 
   Committee urges the FAA to give serious consideration to installation of
   early production units at Anchorage and Fairbanks International Airports
   in Alaska, where they will have significant benefits.                   
       Wide area augmentation system [WAAS]. --Despite serious concerns    
   about rising projections of the total cost of the WAAS program and      
   concerns about whether the program is being well managed, the Committee 
   is including the full request for this program but directs that none of 
   the fiscal year 1998 funding is to be obligated until the Secretary     
   reports to the Senate and House Transportation Appropriations           
   Subcommittees on the status and management of the program. Specifically,
   the Secretary should provide a detailed report to the Senate and House  
   Appropriations Committees, including:                                   
      (1) key program milestones and deliverables related to the systems,  
   communications, software, and fielding components of the program and    
   plans for developmental and operational testing of the system during the
   upcoming fiscal year;                                                   
   (2) baseline cost, schedule, and performance goals;                     

   (3) the probability of meeting specified milestones and deliverables;   

      (4) a detailed assessment of the technical risks associated with the 
   major components of the WAAS program and FAA's plans to mitigate those  
   risks; and                                                              
      (5) a certification by the Administrator of the FAA that the fiscal  
   management controls of the prime contractor and its major subcontractors
   meet or exceed accepted U.S. Government standards.                      
      Additionally, FAA shall report quarterly on actual progress made     
   against the baseline cost, schedule, and performance goals, the         
   justification for any deviation from the goals, and the impact of any   
   deviations. Specifically, the FAA shall report:                         
      (1) current cost variances that are 10 percent or more above the     
   baseline goals, reasons for the variances, and corrective actions that  
   have or will be taken;                                                  
      (2) current schedule variances that are 10 percent or more behind the
   baseline schedule, reasons for the variances, and corrective actions    
   that have or will be taken;                                             
      (3) variances in performance goals from the baseline, reasons for the
   variances, and corrective actions that have or will be taken;           
      (4) the effect of corrective actions cited above on the overall      
   program cost, schedule, and performance goals;                          
      (5) an overall progress rating, based on specified criteria, that    
   indicates whether the contractor is meeting cost, schedule, and         
   technical requirements for: the total program, systems, communications, 
   software, fielding, resource management, and program management;        
      (6) description of any modifications to the WAAS cost, schedule, and 
   performance baselines; and                                              
   (7) the status of contractor staffing.                                  

      Not later than March 1, 1998, the Comptroller General shall review   
   the status of the WAAS program and submit to the Senate and House       
   Committees on Appropriations a report on the results of the review. The 
   report shall address the status of cost, schedule, and performance      
   modifications and include a conclusion regarding whether the WAAS       
   program is likely to be successfully carried out within the cost and    
   schedule baseline. Of the funds made available for WAAS in fiscal year  
   1998, the Committee directs that FAA not obligate more than 70 percent  
   until the earlier of April 1, 1998, or the date on which the Senate and 
   House Transportation Appropriations Subcommittees advise the            
   Administrator that the Administrator may obligate the remaining funds.  
   If, after reviewing the Department's reports and the Comptroller        
   General's report, the subcommittees do not have confidence in the       
   progress of the WAAS contract, they may consider directing reprogramming
   of WAAS funds to the air traffic management subactivity to support the  
   center/TRACON automation system, conflict probe, and collaborative      
   decisionmaking programs.                                                
           Research, test, and evaluation equipment and facilities                 

       Infrared heating for aircraft deicing .--The Committee has added    
   $970,000 to demonstrate infrared heating for aircraft deicing at the    
   Rhinelander/Oneida County Airport. This technology has been tested by   
   the FAA, and that test found that its application appears to be a       
   cost-effective alternative to glycol for deicing aircraft and that      
   additional testing is warranted. Infrared heating also offers           
   environmental benefits in that its use will reduce contamination of the 
   watershed from airport runoff. Rhinelander/Oneida County Airport        
   typifies the small commercial airport, and the climate of the region and
   the location of the airport in northern Wisconsin are appropriate for   
   further evaluation of this technology in an operational commercial      
   environment. The Committee believes this project will move us closer to 
   making this advanced safety technology available to pilots, airports,   
   and passengers across the country.                                      
               AIR TRAFFIC CONTROL FACILITIES AND EQUIPMENT              

           En route programs                                                       

       Aeronautical data link [ADL] applications .--The administration is  
   requesting $8,000,000 to continue development of ADL, which will provide
   the infrastructure necessary to allow the exchange of controller-pilot  
   communications and flight information services using digital technology 
   in the en route, terminal, and tower environments. The Committee        
   understands that the FAA has been scaling back ADL requirements to      
   design a more cost-effective and affordable project and is assessing the
   project's remaining requirements. As of April 1997, the FAA had         
   obligated only $1,200,000 of the $17,425,000 that Congress appropriated 
   in fiscal year 1997 and further obligations were pending clarification  
   of the program's direction.                                             
      Because of uncertainty over FAA's priorities and plans for ADL and   
   the time it will take to obligate available funds once requirement      
   decisions are made, the Committee is recommending $4,000,000 for this   
   program in fiscal year 1998, which will allow FAA to spend down         
   available, unobligated balances.                                        
       Air route traffic control center [ARTCC] improvement/plant          
   modernization/space expansion.-- FAA is requesting $98,551,700 to       
   perform needed modernization and expansion at its ARTCC's to accommodate
   new equipment that will modernize controller displays and communications
   systems. The Committee has provided the full request.                   
       Honolulu CERAP .--For the relocation of the Honolulu Combined Center
   radar approach control [CERAP], the Committee has included $12,100,000. 
   The FAA has made the determination to relocate the CERAP to the Honolulu
   air traffic control tower/terminal radar approach control at the        
   Honolulu International Airport. According to the FAA, the design and    
   construction of the new facility will be completed in July 1999. After  
   construction of the new facility, it will take approximately 1 year to  
   install and test the communications and radar equipment and an          
   additional 6 months to train the controllers. The CERAP at Honolulu     
   International Airport is scheduled to be operational on January 1, 2001.
   The Committee has supported this relocation effort in the past and      
   expects the FAA to meet its January 1, 2001, deadline. Any further delay
   of this relocation project is unacceptable to the Committee.            
       Remote communications facilities [RCF's]--expand/create .--RCF's    
   enable pilots to communicate with air traffic controllers and flight    
   service stations in areas where normal radio communications are not     
   possible. The administration requested $1,440,000 to expand or relocate 
   five existing RCF's. The Committee has added $1,700,000 to establish new
   remote communication outlets in five Alaska sites where air/ground      
   communications are nonexistent and aviation safety is threatened.       
       Low density radio communications link .--Congress enacted           
   legislation that has resulted in the sale of aeronautical radio spectrum
   used for operation of FAA long-range radars and FAA microwave radio     
   communications links. As a result of these sales, FAA must relinquish   
   operation of some of its communication and radar systems effective      
   January 1, 1999. FAA is the largest single Government user of radio     
   spectrum, and each frequency assignment supports safety, capacity, and  
   efficiency. Therefore, the loss of such spectrum required for existing  
   and future airspace operations could have serious impacts on the        
   aviation traffic services provided. The fiscal year 1998 request of     
   $29,840,000 is to continue conversion of FAA communication facilities to
   higher frequencies.                                                     
      The Committee understands that about $10,000,000 of the request is to
   install filters on long-range radars and that, of this amount, FAA plans
   to obligate about $4,000,000 during fiscal year 1998 to install filters 
   on newer radars and $6,000,000 on older radars. Before that can occur,  
   however, the Committee understands that FAA has to do prototype work to 
   develop the filters that can work on these radars and that work is      
   expected to take through July 1998. A contract for filter installation  
   will likely not be awarded until about February 1999. Therefore, the    
   Committee has reduced the request by $6,000,000 for filter installation 
   that can be deferred until fiscal year 1999.                            
       Volcano monitor .--The Committee has included an additional         
   $2,000,000 for the Alaska Volcano Observatory for equipment and data    
   transmission facilities on suspect volcanoes across the Alaska peninsula
   and the Aleutian Islands. The Committee urges the FAA to incorporate    
   this item in its future budget requests.                                
           Terminal programs                                                       

       Terminal doppler weather radar [TDWR] .--The administration is      
   requesting $4,800,000 to complete implementation activities for three   
   TDWR systems that are currently in storage. Of the request, about       
   $3,800,000 is for land acquisition, facility construction, equipment    
   installation and checkout, and other site activities associated with the
   San Juan, Chicago-Midway, and New York systems. The Committee           
   understands that FAA is considering shifting the planned system from    
   Chicago-Midway to Colorado Springs (in which case, the existing system  
   at Chicago O'Hare will provide coverage for Chicago-Midway) and that FAA
   does not expect to have a final environmental impact statement for the  
   proposed New York site until December 1997 so that the system is not    
   expected to be operational until late 1999. Because of the uncertainties
   and delays with respect to the Chicago-Midway and New York              
   installations, the Committee is recommending a $2,500,000 reduction in  
   the request. If FAA is able to move forward more quickly, it should have
   unobligated funds available to proceed.                                 
       Terminal automation program .--The administration is requesting     
   $40,000,000 for this subactivity. This includes $37,500,000 to procure  
   five STARS systems and six support systems (STARS central support       
   complex [SCSC] and five operational support facilities [OSF]),          
   $1,000,000 to replace old television microwave link equipment with video
   compression to maintain the integrity of the digital bright radar       
   indicator tower equipment [DBRITE] signal at affected satellite towers, 
   and $1,500,000 for terminal software development implementation.        
      The Committee is very concerned about this important program and     
   whether the FAA can meet the aggressive schedule it has set. The        
   Committee is including the full request in order to provide the FAA the 
   opportunity to demonstrate successful management of this program using  
   the new acquisition authority the Congress provided last year.          
      In April 1997, the Department sought approval to reprogram           
   $10,000,000 in small reductions from a broad range of F&E programs to   
   the terminal automation program in order to have initial production     
   items, including the first site (Boston) and support systems (training  
   and logistics), in place when the STARS software becomes available.     
   Reprogramming was necessary because, as a result of FAA's new           
   acquisition process, the contract was awarded and the software was      
   expected to be available sooner than originally projected. Both the     
   Senate and House Appropriations Subcommittees on Transportation agreed  
   on the reprogramming of the $10,000,000, but, as a result of a          
   disagreement between the subcommittees on another element of the        
   proposed reprogramming, the FAA did not proceed with the reprogramming  
   for the terminal automation program. The Committee regrets FAA's failure
   to reprogram the $10,000,000 when both subcommittees agreed to that     
   reprogramming. If a reprogramming is still necessary, the Committee     
   urges the FAA to reprogram up to $10,000,000 as needed from F&E funds   
   provided for fiscal year 1998 or prior years to the terminal automation 
   system in order to meet the needs of the STARS program.                 
      The Committee stands ready to assist the FAA to resolve problems with
   this program as they are identified and as solutions are proposed. The  
   Committee is not sympathetic with an approach that would fund two       
   simultaneous, alternative approaches in the event one is not successful.
       Terminal air traffic control facilities--replace .--The Committee   
   has included an additional $8,000,000 above the administration's request
   of $62,000,000. The Committee intends $5,000,000 of this increase to be 
   added to $700,000 in the request for a new control tower at North Las   
   Vegas, NV, in order to accelerate this project and $3,000,000 to be used
   for a new control tower at Martin State Airport in Maryland. Martin is a
   reliever airport for Baltimore-Washington International Airport with    
   growing traffic, and its present tower is almost 50 years old.          
       Airport traffic control tower [ATCT]/TRACON facilities--improve     
   .--The administration is requesting $18,631,115 to upgrade and improve  
   various terminal facilities and equipment on a continuing basis to      
   provide an acceptable level of safe service and to meet current and     
   future operational requirements. As of March 31, 1997, ATCT/TRACON      
   facilities improvement had $36,100,000 in unobligated balances. The     
   Committee understands that FAA plans to obligate only $23,200,000 of    
   that amount through the end of fiscal year 1998 and to obligate only    
   $4,800,000 of the requested $18,631,115 in fiscal year 1998. Therefore, 
   the Committee is recommending no new funding for this program in fiscal 
   year 1998. FAA should have ample funds from previous years.             
      Within the amounts available for obligation, the Committee urges the 
   FAA to seriously consider installation of an upgraded 360-degree air    
   traffic control simulator at Chicago's O'Hare Airport. The existing     
   135-degree simulator is ill-equipped to handle the training needed for  
   the new traffic control tower and, as a result, air traffic controllers 
   are training on the job, increasing the chance for distractions to      
   operating controllers and delays to the flying public.                  
       Terminal voice switch replacement/enhancement .--The Committee has  
   reduced the requested funding for this program by $8,300,000. The       
   administration's request of $9,940,000 includes $8,300,000 to procure 16
   enhanced terminal voice switches [ETVS]. The Committee is recommending a
   reduction of $8,300,000 because it understands that it will be at least 
   July 1997 before FAA completes acceptance testing of the ETVS and FAA   
   already has funding for the first 100 such switches. If the manufacturer
   continues to meet its scheduled milestones, FAA can use prior-year      
   unobligated funds to continue this effort.                              
      The Committee urges the FAA to replace the outdated communications   
   system at Charlotte-Douglas Airport in North Carolina with the rapid    
   deployment voice switch [RDVS], rather than the untested ETVS, as       
   quickly as possible.                                                    
       New Austin Airport at Bergstrom .--The city of Austin, TX, is       
   constructing a new air carrier airport at the former Bergstrom Air Force
   Base, which was closed on September 30, 1993. The administration is     
   requesting $3,700,000 in fiscal year 1998 to complete the establishment 
   of communications facilities, approach/landing aids, the weather sensor 
   processor, and to relocate radar and navigation equipment. The Committee
   is recommending no new funding for this program in fiscal year 1998     
   because it understands that FAA's spending plan for funds that have     
   already been appropriated leave approximately $14,400,000 at the end of 
   fiscal year 1998, much more than the requested new funding.             
       Potomac TRACON .--The Committee has provided $2,600,000 for the     
   Potomac TRACON. The Committee believes that the administration's request
   is sufficient to meet proposed program initiatives for the Potomac      
   TRACON.                                                                 
       Tower automation program .--In today's airport traffic control      
   towers [ATCT], there is a proliferation of locally procured information 
   display systems [IDS]. These systems provide airport weather and        
   environmental information to controllers. These systems also exchange   
   airport information with airport management, air carriers, and the      
   National Weather Service. The existing IDS must be maintained and       
   brought under configuration control in such a way that they can be      
   sustained as a national program. The administration is requesting       
   $2,000,000 in fiscal year 1998 to initiate actions to bring the existing
   IDS systems under configuration control as a national program and       
   establish a maintenance program for the existing IDS systems.           
      The Committee is concerned that FAA has yet to identify the program  
   office to be responsible for implementing the IDS program or to develop 
   a schedule baseline for the program. Moreover, the Committee understands
   that, after investing $142,800,000 in the tower automation program over 
   the past 15 years, the FAA decided in February 1997 to end the program  
   because the agency viewed the program as a low priority. As a result,   
   FAA has little to show for this multimillion-dollar effort.             
      The Committee does not intend to provide additional funds for this   
   program until the FAA develops a sound plan. If the FAA is ready to     
   proceed in fiscal year 1998, it is the Committee's understanding that it
   should have sufficient unobligated funds from previous years to         
   undertake the planned activities.                                       
       NAS infrastructure management systems [NIMS] .--The administration  
   is requesting $26,750,000 to provide the next generation of tools,      
   services, and operational philosophies that govern the management,      
   operation, and maintenance of the NAS infrastructure. The Committee     
   recommends a reduction of $1,400,000 from the request based on its      
   understanding that FAA has revised its estimated needs in fiscal year   
   1998 for wireless communications downward by that amount.               
      The Committee is concerned that, even after revising its estimated   
   needs, the FAA is assuming what appear to be very high unit costs for   
   wireless communication devices--specifically, $400 per pager, $917 per  
   cell phone, and $4,650 per satellite phone. The Committee directs the   
   Administrator to provide a justification to the Committee by August 30, 
   1997, for the unit costs it is assuming for these devices.              
       Airport surveillance radar [ASR 9] .--The Committee is including    
   $23,700,000, as requested by the administration. Within the funds       
   available, the Committee urges the FAA to give serious consideration to 
   installation of an additional ASR 9 radar at Salt Lake City             
   International Airport. The current system is inhibited by the           
   surrounding 10,000- to 12,000-foot mountains. As a result, aircraft     
   approaching from the south are not seen until they are essentially on   
   the boundary that separates approach control airspace and Salt Lake City
   Center airspace. This creates problems with approach controllers'       
   ability to gauge how much traffic is coming from the south to blend it  
   with the traffic arriving from the north.                               
       Terminal communications improvements .--The administration is       
   requesting $2,189,002 for this program in fiscal year 1998. The         
   Committee recommends no new funding in view of the large amount of      
   unobligated funds remaining from prior years.                           
           Flight service programs                                                 

       Automated surface observing system [ASOS] .--The Committee has      
   provided $24,850,000 for ASOS, $10,000,000 more than the                
   administration's request.                                               
      The Committee intends that the requested $14,850,000 will be used to 
   continue commissioning systems procured through fiscal year 1996 and for
   related program management costs and the additional $10,000,000 will be 
   used to procure 50 new ASOS units.                                      
      Last year, the Committee discovered that FAA did not adequately fund 
   the program for several years. Funding was not provided for connectivity
   lines, controller equipment, or operation and maintenance funds. That   
   oversight has left the FAA short of assets to fund ASOS systems for     
   nontowered airports. The FAA, the National Transportation Safety Board  
   [NTSB], and user aviation associations have identified over 200 sites   
   which should be equipped with ASOS.                                     
      While the FAA works through previously identified problems, the ASOS 
   manufacturing line must remain in operation. If the assembly line shuts 
   down, it will be difficult to restructure the manufacturing team in the 
   future. The facts relevant to ASOS demonstrate that there is a          
   requirement for more than 200 units.                                    
      The Committee urges the FAA to install one of these new ASOS units at
   Mitchell Airport in South Dakota to replace an aged AWOS at that        
   airport, which has exceeded it design life.                             
           Landing and navigational aids program                                   


PAGE 1 PAGE 3