H.R. 4328, FY 1999 Department of Transporation Appropriations Act (Report)
(continued)
Air traffic management. --The recommendation provides $29,403,300 for this program, a reduction of $15,196,700 below the budget estimate. The Committee believes a slower pace is appropriate for the TFM infrastructure project, given the need to fund higher priority programs. Last year, the Committee recommended zero for this project. Terminal doppler weather radar (TDWR). --The Committee remains concerned that FAA has not installed a TDWR system or otherwise provided adequate windshear protection for the New York City metropolitan area. The Committee understands that the record of decision for the proposed TDWR at the former Brooklyn Coast Guard Air Station is expected this autumn, and that the system could be commissioned six to eight months after that decision. The Committee has watched year after year of delay go by in this program, and insists that FAA adhere to this schedule. Dallas/Fort Worth radar displays. --The Committee is aware that, because of the volume of air traffic in the terminal airspace around the Dallas/Fort Worth (DFW) metropolitan area, there is a significant problem of ``data tag overlap''. The data tags are displays of information provided to controllers. When a large number of aircraft are being displayed in a confined area, the data tags overlap and cannot be read easily. Vital aircraft information becomes obscured and very difficult to read by air traffic controllers. The Committee is aware that FAA is considering the possibility of including Dallas/Fort Worth in the STARS early deployment capability, and received funds in fiscal year 1998 for that effort. The Committee strongly encourages the FAA to analyze this potential safety issue and address the deficiency as soon as possible. Terminal automation. --The Committee recommends $121,600,000 for acquisition of standard terminal automation replacement system (STARS) workstations, which is 90 percent of the $135,300,000 requested. When combined with funds provided for engineering development, the total amount in the bill for the STARS program is $196,300,000, or 93.5 percent of the amount requested. This makes STARS the largest single item in FAA's capital budget for fiscal year 1999. The reduction of $13,700,000 represents costs for the last 4 of the 17 STARS systems in the 1999 budget, as well as a pro rate share of the implementation and maintenance costs associated with those systems. The Committee notes that FAA is now estimating a six month delay in implementation at virtually all STARS sites due to development problems and cost growth. The Committee believes that procurement should proceed at a slower pace until the development problems are resolved. The Committee remains very supportive of this program, especially the early display capability, and hopes the agency can meet its current March 1999 implementation schedule. Low cost ASDE technologies. --The Committee continues to support FAA's development of low cost airport surface detection equipment (ASDE) systems, especially given the heightened importance of reducing runway incursions. The Committee encourages FAA to make a near-term decision among competing technologies in order to field this advanced technology as soon as possible, and to include funding in future budget requests to develop and implement low cost ASDE systems. The Committee is especially pleased with the results of recent testing of phased array radar technology at Norfolk International Airport in Virginia. Terminal air traffic control facilities replacement. --The Committee recommends $58,725,000 for this program, a reduction of $23,575,000 from the budget estimate. Changes to the budget estimate are as follows: Location Fiscal year 1999 budget Committee recommended Change to request Port Columbus, OH $50,000 $750,000 +$700,000 Newark, NJ 14,275,000 --- -14,275,000 LaGuardia, NY 10,000,000 --- -10,000,000 -------------------------- ------------------------ ------------------- Total -23,575,000 Port Columbus, OH. --The Committee believes that design work for this new tower should be accelerated, and therefore provides the full amount needed for that work. Newark, NJ .--The President's budget request assumed the reprogramming of previously provided funds during fiscal year 1998. However, those funds were not reprogrammed. Therefore, these fiscal year 1999 funds are no longer needed. LaGuardia, NY. --FAA estimates that the commissioning for this new control tower will not occur for almost four years. Given this, and the fact that FAA is still performing site studies, the Committee believes that $10,000,000 for construction is premature. New Castle County Airport, Delaware. --The Committee understands that FAA has suggested the sponsor of the New Castle County Airport in Delaware should finance not only the cost to design and construct a new control tower at that airport, but also approximately $2,300,000 for FAA's overhead, equipment and administrative costs to oversee the project. In addition, the FAA has suggested that the sponsor should reimburse the agency approximately $1,000,000 for overhead costs related to relocation of the FAA's VHF omni-directional range (VOR) at the airport, even though the current lease indicates the FAA should bear the costs. While the Committee is aware that the FAA has budget difficulties, it is clear that these ``soft'' costs are the agency's responsibility. The Committee directs the FAA to assume these costs at New Castle County Airport, which are estimated at approximately $3,300,000. The Committee believes that, when an airport sponsor is willing to finance the significant cost of constructing a control tower for the FAA, the agency should not impose additional overhead costs on that sponsor. Terminal voice switch replacement/enhanced terminal voice switch.-- The Committee recommends $9,000,000 a large increase over the $1,640,000 provided for fiscal year 1998 but less than the $11,500,000 requested. The reduction is due to budget constraints, and is without prejudice to the overall program. The Committee is concerned about the continuing delays in the TVSR program, which is several years behind the original schedule. Given the large increase in funding over fiscal year 1998, the Committee believes funds are sufficient to continue both of the existing production sources during fiscal year 1999, and the Committee encourages FAA to continue both sources in order to maintain competition in this program. Chicago tracon. --According to the budget justifications, these funds are needed ``to resolve environmental or airspace issues that arise as a result of rerouting air traffic * * * and to resolve community concerns through final airspace simulations and modeling''. The Committee believes that such projects can be funded out of the operating account since they apparently do not involve justification for construction of a new facility. The Committee recommends no funding for this work, a reduction of $500,000 from the budget estimate. Northern California metroplex. --The Committee recommends $21,700,000 for this project, the same amount as last year. The budget estimate included $27,600,000. NAS infrastructure management system (NIMS). --The recommendation holds funding for this program to the fiscal year 1998 level due to budget constraints. This results in a reduction of $4,000,000 from the budget estimate. ASR 9.-- The proposed reduction of $3,800,000 would delete funds for a system upgrade. The Committee is not certain that upgrading this system is a high priority, given development of the new digital radar, ASR 11. Terminal facilities integration. --The Committee is unclear about the specific purpose of this small program, and is concerned that it may duplicate integration work budgeted in the individual program budgets. The recommendation defers the $5,600,000 requested until the program is more fully justified. Terminal digital radar (ASR 11). --The Committee recommends $62,200,000 for the ASR 11 program, a reduction of $3,900,000 from the budget estimate. Since submission of the budget, the schedule for the STARS deployment program has slipped approximately six months, according to FAA program officials. Since this program is paced by the STARS implementation schedule, a portion of this work will not be needed until the following fiscal year. Weather systems processor. --The recommended reduction of $2,900,000 would delete funds to upgrade the five limited production units. FAA does not plan to award the base contract until September 1998. It seems premature to the Committee to budget for upgrades to systems which haven't even been procured or produced yet. The reduction is without prejudice. OASIS. --The Committee recommends $22,500,000, a reduction of $3,000,000 from the budget estimate. Funding of $3,900,000 was provided in fiscal year 1998. The reduction is due to budget constraints and is without prejudice. The Committee continues to support the need for this program. Automated weather observing system (AWOS). --The Committee has considered requests this year to fund weather observing systems at the FAA, including the automated weather observing system (AWOS) and the advanced surface observation system (ASOS). Although these are meritorious systems, the Committee bill does not include funds above the budget request for either system due to budget constraints. However, the Committee notes that the Senate-reported bill does include additional funds for the ASOS system. While the Committee is declining to fund either system above the budget request at this time, it is the Committee's strong position that, if additional funding is provided in final conference action later this year for either of these systems, an equitable distribution of additional funds must be provided for both. Flight service station modernization. --In the original President's budget request, the FAA requested $2,000,000 for this program. However, in a budget amendment submitted on June 4, 1998, the agency recommended reducing the program to $1,000,000 to provide additional funds for the free flight phase one program. The Committee notes that there are few items in the F&E program which are of direct benefit to the general aviation community, and this is one of them. The recommendation keeps funding at the original request, an addition of $1,000,000 to the amended request. VOR/DME/TACAN. --An additional $3,000,000 is recommended specifically for the FAA to relocate and elevate the current VORTAC facility in Vernon Hills, Illinois. In addition, $700,000 is to replace or repair the VOR in Gainesville, Florida, which was recently damaged by floods. Instrument landing systems, establish. --The Committee recommends $16,500,000 for this program and expects that funds will be distributed as follows: Installation of previously-procured systems $7,800,000 Fresno International Airport, CA: upgrade category I ILS to category II 3,500,000 Stanly County Airport, NC: ILS obstruction zone, aeronautical easement 1,000,000 Everett-Stewart Airport, TN-ILS and DME 200,000 Zanesville Airport, OH: ILS 300,000 March Airfield, CA: upgrade category I ILS to category II 3,700,000 ------------ Total 16,500,000 Fresno International Airport. --The Committee bill makes $3,500,000 available for the FAA to upgrade the Fresno Yosemite International Airport's current category I instrument landing system to a category II ILS/GPS system. This airport is constantly subjected to a phenomenon known as ``Tule fog'' during early and late winter months. Tule fog levels are often at approximately 150 feet above ground level, which does not permit aircraft operations using category I ILS. As a result, shippers and airlines are often forced to delay or cancel services, which causes them to incur substantial losses. The upgrade to a category II system will permit aircraft to land with 100 feet of visibility, and would go far towards remedying this situation. March Airfield. --The bill includes $3,700,000 to upgrade the lighting and navigational aids of this airfield to achieve a category II landing capability. This includes $1,000,000 for mark 20 localizer and glideslope equipment; $850,000 for an approach lighting system with sequential flashing lights (ALSF); $800,000 for centerline lighting and touchdown zone equipment; and $1,050,000 for other associated project costs. Navigation and landing aids, improvement. --The small reduction of $761,700 is due to budget constraints. The Committee recommendation is $2,000,000 for this program. Approach lighting system improvement. --The recommended increase of $5,000,000 is intended for the additional procurement of approach lighting system-flashing (ALSF) 4 equipment. Precision approach path indicators. --The recommended increase of $3,000,000 is for FAA to procure additional precision approach path indicator (PAPI) lighting systems. Funding of $3,500,000 was provided for this purpose in fiscal year 1998. Radar outages, Kansas City. --The Committee encourages the FAA to continue working with federal, state, and local officials and air traffic controllers to resolve recent radar outage problems at the Kansas City International Airport and the Kansas City air route traffic control center. The recent visit by the FAA administrator and a GAO audit requested by Congress make the Committee hopeful that a solution to these problems will be found quickly. PROCUREMENT OF NON-ATC FACILITIES AND EQUIPMENT The Committee recommends $183,800,000 for the acquisition of non-air traffic control facilities and equipment, an increase of $113,151,000 (160.2 percent) above the level enacted for fiscal year 1998 and $9,000,000 more than the President's budget estimate. Explosive detection systems (EDS). --The Committee bill includes the $100,000,000 requested for procurement of additional explosive detection systems. However, the Committee is troubled by a recent report and Congressional testimony of the Office of Inspector General, which found that the existing machines are being severely underutilized, and that the commercial airlines have not budgeted for the continuing operation and maintenance of the systems. The Committee would point out that, although the Federal Government has long been involved in developing and (recently) acquiring these machines, the underlying responsibility has always been--and remains today--that of the airlines. Ensuring that an aircraft and its passengers are safe from explosives is the legal responsibility of the commercial air carriers. Although the Federal Government can and will assist the airlines in this area, the Committee does not accept that by providing such funds for a short period of time the government is assuming this new role. By contrast, the Committee believes the airlines should want the additional security afforded by these new systems, and believes that airline passengers welcome those improvements as well. Although the bill includes funds to continue this program, the Committee believes it is necessary to include provisions in the bill which prohibit the obligation of any funds for additional bulk explosive detection systems until thirty days after the FAA administrator certifies, in writing, that the major air carriers responsible for providing airport security agree to: (a) begin assuming the operations and maintenance costs of such machines beginning in fiscal year 1999; and (b) substantially increase the usage of such machines. The Committee also requests the Inspector General to review this certification and provide an independent view to the Congress. Information security. --The Committee recommends $7,000,000 for this area in fiscal year 1999, an increase of $5,000,000 above the budget request. The Committee believes this is an important area of concern which requires a higher level of attention and more budgetary resources. DSR training simulator. --The bill includes $4,000,000 for the Mid-America Aviation Resource Consortium to continue procurement of a display system replacement (DSR) air traffic control simulator compatible with new DSR systems now being installed in en route centers nationwide. The same amount was provided in fiscal year 1998. This new DSR training simulation system at MARC will enable new controllers to be trained to operate the DSR system when it becomes fully operational in ARTCCs across the nation in the year 2000. MISSION SUPPORT The recommendation provides $263,043,200 for mission support activities. Funding of $288,960,000 was provided in fiscal year 1998. Adjustments to the budget estimate are explained below. Resource tracking program. --This small project was reduced in the budget amendment from $1,000,000 to $500,000. Given the increasing importance of cost accounting and performance measurement to the agency, the Committee believes this small reduction should be restored. Funding of $1,000,000 is recommended. Center for advanced aviation systems development (CAASD). --The Committee believes the request for CAASD contract is inadequate, given the increased demands on the organization over the past year. The budget request would result in a 12 percent reduction in technical staffing. The Committee appreciates the work of CAASD in support and oversight of FAA programs, and recommends an increase of $7,093,200. This should allow CAASD to retain approximately the current level of staffing. The Committee also directs CAASD not to take on work in the URET project, or in other projects, which is programmatic in nature. This includes such work as software development or documentation; processing of software changes; and assistance in ``evolutionary development'' activities for individual programs. CAASD discontinued such work several years ago at the request of the Committee, and now focuses on higher-level analyses which are of higher priority to the agency and which utilize more fully their specific expertise and unique relationship with the agency. The Committee is also very supportive of CAASD's recent assistance in the financial planning area, and encourages the organization to continue and expand this work, especially in long-range planning and conceptualization for the operations budget. Year 2000 computer issues. --The Committee recommends $21,600,000 for this program, a reduction of $14,440,000 from the budget estimate. The bill assumes that the balance of required funding will be made available from a supplemental appropriation to be addressed later in the year. Also, Congress recently provided $25,000,000 for this purpose in a fiscal year 1998 supplemental appropriations Act. PERSONNEL AND RELATED EXPENSES The recommendation provides $250,650,000, an increase of $17,440,000 above the budget estimate. The increase, as previously explained under FAA ``Operations'', involves a transfer of funding for certain acquisition program offices from the operating account to this appropriation. RESEARCH, ENGINEERING, AND DEVELOPMENT (Airport And Airway Trust Fund) Appropriation, fiscal year 1998 $199,183,000 Budget estimate, fiscal year 1999 290,000,000 Recommended in the bill 145,000,000 xlBill compared with: Appropriation, fiscal year 1998 -54,183,000 Budget estimate, fiscal year 1999 -145,000,000 This appropriation provides funding for long-term research, engineering and development programs to improve the air traffic control system and to increase its safety and capacity to meet air traffic demands of the future, as authorized by the Airport and Airway Improvement Act and the Federal Aviation Act. The appropriation also finances the research, engineering and development needed to establish or modify federal air regulations. Committee Recommendation The Committee recommends $145,000,000, a reduction of $145,000,000 below the President's budget request and $54,183,000 below the fiscal year 1998 enacted level. Most of the reduction (93.7 percent) is accounted for by a deferral of the flight 2000 project (-$90,000,000) and a transfer of certain activities to the ``Facilities and equipment'' appropriation (-$45,857,000) which has been previously explained in an earlier section of this report. While still the safest airway system in the world, aviation accidents in this country in 1994 and 1996 highlight the need for more rapid implementation of advanced safety technologies, especially those related to forecasting and detection of hazardous weather conditions such as windshear, safety monitoring and oversight technologies, and aircraft technologies. The high percentage of accidents and incidents due to human error, deicing, and other hazardous weather problems call for sustained, high priority research programs to address these issues. In some cases, these priorities have necessitated reductions in other research programs. Reprogramming actions. --According to a recent IG report, the FAA made several funding changes in its execution of the fiscal year 1998 appropriation about which the Committee should have been advised. In system development and infrastructure, for example, Congress reduced the request by $1,700,000. However, the FAA put back $542,000 (32 percent) of this amount internally. The agency also increased airport technology funding by 25 percent above the approved level. Congress raised funding for aircraft safety technology by $10,210,000--and the FAA reprogrammed 24 percent of this amount to their own priorities. The Committee does not make its recommendations lightly, and is therefore quite concerned about the agency substituting its priorities for those of the Congress. The Committee intends to monitor this very closely during fiscal year 1999, and will consider placing all amounts directly in the bill in future years if Congressional allocations are not more closely followed. A table showing the fiscal year 1998 enacted level, the fiscal year 1999 budget estimate, and the Committee recommendation follows: Offset Folios 73 Insert here System Development and Infrastructure The recommended level is $12,775,000 for system development and infrastructure, a reduction of $1,879,000 (12.8 percent) below the fiscal year 1998 enacted level. System planning and resource management. --The recommendation provides $1,164,000, the same as the fiscal year 1998 enacted level. Technical laboratory facility. --The recommendation allocates $6,721,000, a reduction of $1,318,000 below the level provided in fiscal year 1998. The reduction is necessary to fund higher priority activities in weather and human factors research. Weather Research The Committee recommendation includes $15,284,000 for research to reduce aviation hazards of dangerous weather, the same level as enacted for fiscal year 1998 and $3,000,000 (24.4 percent) above the budget request. A comparison of the Committee recommendation to the fiscal year 1998 enacted level and the President's budget request is as follows: Project FY 1998 enacted FY 1999 budget Commttee recommendation National laboratory program $8,367,000 $9,118,000 $9,118,000 Project Socrates 3,000,000 3,000,000 Juneau windshear research 3,500,000 Center for Wind, Ice and Fog 500,000 (\1\) (\1\) Research operations 1,466,000 1,007,000 1,043,000 In-house personnel 800,000 848,000 848,000 Program office support 567,000 600,000 600,000 Technical center support 400,000 475,000 475,000 Cost benefit analysis 200,000 200,000 200,000 Adjustment --- 36,000 --- ----------------- ---------------- -------------------------- Total 15,300,000 12,284,000 15,284,000 \1\Included under the national laboratory program. Within the funds provided, $3,000,000 is to continue development of the windshear protection technology known as Project Socrates. This is the same level provided for fiscal year 1998. In addition, the bill includes language stipulating that no less than $9,118,000 may be utilized for the National Laboratory Program, which is the level assumed in the budget request. The Committee continues to strongly support this work, which is coordinated by the National Center for Atmospheric Research (NCAR) and performed jointly by several universities, federal laboratories, and non-profit organizations prominent in the field of weather research. The Committee wishes to ensure that the appropriation for this work is not reprogrammed to other activities. The FAA is encouraged to continue the involvement of the Center for Wind, Ice and Fog at Mount Washington Observatory in New Hampshire under this program. The Committee believes that FAA is not showing the necessary leadership or effectively managing its weather research and technology development programs, a finding supported by a recent GAO report. The Committee has, for many years, strongly encouraged FAA to raise the priority of weather programs in the budget and to reorganize in a fashion which can provide strong leadership. The Committee directs the FAA to establish an integrated product team for weather programs and place in under the current ``communications, navigation, and surveillance'' organization. AIRPORT TECHNOLOGY The Committee recommends $7,215,000, $168,000 below the budget estimate and $2,215,000 (44.3 percent) above the $5,000,000 provided last year. These activities include runway pavement research and other research into civil engineering improvements at the nation's airports. AIRCRAFT SAFETY TECHNOLOGY Overall, the Committee recommends $34,886,000, the same as the budget estimate. Propulsion and fuel systems. --The Committee understands that the FAA received a proposal under Propulsion Systems research to address inappropriate crew response to engine malfunction. Better engine models would be developed for flight simulator upgrades that permit the airlines to enhance their line-oriented flight training (LOFT) programs required by the FAA under its advanced qualifications program for air transport pilots. The Committee encourages the FAA to consider this proposal for funding in fiscal year 1998 or 1999. Flight safety/atmospheric hazards research. --Of the $2,619,000 provided, $800,000 is to continue to address the problem of wildlife strikes by aircraft. SYSTEM SECURITY TECHNOLOGY Overall, the Committee recommendation provides $44,225,000, the same as the fiscal year 1998 enacted level. HUMAN FACTORS AND AVIATION MEDICINE The Committee recommendation provides $26,615,000, an increase of $4,386,000 (19.6 percent) above the budget request and approximately the same level as last year. The Committee remains disappointed that, once again this year, the FAA has placed human factors research at or near the bottom of its research priorities, choosing instead to propose increases in the agency's institutional laboratory capabilities, in-house research planning, and other similar activities. Once again this year, the Committee has rearranged those priorities in a manner which will advance aviation safety rather than institutional prerogatives. Air traffic control/airway facilities human factors. --The recommendation provides $10,000,000, an increase of $1,703,000 (20.5 percent) above the budget request and the same level as last year. Of the funds provided, $1,000,000 is for an agency-wide comprehensive survey of air traffic controller personnel, to determine the extent of fatigue among the workforce and the effect of current shift patterns and rotation practices. FAA should also use the additional funding provided to continue and expand the important work done at the Civil Aeromedical Institute (CAMI) regarding fatigue in the controller workforce. Aeromedical research. --The recommendation provides $4,065,000, which is $36,000 above the budget request and $65,000 (1.6 percent) above the level provided last year. The Committee continues to value the work performed in this project and conducted mainly at the Civil Aeromedical Institute in Oklahoma. ENVIRONMENT AND ENERGY The recommendation provides $3,000,000, an increase of $109,000 (3.8 percent) above the level provided last year. This program researches ways to mitigate the impact of airport noise around the country. The budget proposed $3,391,000, an increase of 17.3 percent. INNOVATIVE AND COOPERATIVE RESEARCH The recommendation provides $1,000,000, which is a reduction of $1,000,000 below the level provided last year. The reduction is needed to fund higher priority activities in safety-related areas, including hazardous weather and human factors research. This program finances the FAA centers of excellence, the FAA fellows program, and other university-based research of long-term interest to aviation. The budget included $2,330,000, an increase of 16.5 percent. GRANTS-IN-AID FOR AIRPORTS (liquidation of contract authorization) (airport and airway trust fund) Liquidation of contract authorization Limitation on obligations Appropriation, fiscal year 1998 $1,700,000,000 ($1,700,000,000) Budget estimate, fiscal year 1999 1,600,000,000 (1,700,000,000) Recommended in the bill 1,600,000,000 (1,800,000,000) xlBill compared with: Appropriation, fiscal year 1998 -100,000,000 (+100,000,000) Budget estimate, fiscal year 1999 --- (+100,000,000) The bill includes a liquidating cash appropriation of $1,600,000,000 for grants-in-aid for airports, authorized by the Airport and Airway Improvement Act of 1982, as amended. This funding provides for liquidation of obligations incurred pursuant to contract authority and annual limitations on obligations for grants-in-aid for airport planning and development, noise compatibility and planning, the military airport program, reliever airports, and other authorized activities. This is the same as the level requested in the President's budget. LIMITATION ON OBLIGATIONS The bill includes a limitation on obligations of $1,800,000,000 for fiscal year 1999. This is $100,000,000 (5.9 percent) above the President's budget request and $100,000,000 above the fiscal year 1998 level. A table showing the distribution of these funds compared to the fiscal year 1998 levels and the President's budget request follows: Project Fiscal year-- 1998 enacted 1999 estimate 1999 recommended Entitlements: $989,114,003 $995,621,560 $1,016,621,560 Small Airport Fund: 111,250,757 113,767,800 113,767,800 Discretionary Set-Asides: 255,920,968 290,610,640 369,610,640 Other Discretionary: 343,714,272 300,000,000 300,000,000 ------------------- ---------------- ------------------ Total limitation \1\1,700,000,000 1,700,000,000 1,800,000,000 \1\Includes cap on noise and military airport set-asides. DISCRETIONARY GRANTS Within the overall obligation limitation in this bill, $669,610,640 is available for discretionary grants to airports. Within the obligation level recommended, the Committee directs that priority be given to grant applications involving further development of the following airports: State Airport (project) Alabama Isbell Field Municipal Airport (runway extension); Huntsville International (security system). California San Bernardino International Airport; Gnoss Field (runway extension); Stockton Metropolitan Airport (runway extension); March Airfield (refueling system conversion); Meadows Field Airport (terminal); Yucca Valley Airport (site study). Florida Orlando International (crossfield taxiways); Miami International. Georgia Peachtree Dekalb Airport (runway protection zone). Illinois Chicago Midway Airport (noise abatement). Indiana Porter County Municipal (runway extension); Griffith/Merrillville Airport (runway reconstruction). Iowa Sioux Gateway Airport. Kansas Kingman Airport (runway rehabilitation). Louisiana New Orleans International (EIS and new runway); New Orleans International (noise abatement); Baton Rouge (reconstruct taxiway ``F''). Maryland Baltimore-Washington International (glycol recovery facilities). Michigan Flint Bishop International (runway rehabilitation); Oakland-Pontiac International (noise abatement); Chippewa County Airport (new runway); Marquette Airport (relocation). Mississippi Belmont-Tishomingo County Airport. New Jersey Newark International. New York Greater Buffalo International (building demolition); Syracuse Hancock International Airport. North Carolina Piedmont Triad International (new runway). Ohio Rickenbacker International; Cleveland Hopkins International (runway expansion). Rhode Island T.F. Green Airport (noise abatement). Texas Cloverfield Airport; Ellington Field. Utah Salt Lake City International. Wisconsin La Crosse Municipal Airport (new runway). Cloverfield Airport, TX. --The Committee is pleased to note that since 1989, the FAA has assisted numerous public and private entities in the planning and development of Cloverfield Airport, a privately-owned, public use, federal reliever airport to the commercial air carrier facility, Houston Hobby Airport. The FAA has helped fund Cloverfield's feasibility study, airport master plan, site analysis and environmental assessment study. The FAA has also recognized the airport's importance by choosing it as a site for the doppler weather radar system and by making it one of the few general aviation facilities with a GPS weather station. Cloverfield is also home to the helicopter emergency evacuation service for Hermann Hospital Life Flight that serves the entire Houston Medical Center region. Cloverfield, a 57-year-old facility, is now ready to undertake the safety improvements and airfield upgrades that have been designated in the FAA-approved layout plan. The airport recently submitted a grant application to the FAA's Airport Improvement Program for funding to widen, reconstruct, and strengthen the existing runway and construct parallel taxiway ``A''. The Committee considers these to be worthy projects that will provide significant safety benefits to Cloverfield Airport and its users, and urges the FAA to move forward expeditiously to fund these improvements in fiscal year 1999. The Committee also encourages the FAA to provide this funding directly to Cloverfield Airport. Stockton Metropolitan Airport, CA.-- The Committee wants to express continued support for AIP funding for the Stockton Metropolitan Airport, so that the airport can lengthen the runway. The Committee supported this project last year, but the FAA has not funded the project to date. Currently, the runway at Stockton is insufficient to handle wide-body cargo aircraft that are necessary to ship fresh produce overseas. The runway extension is vital to the export viability of California argricultural products. Furthermore, the AIP funding is necessary to prevent further deterioration of the runway. The application for AIP funding has the support of local officials. To assist their efforts, the Committee encourages FAA to fund the runway extension at Stockton Airport this year. Ellington Field, Houston, TX.-- Ellington Field in Houston, Texas is currently being considered for readmission into the military airport program (MAP). Ellington was a military facility for many years, and was in considerable disrepair when transferred to the City of Houston in 1984. Ellington Field has remained a joint use facility, with continued federal use and partial ownership. NASA, the Coast Guard, and the National Guard are all active at the airport. In addition, it is a general aviation airport, serves as a designated reliever, and is drawing considerable interest as an economic development site. However, the rehabilitation that was necessary could not be completed during Ellington's initial participation in MAP. The Committee recognizes that the backlog of work remaining from Ellington's military days is a significant problem and an impediment to the airport's ability to emerge as a self-supporting facility and a generator of substantial economic growth in the area. The Committee believes that Ellington Field presents exactly the kind of transition situation that MAP was created to assist, and encourages the FAA to approve the City of Houston's application for readmission into the MAP program. New Orleans International Airport, LA.-- The Committee encourages the FAA to consider signing a letter of intent for major capacity enhancement projects and the related environmental impact statement at New Orleans International Airport in Louisiana. In addition, the FAA should give priority consideration to purchase the property in priority six as part of the noise mitigation buyout program at this airport. Priority six is outside the 75 LDN area; however, the area has been adversely affected sufficient to warrant purhasing non-compatible property to maintain the integrity of the neighborhood. Flint Bishop International Airport, MI.-- The Committee urges the FAA to give priority consideration to a request for discretionary funding for runway rehabilitation and new construction at the Flint Bishop International Airport in Michigan. Oakland-Pontiac International Airport, MI .--The Committee encourages the FAA to give priority consideration to a request for discretionary funding for Oakland-Pontiac International Airport property acquisition in the west runway protection zone to enhance airport safety and to help relocate residents living in the noise zone. Buffalo Airport Center, NY .--The Committee encourages the FAA to give priority consideration to a request for discretionary funding for airside safety-related building acquisition and demolition activities at the Buffalo Airport Center in New York. Huntsville International Airport, AL .--The Committee understands that Huntsville International Airport has submitted an application to the FAA to fund the design and construction of an airport security system and control center. The Subcommittee recognizes the need for this airport security system and control center and urges the FAA to fund these projects. Gnoss Field, Marin County, CA .--The Committee urges the FAA Administrator to give priority consideration to a request for discretionary funding for the extension of the runway to 4,500 feet in order to increase the operating safety for all aircraft using Gnoss Field. T.F. Green Airport, RI .--The Committee urges the FAA Administrator to give priority consideration to a request for discretionary funding for noise mitigation projects at T.F. Green Airport in Rhode Island. Chippewa County Airport, MI .--The Committee urges the FAA Administrator to give priority consideration to a request for discretionary funding for the design and construction of a crosswind runway at Chippewa County Airport near Kincheloe, Michigan. The Committee understands that a feasibility study has determined that a new crosswind runway is vital to continue safe flight operations at the airport. Cleveland Hopkins International Airport, Cleveland, OH .--The Committee urges the FAA Administrator to give priority consideration to a request for discretionary funding for site and engineering studies for the proposed runway expansion at the Cleveland Hopkins International Airport. La Crosse Municipal Airport, WI .--The Committee urges the FAA Administrator to give a high priority to awarding discretionary funds for reconstruction of the airport runway and repair of the approach lighting system towers at La Crosse Municipal Airport in La Crosse, Wisconsin. Miami International Airport, Miami, FL .--The Committee recognizes the need for capacity enhancements at Miami International Airport and urges the FAA Administrator to take steps to award discretionary funding for the fourth runway, including issuing a record of decision by October 1998 and entering into a three-year $104.3 million letter of intent with the Miami-Dade Aviation Department. Peachtree DeKalb Airport, GA .--The Committee urges the FAA Administrator to give priority consideration to a request for discretionary funding for noise mitigation projects at Peachtree DeKalb Airport, Georgia. Midway Airport, Chicago, IL .--The Committee urges the FAA Administrator to give priority consideration to a request for discretionary funding for noise abatement projects at Midway Airport, Chicago, Illinois. Marquette Airport, MI .--The Committee recognizes the benefits of relocating the Marquette Airport to the former Air Force Base, K.I. Sawyer, and urges the FAA Administrator to give priority consideration to awarding discretionary funding for this purpose. Yucca Valley Airport, CA. --The Committee is concerned with actions taken by the FAA regarding the Yucca Valley Airport in California. Due to the need for a viable general aviation airport in Yucca Valley/Joshua Tree, the Committee expects the FAA to conduct an unbiased site selection study for this area which includes the current airport in Yucca Valley. This is similar to direction provided last year, and the Committee is insistent that the FAA follow these directions. DENVER INTERNATIONAL AIRPORT--NOISE MITIGATION The City and County of Denver, Colorado, as well as many of the surrounding counties affected by noise from the Denver International Airport (DIA), formed the Denver International Airport Study Coordination Group to commission a study on aircraft noise and make recommendations for changes in DIA operations. This study, titled ``A Study of the Noise Impact of aircraft Operation in the Denver, Colorado Area'', has now been completed. The study indicates that changes in flight paths at DIA, Centennial Airport, and Buckley Air National Guard Base could substantially reduce aircraft noise in Front Range areas. The Committee instructs FAA to work with the DIA Study Coordination Group, the DIA noise abatement office, and other affected Colorado communities to identify measures, including changes in flight patterns, which would reduce aircraft noise. In addition to considering average noise levels (particularly in communities with average noise levels over 65 LDN), the FAA shall address the specific noise problems related to single noise events, low background noise, and the higher altitude of Colorado communities. GRANTS-IN-AID FOR AIPORTS (airport and airway trust fund) (rescission of contract authorization) The bill rescinds $5,000,000 in contract authority which is not available for obligation under currently-assumed obligation limitations. This is not expected to effect ongoing airport development programs, and is due to budget constraints. AVIATION INSURANCE REVOLVING FUND Once again this year, the bill continues language authorizing the Secretary of Transportation to make expenditures and investments for aviation insurance activities out of the aviation insurance revolving fund and authorized under chapter 443 of title 49, United States Code, within the limits of funds made available pursuant to 49 U.S.C. 44307. AIRCRAFT PURCHASE LOAN GUARANTEE PROGRAM The bill includes a zero obligation limitation on borrowings during fiscal year 1999 under the aircraft purchases loan guarantee program. This is the same as the budget estimate. ADMINISTRATIVE SERVICES FRANCHISE FUND When this effort was initiated two years ago, Congress made it clear that the program was considered to be on a trial basis, and that cost savings must be demonstrated in the near-term for Congressional support to be maintained. In denying the request originally, this Committee's June 1996 report stated ``should the FAA provide convincing evidence that such an entity will save significant administrative costs, the Committee will consider such proposal in future years''. House conferees agreed to establish the fund later that year, but made clear that this was only on a trial basis, and that efficiencies and cost savings would be monitored closely. When no such savings were identified by mid-1997, the Committee recommended restrictions on the program. However, the restrictions were dropped in conference in lieu of a report detailing cost savings from the program. After eight months, the FAA recently submitted a two-page report which concluded that the agency ``recognized no measurable cost savings in fiscal year 1997 as a result of the franchise fund''. The Committee believes the agency has had ample time to prove the benefit of this fund, and has been unable to do so. Therefore, the bill includes a provision prohibiting the FAA from continuing the Administrative Services Franchise Fund during fiscal year 1999. FEDERAL HIGHWAY ADMINISTRATION The Federal Highway Administration provides financial assistance to the states to construct and improve roads and highways, enforces federal standards related to interstate motor carriers and the highway transport of hazardous materials, and provides technical assistance to other agencies and organizations involved in road building activities. Title 23 and other supporting legislation provide authority for the various activities of the Federal Highway Administration. Funding is provided by contract authority, with program levels established by annual limitations on obligations provided in appropriations Acts. As discussed earlier in this report, the Transportation Equity Act for the 21st Century (TEA21) amended the Budget Enforcement Act to provide two additional discretionary spending categories, one of which is the highway category. This category is comprised of all federal-aid highway funding, motor carrier safety funding, National Highway Traffic Safety Administration (NHTSA) highway safety grant funding and NHTSA highway safety research and development funding. The highway category obligations are capped at $25,883,000,000 and outlays are capped at $21,885,000,000 in fiscal year 1999. If appropriations action forces highway obligations or outlays to exceed these levels, the difference is charged to the nondefense discretionary spending category. In addition, if highway account receipts exceed levels specified in TEA21, automatic adjustments will be made to increase or decrease obligations and outlays for the highway category accordingly. The Committee's recommendation fully comports to and does not exceed the levels guaranteed by TEA21. The following table summarizes the program levels of the various programs within the Federal Highway Administration for fiscal year 1998 enacted, the fiscal year 1999 budget request and the Committee's recommendation: Program 1998 enacted 1999 request 1999 recommended Federal-aid highways $21,500,000,000 $21,500,000,000 $25,511,000,000 Exempt federal-aid programs 1,597,000,000 1,265,000,000 1,211,614,000 Emergency relief program supplemental (259,000,000) Motor carrier safety grants 84,825,000 100,000,000 Appalachian development highway system 300,000,000 State infrastructure banks 150,000,000 Transportation infrastructure credit program 100,000,000 ------------------ ------------------ -------------------- Total 23,481,825,000 23,115,000,000 26,722,614,000 LIMITATION ON GENERAL OPERATING EXPENSES Limitation, fiscal year 1998\1\ ($522,266,000) Budget estimate, fiscal year 1999 (521,883,000) Recommended in the bill (318,733,000) xlBill compared with: Limitation, fiscal year 1998 (-233,533,000) Budget estimate, fiscal year 1999 (-203,150,000) \1\Excludes reductions of $610,000 for TASC. This limitation controls spending for the salaries and expenses of the Federal Highway Administration required to conduct and administer the federal-aid highways programs and most other federal highway programs. In the past, this limitation included a number of contract programs, such as highway research, development and technology; however, the Transportation Equity Act for the 21st Century (TEA21) created a separate limitation for transportation research. Accordingly, in fiscal year 1999 costs related to highway research, development and technology are included under a separate limitation. The Committee recommends a limitation of $318,733,000. This amount is $8,175,000 above comparable amounts provided for fiscal year 1998 and $22,530,000 below the level requested in the budget. The recommendation assumes a reduction from 1998 enacted levels of 78 full time equivalent positions for a total of 3,087. The Committee recommendation includes $52,530,000 for motor carrier safety operations, to be transferred to the National Highway Traffic Safety Administration to carry out the functions of the office of motor carriers. The recommended level assumes the following adjustments to the budget request: Undistributed reduction in GOE administrative expenses -$6,000,000 Defer funding for national differential global positioning system -9,654,000 Delete funding for nationwide personal transportation survey -1,500,000 Delete funding for national rural development program support -500,000 Disapprove transfer to Appalachian Regional Commission -3,000,000 Transportation needs study in the National Parks and federal lands +2,000,000 Undistributed reduction in motor carrier administrative expenses -2,853,000 Undistributed reduction in GOE administrative expenses. --The Committee recommendation includes a reduction of $6,000,000 in administrative expenses and provides FHWA the flexibility to allocate that reduction among such expenses as ADP, permanent change of station, travel, transportation and non-mandatory bonuses and incentives. The Committee's allowance includes sufficient funds for the planned reorganization of the FHWA regional offices and staff, which shall be completed expeditiously and in the manner set forth in the department's reorganization plan outlined to Congress dated February 24, 1998. This includes eliminating nine regional offices, creating four technical resource centers in their place, and giving maximum delegations of authority to the state-level division offices. The FHWA is directed to submit to the House and Senate Committees on Appropriations a detailed implementation plan by September 30, 1998, and to provide periodic reports thereafter. In allocating the available administrative funds, the Administrator shall ensure that expenses related to the reorganization are fully met before distributing funds for lower priority activities such as travel, bonuses, strategic planning, and training. Nationwide differential global positioning system (DGPS). --The Committee has deleted funds requested for the nationwide differential global positioning system (-$9,654,000). Funds appropriated for similar activities last year have yet to be expended as there have been delays in implementing the interagency agreements. Specifically, the Committee has deleted funds an alternative civil frequency for the GPS, known as L5. In terms of transportation needs, the primary benefit of the requested investment would have accrued to the FAA. The Committee believes that it is inappropriate to fund this activity from the highway trust fund. Furthermore, the Committee understands that the Department of Defense has agreed to fund costs associated with L5. The Committee has also deleted funds for the DGPS system because the primary benefit of the investment in the near-term would accrue to many other federal agencies. Furthermore, there is little, if any evidence of the pressing need for a substantial departmental investment in DGPS to support the national ITS program or the development of positive train-control rail systems. The Committee also remains concerned that the total costs for construction, operation and maintenance of DGPS over the next fifteen years could exceed $90,000,000 and that costs to develop and implement the L5 frequency have not been reliably determined but could require $100,000,000 to $200,000,000. The Committee maintains that these expenses should not be derived solely from the highway trust fund or other departmental accounts. Recognizing potential the importance of both DGPS and L5 to a wide array of strategic national purposes, the Secretary should seek to obtain funding from other federal agencies and sources and possibly other modal administrations. The department is directed to submit a report to the House and Senate Committees on Appropriations as part of the fiscal year 2000 budget justification identifying the long-term costs, benefits, and cost-sharing that might be reasonably expected for both DGPS and L5. The likely financial role of the states, other federal agencies, and the private sector in those systems should be clearly specified in terms of expected cash and in-kind contributions. The report should also address the role that DGPS will play in the national ITS program and in the development of positive train control systems. Both near-term (next five years) and long-term (next twenty years) needs should be considered. The costs/benefits of further investing in DGPS for transportation purposes, and an analysis of the actual number of highway crashes in which emergency responders are substantially delayed because of an inability to obtain exact crash locations, should also be addressed in the report. Nationwide personal transportation survey. --The Committee has not included funding within the limitation on general operating expenses for the nationwide personal transportation survey (-$1,500,000). Funding for this activity shall be available within the contract authority provided under the limitation on transportation research. National rural development program support. --The Committee has deleted funding requested for the department's share of the national rural development program (-$500,000). This program is a government-wide initiative/partnership, led by the Department of Agriculture, and is a network of rural development leaders and officials committed to the vitality of rural areas. The Committee has deleted funds for this activity for the last several years. None of the funds available to the FHWA shall support this activity in fiscal year 1999. Administrative activities of the Appalachian Regional Commission.-- The Committee has deleted funding requested to transfer $3,000,000 to the Appalachian Regional Commission to cover the administrative activities associated with the Appalachian development highway system (ADHS). Funds provided for the administrative expenses of the Appalachian Regional Commission in the fiscal year 1999 Energy and Water Development Appropriations Act, as approved by the House, are sufficient to administer the ADHS program in fiscal year 1999. Transportation needs in the national parks and related public lands. --The Committee has included $2,000,000 to carry out section 3039 of the Transportation Equity Act for the 21st Century. Within the funds provided, the Secretary is directed to undertake a comprehensive study of alternative transportation needs in the national parks and related public lands managed by federal land management agencies, and to implement activities and contracts associated with the memorandum of understanding between the departments of the Interior and Transportation dated November 25, 1997. The Committee is pleased that the department has entered into a memorandum of understanding (MOU) with the Department of the Interior. This MOU has the potential to be a model of interagency cooperation. The Committee understands that the national parks have significant transportation needs, and that the Department of Transportation, not the Department of the Interior, has the expertise in developing and implementing transportation projects. Accordingly, the Federal Highway Administration, particularly the Federal Lands division, and the Federal Transit Administration are directed to work cooperatively with each other and the Department of the Interior and the National Park Service in addressing the unique transportation requirements of the national parks. Further, the Committee directs the Federal Highway Administration and the Federal Transit Administration to review the transportation alternatives considered by the National Park Service in the Grand Canyon and Yosemite national parks to determine if all necessary and appropriate transportation planning, development, environmental and alternative analyses have been conducted to support the alternatives selected by the National Park Service. The Committee expects that the independent assessment be concluded and the results of the assessment transmitted to the House and Senate Committees on Appropriations by April 1, 1999. Inspector General audit cost reimbursement. --In addition to auditing the FHWA financial statement, office of inspector general (OIG) resources have traditionally been used for other financial audits related to the highway trust fund. For example, in the past year the OIG issued major reports on the emergency relief program and unexpended obligations on completed and inactive projects and Boston's Central Artery project. The Committee has found this work extremely useful and directs the OIG to continue such efforts. Since these financial reviews directly relate to efficient and effective use of the highway trust fund, the Committee directs that $750,000 be transferred from the FHWA's administrative takedown authorized by section 104(a) of title 23 to the office of inspector general. Motor carrier. --The Committee has provided $52,530,000 for motor carrier safety operations, which is a reduction of $2,853,000 from the budget request but an increase of three percent over the fiscal year 1998 enacted level. The office of motor carriers (OMC) has the flexibility to allocate this reduction among such expenses as travel, transportation, equipment, and other services. Within the total, the Committee expects OMC to initiate work on the rest area and shipper responsibility studies as authorized under the Transportation Equity Act for the 21st Century, as well as begin developing a separate hazardous materials safety evaluation area for SafeStat. No more than $50,000 should be allocated to the truck safety forum and no funds should be provided to the evaluation of the performance-based MCSAP because the department has the flexibility to provide funds for this activity using national priority funds from the MCSAP account. The Committee has included bill language that transfers the funds made available for the operations and activities of the office of motor carriers to the National Highway Traffic Safety Administration. The Committee believes that the office of motor carriers serves a vital safety oversight function, the activities of which are much more closely aligned with those of the National Highway Traffic Safety Administration than those of the Federal Highway Administration. The Committee directs that as part of the Federal Highway Administration's reorganization that the office of motor carriers be relocated within the National Highway Traffic Safety Administration. The Committee is concerned about OMC's tardiness in issuing final rules. It seems highly doubtful that final decisions on a major revision to the hours of service regulations or on the zero-based review will be issued within congressional deadlines. Also, it remains unclear if and when final rules will be issued on training requirements for entry-level drivers and longer-combination vehicles. The Committee is also concerned about the vitality and vigor of OMC's compliance program. The number of federally-conducted compliance reviews has decreased 33 percent from fiscal year 1995 to 1997. Likewise, the number of compliance orders and consent orders issued to problem carriers has significantly declined in recent years. These proven enforcement strategies have been used effectively for many years. The Committee believes that OMC should re-focus its efforts in these areas in light of the increasing number of fatal crashes and fatal crash rates involving commercial vehicles. The Committee remains concerned about the progress of the motor carrier regulatory relief and safety demonstration project and strongly urges the Secretary to substantially revise the project's requirements to ensure that there is sufficient carrier participation to ensure a valid pilot test. The Committee directs that the presentation of the OMC operating budget be improved substantially. The Committee expects that the budget justifications for fiscal year 2000 will include a complete description of the proposed activities, associated funding levels, and a break out of comparable activities for the prior two fiscal years. In future budget justifications, all continuing, new, and terminated activities and associated amounts all be clearly specified and related to the performance goals and measures of the OMC. The Research and Special Programs Administration's budget justification for the office of pipeline safety serves as an illustrative example of a more informative presentation. LIMITATION ON TRANSPORTATION RESEARCH Limitation, fiscal year 1998\1\ Budget estimate, fiscal year 1999\1\ Recommended in the bill ($409,150,000) xlBill compared with: Limitation, fiscal year 1998 (+409,150,000) Budget estimate, fiscal year 1999 (+409,150,000) \1\Resources available in fiscal year 1998 and requested in fiscal year 1999 were included under the limitation on general operating expenses. This limitation controls spending for the transportation research and technology contract programs of the Federal Highway Administration. This limitation includes a number of contract programs including intelligent transportation systems, surface transportation research, technology deployment, training and education, and university transportation research. In the past, funding under this limitation was provided in part from the limitation on general operating expenses and from contract authority provided in permanent law. The Committee recommends a limitation of $409,150,000. This is the same level as authorized by TEA21. Within the appropriate research areas, FHWA is directed to fund each of the research activities or programs specified in various sections of TEA21. The Committee expects the FHWA to request the Research and Technology Coordinating Committee (RTCC) of the National Academy of Sciences to review and comment on the FHWA's plans for initial implementation of all new research and technology contract programs that were not previously funded under the limitation on general operating expenses. The Committee further directs the department to submit annual justifications for the limitation on transportation research and the entire transportation research and technology contract program at the same level of detail provided in the fiscal year 1999 congressional justifications for similar programs. Within the funds provided for surface transportation research, the Committee recommends that $65,000,000 be allocated for highway research and development for the following activities: Safety $12,235,000 Pavements 11,300,000 Structures 15,200,000 Environment 5,600,000 Real estate services 365,000 Policy 6,400,000 Planning 4,000,000 Motor carrier 6,400,000 Advanced research 2,000,000 Highway operations 1,500,000 65,000,000 Within the funds provided for highway research and development, the Committee has provided up to $100,000 for the San Joaquin Valley air quality study. Safety. --The safety research and technology program develops engineering practices, analytic tools, equipment, roadside hardware, and safety promotion and public information that will significantly contribute to the reduction of highway fatalities and injuries. The Committee recommends $12,235,000 for safety research and development activities. FHWA shall implement a comprehensive research and technology program that will ensure that safety research and deployment activities receive at least the same total amount of funds that contract and LGOE monies provided during fiscal year 1997. Pavements.-- The pavement research and technology program identifies engineering practices, analytic tools, equipment, roadside hardware, and safety promotion and public information that will significantly contribute to the reduction of highway fatalities and injuries. For fiscal year 1999, the Committee recommends $11,300,000. Structures.-- The structures research and technology program develops technologies, advanced materials and methods to efficiently maintain and renew the aging transportation infrastructure, improve existing infrastructure performance, and enable efficient infrastructure response and quick recovery after major disasters. For fiscal year 1999, the Committee recommends $15,200,000. Environment.-- The environment research and technology develops improved tools for assessing highway impacts on the environment; techniques for the avoidance, detection, and mitigation of those impacts and for the enhancement of the environment; and expertise on environmental concerns within FHWA and state and local transportation agencies. for fiscal year 1999, the Committee recommends $5,600,000. Real estate services.-- The real estate research and technology program improves the public's access to activities, goods and services through developing: improved tools for assessing highway impacts on property owners and displaced persons; innovative techniques in acquiring real property; and right-of-way acquisition expertise within the FHWA and local transportation agencies. For fiscal year 1999, the Committee recommends $365,000. Policy research. --The policy research and technology program supports FHWA policy analysis and development, strategic planning, and technology development through research in data collection, management and dissemination; highway financing, investment analysis, and performance measurement; and enhancing highway program contributions to economic productivity, efficiency, and other national goals. The Committee recommends $6,400,000 for policy research, including $1,800,000 for the National Personal Transportation Survey (NPTS). The Committee is not convinced of the need to update the NPTS continuously and FHWA should plan on completing the next edition of that study as soon as practicable. Sufficient funds to initiate more than one half of the project are provided. FHWA should develop a work plan being certain to limit the scope and size of the NPTS to essential questions of importance to both the states and Federal Government users. Planning. --The planning research and technology program advances cost effective methods to evaluate transportation strategies and investments; develops and disseminates improved planning methods; develops more effective planning and data collection techniques for intermodal passenger and freight planning and programming; improves financial planning tools for use in developing transportation plans and programs; evaluates the characteristics of the National Highway System; and develops improved analytical tools to support metropolitan and statewide planning and for information and data sharing with state and local governments. The Committee's allowance includes $4,000,000 for planning research, including $1,000,000 for modifying the TRANSIMS to be useable for ITS purposes. None of the funds made available in the surface transportation research subaccount shall be used to conduct research related to sustainability and its role in transportation planning. Motor carrier research. --The motor carrier research and technology program seeks to reduce the number and severity of commercial driver-caused crashes, fatalities and injuries, and hazardous materials incidents by employing the results of long-term human factors research, data collection and analyses to generate effective means of education, outreach and wellness promotion for all drivers. The program is designed to: achieve increased state participation in motor carrier compliance and enforcement activities, while increasing carrier operational efficiency; lower the motor carrier industry's regulatory compliance costs; and promote the medical fitness of drivers. The Committee has provided $6,400,000 for motor carrier research. Advanced research. --The advanced research program addresses longer-term, higher risk research that shows potential benefits for improving the durability, efficiency, environmental impact, productivity, and safety of highway systems. The Secretary is directed to ensure that FHWA is delegated the responsibility to manage and coordinate this important program. Because of its years of experience in promoting advanced research, its depth of technical expertise and contacts with the university community, and the close relationship between its mission and the stated legislative purposes of the advanced research program in TEA21, FHWA is the most appropriate entity to manage the advanced research program within the department. FHWA is expected to seek appropriate input from other modal administrations in project selection. Additional funds for the program are to be derived from appropriate accounts. Technology assessment and deployment. --The technology assessment and deployment program identifies and assesses innovative research results, technology, and products and promotes the application of those advances that are determined to be of potential benefit to the highway community by providing increased productivity, safety, and operations. Within the funds provided for surface transportation research, the Committee recommends $14,000,000 for technology assessment and deployment activities. The Committee directs that at least $2,600,000 of those funds be used for traffic and motor carrier activities, and $4,000,000 for safety and design, as requested in the budget. That allocation will ensure sufficient funds for the necessary deployment of key safety initiatives. For many years, the Committee has supported the development and initial deployment of integrated highway safety information systems. Partially as a result of FHWA's highway safety information system project, eight states have improved their analytical capabilities. FHWA is encouraged to assist an increased number of states that wish to deploy integrated information systems. One way to accomplish that objective would be to expedite the technology transfer of reliable data systems by developing and demonstrating an integrated safety information system (ISIS) model. The ISIS model will demonstrate the benefits to safety management of linking data on crashes, highway infrastructure inventory, traffic information flows, motor carriers, and medical outcomes (EMS, emergency medical departments, and hospital discharge). The FHWA is expected to work with states to encourage improved, linked data systems and to seek proposals from state agencies which would like to implement the ISIS model. The Committee expects that a substantial portion of the national technology deployment program funds will be used to achieve specific high payoff safety objectives, including improved safety of driving at night and other periods of reduced visibility or activities to reduce run-off-the-road crashes. FHWA should be prepared to report back to the Committee next year on specific and measurable safety and other goals. Research and technology support. --Within the funds provided for surface transportation research, the Committee recommends $7,500,000 for research and technology support. Research and technology support funds information sharing on planned research activities, research in progress, and research results nationwide in order to avoid duplication of efforts, identified voids where further work is needed, and disseminates research results to advance the state-of-the-art and the state-of-the-practice in transportation. TEA21 reduces the small business innovative research costs of the program. Consequently, the Committee recommends a $2,500,000 reduction in support funds because of the recent change in law and the need to reduce other support costs. ITS standards, research, operational tests and development. --The Committee recommends that the $95,000,000 provided in TEA21 for ITS research be allocated in the following manner: Research and development $38,000,000 Operational tests 17,000,000 Evaluation 6,000,000 Architecture and standards 18,000,000 Mainstreaming 6,000,000 Program support 10,000,000 -------------- Total 95,000,000 Research and development. --The research and development program supports the research and development of new ITS technologies to improve the safety, mobility, and productivity of the surface transportation system. Because similar funds are provided under various provisions specified in TEA21, funds for the ITS research centers of excellence have been deleted. The Committee's allowance specifies that $6,000,000 shall be allocated for commercial vehicle research, and includes funds to advance and test the expansion of the mailbox project to involve a third region of the country, and to conduct research leading towards advances in roadside inspection technology. Funds for ITS/grade crossing work have been deleted because of the availability of prior year funding. Evidence of strong industry financial participation in the intermodal freight research project will be essential to continue funding in that area. The Committee directs the director of the joint program office to ensure that the primary federal role in the intelligent vehicle initiative (IVI) is focused on expediting the innovation of integrated crash avoidance technologies for passenger vehicles. In view of the substantial human factors research, performance specification work, crash avoidance and information systems integration, and cost/benefit assessment work that remains to be completed, an IVI program focused on those critical safety issues is of foremost importance. Consequently, the Committee recommends $20,000,000 for research and development to advance crash avoidance technologies for passenger vehicle operators and related human factors research. Such activities as automation of transit vehicles, snow removal systems, and other highway maintenance vehicles and research on non-safety components of the IVI should receive a much lower priority than critical safety objectives. In carrying out research into crash avoidance, the Committee encourages the JPO to work with George Washington University and Louisiana State University. The recent NAS review of the automated highway systems program underscored the need for periodic, outside review of major projects such as the IVI. Within the funds provided, the director of the JPO shall ensure that an external review of the emerging IVI program is periodically conducted at least once every two years and the results of that review are made widely available. The Committee further directs the director of the JPO to prepare a five-year strategic plan documenting the future challenges, scope and direction of the IVI program. The plan shall be submitted to the House and Senate Committees on Appropriations as part of the budget justification for fiscal year 2000. The Committee notes that TEA21 provides for $1,300,000,000 for ITS programs and projects over the next six years. The department is obligated to ensure that these funds are used efficiently and effectively to develop the nation's future transportation system. The Inspector General is directed to audit the program and expenditure of funds provided for ITS activities to ensure that they are used in the most cost-effective and efficient manner, consistent with federal law and regulation. Operational tests. --The operational tests program provides a bridge between research and development and large-scale deployment through the technical testing of ITS technologies and by addressing institutional barriers. The Committee's allowance includes $10,000,000 requested for operational testing of intelligent passenger vehicles. Funding for IVI work on commercial vehicles is limited to a maximum of $2,500,000. Limited success and actual application of other drowsy driving detection or fatigue management initiatives previously supported by OMC suggest a cautious approach. Evaluations program.-- The evaluations program provides a rigorous analysis of the costs and benefits of ITS user services and the overall impact of the ITS program through the evaluation of operational tests, tracking of ITS deployments, and the assessment of ITS programs and policies. The Committee recommends $6,000,000 for program evaluation studies and recognizes the importance of continuing to evaluate the benefits and costs of various ITS projects and tracking progress on those projects. Funds for policy assessments shall be limited $1,500,000 or less. Architecture and standards. --The architecture and standards program provides for the maintenance, enhancement and application of the national ITS architecture and the development and testing of ITS standards. The Committee recommends $18,000,000 for architecture and standards work. The director of the JPO is urged to make maximum use of the leverage provided in the reauthorization statute to ensure the implementation of the standards necessary for interoperability. The Committee encourages the JPO to work with states and municipalities to ensure that intelligent transportation systems developed and deployed with federal funds are interoperable and can be adopted to provide seamless transportation services, particularly on interstate highways. Mainstreaming. --The mainstreaming program supports training and technical guidance for federal, state, and local professionals charged with implementing integrated ITS systems. The Committee continues to assert that the department is spending too much of its scarce ITS resources trying to convince planners, the engineering community and others of the benefits of ITS. There is substantial literature documenting the benefits of building ``smarter'' using ITS; numerous training courses and programs are well underway; and the ITS concept is beginning to be mainstreamed in the transportation community. Consequently, the Committee's allowance deletes funds for grass roots involvement (-$535,000), eliminates funds for cooperation with transit companies (-$350,000), and reduces funds for commercial vehicle operations mainstreaming to a maximum of $500,000. The Committee recommendation also reduces funding for planning/policy mainstreaming activities to less than $1,000,000 and denies funds to establish the role of ITS in supporting FHWA/FTA mobility goals. The Committee also denies funds for ITS awareness and advocacy (-$2,000,000). Publication funds should be included as an integral part of related activities. Remaining mainstreaming funds shall be used to provide technical assistance on the planning, procurement, and implementation of integrated ITS technologies, offer guidance on the use of the national architecture, and supplement critical training not available from the private sector or universities. Joint program office. --The Committee wishes to repeat its longstanding interest in ensuring that the department continues to maintain the joint program office (JPO) as the coordinating entity of federal involvement in the national ITS program. The Committee directs that the JPO continue to have final budgetary authority over the allocation of ITS funds among the various modes and projects. It is essential that the JPO ensures that cross cutting issues are addressed, human factors research is coordinated, evaluation efforts are comprehensive and focused, and priorities are analytically determined so that national interests are served rather than any specific modal interest. The Committee believes that the only way to achieve those objectives is to maintain the JPO as an independent entity within the department. Given the intermodal nature of ITS, the director of the JPO shall continue to report to the Deputy Secretary as well as the FHWA Administrator. The Secretary is directed to ensure that not less than 17 positions are allocated to the JPO during fiscal year 1999. National ITS program plan. --The Committee looks forward to receiving as soon as possible an update of the national ITS program plan, which shall be prepared in a manner consistent with the requirements of Section 5205 of TEA21. In developing the plan, the director of the JPO shall make effective use of the federal advisory committee for intelligent transportation systems. ITS deployment projects. --It is the intent of the Committee that the following projects contribute to the integration and interoperability of intelligent transportation systems in metropolitan and rural areas as provided under section 5208 of the TEA21 and promote deployment of the commercial vehicle intelligent transportation system infrastructure as provided under section 5209 of the TEA21. These projects shall conform to the requirements set forth in these sections, including the project selection criteria contained in section 5208(b) and the priority areas outlined in section 5209(c), respectively. Funds provided in TEA21 for ITS deployment activities are to be made available as follows: Project Amount Amherst/Northampton, Massachusetts $1,000,000 Arlington County, Virginia 750,000 Blacksburg, Virginia 2,000,000 Centre Valley, Pennsylvania 1,000,000 Cleveland, Ohio 2,000,000 Corpus Christi, Texas 1,000,000 Dade County, Florida 2,000,000 Del Rio, Texas 1,500,000 Fairfield, California 1,000,000 Fitchburg, Massachusetts 500,000 Greater metropolitan capital region, DC 8,000,000 Hammond, Louisiana 6,000,000 Houston, Texas 2,500,000 Huntington Beach, California 1,000,000 Huntsville, Alabama 1,000,000 Inglewood, California 2,250,000 Laredo, Texas 2,000,000 Las Vegas, Nevada 2,000,000 Middlesboro, Kentucky 6,000,000 Mission Viejo, California 2,000,000 New Orleans, Louisiana 2,000,000 New York City, New York 5,000,000 Pearl River County, Mississippi 1,000,000 Port Angeles, Washington 500,000 Riverside County, California 2,000,000 San Francisco, California 3,000,000 Scranton, Pennsylvania 2,000,000 Silicon Valley, California 3,000,000 Springfield, Virginia 500,000 State of Idaho 1,000,000 State of Maryland 3,000,000 State of Minnesota 12,000,000 State of New York 5,000,000 State of North Dakota 1,500,000 State of Utah 5,000,000 State of Washington 500,000 Temucula, California 250,000 Tucson, Arizona 1,000,000 Volusia County, Florida 2,000,000 Warren County, Virginia 250,000 Wausau-Stevens Point-Wisconsin Rapids, Wisconsin 1,000,000 White Plains, New York 1,000,000 FEDERAL-AID HIGHWAYS (LIQUIDATION OF CONTRACT AUTHORIZATION) (HIGHWAY TRUST FUND) Appropriation, fiscal year 1998 $20,800,000,000 Budget estimate fiscal year 1999 23,000,000,000 Recommended in the bill 24,000,000,000 xlBill compared with: Appropriation, fiscal year 1998 +3,200,000,000 Budget estimate, fiscal year 1999 +1,000,000,000 The Committee recommends a liquidating cash appropriation of $24,000,000,000. This is an increase of $3,200,000,000 over the fiscal year 1998 enacted level and is needed to pay the outstanding obligations of the various highway programs at levels anticipated in TEA21. This appropriation is mandatory and has no scoring effect. federal-aid highways programs Federal-aid highways and bridges are managed through a federal-state partnership. States and localities maintain ownership and responsibility for maintenance, repair and new construction of roads. State highway departments have the authority to initiate federal-aid projects subject to FHWA approval of plans, specifications, and cost estimates. The federal government provides financial support for construction and repair through matching grants, the terms of which vary with the type of road. There are almost four million miles of public roads in the United States and approximately 577,000 bridges. The Federal Government provides grants to states to assist in financing the construction and preservation of about 945,000 miles (24 percent) of these roads, which represents an extensive interstate system plus key feeder and collector routes. Highways eligible for federal aid carry about 85 percent of total U.S. highway traffic. The recently-passed Transportation Equity Act for the 21st Century (TEA21) reauthorized highway, highway safety, transit, and other surface transportation programs through fiscal year 2003. The TEA21 builds on programs and other initiatives established in the Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991, the previous major authorizing legislation for surface transportation programs. Under the TEA21, Federal-aid highways funds are made available through the following major programs: |